If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
| Well ID: 37-123-46549 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":41.63625,"lon":-78.98075,"icon":""}]} |
| Country: United States | |
| State: Pennsylvania | |
| County: Warren | |
| Municipality: Sheffield Township | |
| Operator Name: CAMERON ENERGY CO | |
| Well Pad ID: | |
| Farm/Lease Name: LOT 8 | |
| License Status: Active | |
| Spud Date: 2012-03-01 | |
| Permit Date: 2011-10-14 | |
| Well Type: OIL | |
| Unconventional Well: N | |
| Configuration: Vertical Well | |
| Conservation: No | |
| Latitude: 41.636250 | |
| Longitude: -78.980750 |
| Date | Event |
|---|---|
| 2011-10-14 | New Permit Application |
| 2012-03-01 | Performed Spud Operation |
| 2012-03-02 | Drilling Completion |
| 2013-08-19 | Perforation |
| 2013-08-21 | Performed Stage 1 of Stimulation |
| 2013-08-21 | Performed Stage 10 of Stimulation |
| 2013-08-21 | Performed Stage 11 of Stimulation |
| 2013-08-21 | Performed Stage 12 of Stimulation |
| 2013-08-21 | Performed Stage 13 of Stimulation |
| 2013-08-21 | Performed Stage 2 of Stimulation |
| 2013-08-21 | Performed Stage 3 of Stimulation |
| 2013-08-21 | Performed Stage 4 of Stimulation |
| 2013-08-21 | Performed Stage 5 of Stimulation |
| 2013-08-21 | Performed Stage 6 of Stimulation |
| 2013-08-21 | Performed Stage 7 of Stimulation |
| 2013-08-21 | Performed Stage 8 of Stimulation |
| 2013-08-21 | Performed Stage 9 of Stimulation |
| 2019-03-25 | Newly Drilled |
For data sources see[4]
| Stimulation Date | Phase Number | Chemical Agent | Volume (gal) | Treating Pressure (psi) | Breakdown Pressure (psi) |
|---|---|---|---|---|---|
| 2013-08-21 | 1 | Ottawa | 103,488 | 1,400 | 2,100 |
| 2013-08-21 | 2 | Ottawa | 103,488 | 1,600 | 1,800 |
| 2013-08-21 | 3 | Ottawa | 103,488 | 1,800 | 4,000 |
| 2013-08-21 | 4 | Ottawa | 103,488 | 2,700 | 2,000 |
| 2013-08-21 | 5 | Ottawa | 103,488 | 2,100 | 2,300 |
| 2013-08-21 | 6 | Ottawa | 103,488 | 1,600 | 2,000 |
| 2013-08-21 | 7 | Ottawa | 103,488 | 1,600 | 2,300 |
| 2013-08-21 | 8 | Ottawa | 103,488 | 1,700 | 2,800 |
| 2013-08-21 | 9 | Ottawa | 103,488 | 1,800 | 2,100 |
| 2013-08-21 | 10 | Ottawa | 103,488 | 2,100 | 2,500 |
| 2013-08-21 | 11 | Ottawa | 103,488 | 2,200 | 3,400 |
| 2013-08-21 | 12 | Ottawa | 103,488 | 2,400 | 3,400 |
| 2013-08-21 | 13 | Ottawa | 103,488 | 3,200 | 4,000 |
For data sources see[5]
| Period | Operator Name | Gas Quantity (mcf) | Gas Production Days | Oil Quantity (bbl) | Oil Production Days | Water Quantity (bbl) | Water Production Days |
|---|---|---|---|---|---|---|---|
| 2011 | DUHRING RESOURCE CO | 673.77 | 365 | 153.56 | 365 | 0.00 | 0 |
| 2012 | DUHRING RESOURCE CO | 559.09 | 365 | 139.23 | 365 | 0.02 | 365 |
| 2013 | CAMERON ENERGY CO | 496.65 | 365 | 260.58 | 365 | 0 | 365 |
| 2014 | CAMERON ENERGY CO | 768.89 | 365 | 317.48 | 365 | 0 | 365 |
| 2015 | CAMERON ENERGY CO | 932.97 | 365 | 162.77 | 365 | 0 | 365 |
| 2016 | CAMERON ENERGY CO | 797.87 | 365 | 166.63 | 365 | 0 | 365 |
| 2017 | CAMERON ENERGY CO | 783.11 | 365 | 199.12 | 365 | 0.00 | 0 |
| 2018 | CAMERON ENERGY CO | 1,087.23 | 365 | 133.38 | 365 | 0.00 | 0 |
For data sources see[6]
| Period | Operator | Waste Type | Quantity | Disposal Method | Waste Facility ID |
|---|---|---|---|---|---|
| 2011 | DUHRING RESOURCE CO | Produced Fluid | 14.80 Bbl | CENTRALIZED TREATMENT PLANT FOR RECYCLE | PA0102784 |
| 2011 | DUHRING RESOURCE CO | Fracing Fluid Waste | 1.85 Bbl | CENTRALIZED TREATMENT PLANT FOR RECYCLE | PA0102784 |
| 2012 | DUHRING RESOURCE CO | Fracing Fluid Waste | 0.69 Bbl | CENTRALIZED TREATMENT PLANT FOR RECYCLE | PA0102784 |
| 2012 | DUHRING RESOURCE CO | Produced Fluid | 9.74 Bbl | CENTRALIZED TREATMENT PLANT FOR RECYCLE | PA0102784 |
| 2013 | CAMERON ENERGY CO | Produced Fluid | 4.00 Bbl | REUSE OTHER THAN ROAD SPREADING | |
| 2013 | CAMERON ENERGY CO | Fracing Fluid Waste | 4.00 Bbl | REUSE OTHER THAN ROAD SPREADING | |
| 2013 | CAMERON ENERGY CO | Produced Fluid | 10.63 Bbl | CENT WASTE TRT FAC NPDES DISCHARGE | PA0102784 |
| 2014 | CAMERON ENERGY CO | Fracing Fluid Waste | 2.86 Bbl | REUSE OTHER THAN ROAD SPREADING | |
| 2014 | CAMERON ENERGY CO | Produced Fluid | 11.43 Bbl | REUSE OTHER THAN ROAD SPREADING | |
| 2015 | CAMERON ENERGY CO | Produced Fluid | 7.14 Bbl | REUSE OTHER THAN ROAD SPREADING | |
| 2015 | CAMERON ENERGY CO | Produced Fluid | 14.29 Bbl | CENT WASTE TRT FAC NPDES DISCHARGE | PA0102784 |
| 2016 | CAMERON ENERGY CO | Fracturing Fluid Waste | 0.77 Bbl | REUSE OTHER THAN ROAD SPREADING | |
| 2016 | CAMERON ENERGY CO | Produced Fluid | 5.38 Bbl | REUSE OTHER THAN ROAD SPREADING | |
| 2017 | CAMERON ENERGY CO | Produced Fluid | 8.70 Bbl | REUSE OTHER THAN ROAD SPREADING | |
| 2017 | CAMERON ENERGY CO | Unused Fracturing Fluid Waste | 19.57 Bbl | REUSE OTHER THAN ROAD SPREADING | |
| 2018 | CAMERON ENERGY CO | Produced Fluid | 5.33 Bbl | REUSE OTHER THAN ROAD SPREADING | |
| 2018 | CAMERON ENERGY CO | Unused Fracturing Fluid Waste | 4.65 Bbl | REUSE OTHER THAN ROAD SPREADING | |
| 2019 | CAMERON ENERGY CO | Produced Fluid | 5.33 Bbl | REUSE AT A CONVENTIONAL WELL SITE IN PA |
For data sources see[7]
| Inspection ID | Inspection Category | Inspection Date | Inspection Type | Inspection Result | Inspection Comments |
|---|---|---|---|---|---|
| 2266146 | Primary Facility | 2014-04-16 | Routine/Complete Inspection | No Violations Noted | |
| 2437107 | Primary Facility | 2015-12-30 | Site Restoration | No Violations Noted | Conventional oil well completed and appears operational. The pit has been properly closed and the there appears to be adaquate vegetative cover. No violations noted at this time |
| 2824830 | Primary Facility | 2019-01-10 | Administrative/File Review | No Violations Noted |
For data sources see[8]