If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 37-123-47327 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":41.634417,"lon":-79.069,"icon":""}]} |
Country: United States | |
State: Pennsylvania | |
County: Warren | |
Municipality: Sheffield Township | |
Operator Name: CAMERON ENERGY CO | |
Well Pad ID: | |
Farm/Lease Name: WARRANT 2877 | |
License Status: Active | |
Spud Date: 2014-04-01 | |
Permit Date: 2013-07-26 | |
Well Type: OIL | |
Unconventional Well: N | |
Configuration: Vertical Well | |
Conservation: No | |
Latitude: 41.634417 | |
Longitude: -79.0690 |
Date | Event |
---|---|
2013-07-26 | New Permit Application |
2014-04-01 | Performed Spud Operation |
2014-04-03 | Drilling Completion |
2014-10-14 | Perforation |
2014-10-16 | Performed Stage 1 of Stimulation |
2014-10-16 | Performed Stage 10 of Stimulation |
2014-10-16 | Performed Stage 11 of Stimulation |
2014-10-16 | Performed Stage 2 of Stimulation |
2014-10-16 | Performed Stage 3 of Stimulation |
2014-10-16 | Performed Stage 4 of Stimulation |
2014-10-16 | Performed Stage 5 of Stimulation |
2014-10-16 | Performed Stage 6 of Stimulation |
2014-10-16 | Performed Stage 7 of Stimulation |
2014-10-16 | Performed Stage 8 of Stimulation |
2014-10-16 | Performed Stage 9 of Stimulation |
2019-04-30 | Newly Drilled |
For data sources see[4]
Stimulation Date | Phase Number | Chemical Agent | Volume (gal) | Treating Pressure (psi) | Breakdown Pressure (psi) |
---|---|---|---|---|---|
2014-10-16 | 1 | Ottawa | 96,936 | 2,300 | 2,600 |
2014-10-16 | 2 | Ottawa | 96,936 | 1,900 | 1,900 |
2014-10-16 | 3 | Ottawa | 96,936 | 2,400 | 3,800 |
2014-10-16 | 4 | Ottawa | 96,936 | 2,500 | 2,200 |
2014-10-16 | 5 | Ottawa | 96,936 | 2,100 | 3,500 |
2014-10-16 | 6 | Ottawa | 96,936 | 2,500 | 2,900 |
2014-10-16 | 7 | Ottawa | 96,936 | 2,700 | 3,200 |
2014-10-16 | 8 | Ottawa | 96,936 | 2,400 | 3,400 |
2014-10-16 | 9 | Ottawa | 96,936 | 2,900 | 4,100 |
2014-10-16 | 10 | Ottawa | 96,936 | 3,000 | 4,000 |
2014-10-16 | 11 | Ottawa | 96,936 | 3,500 | 4,000 |
For data sources see[5]
Period | Operator Name | Gas Quantity (mcf) | Gas Production Days | Oil Quantity (bbl) | Oil Production Days | Water Quantity (bbl) | Water Production Days |
---|---|---|---|---|---|---|---|
2014 | CAMERON ENERGY CO | 30.6 | 75 | 93.10 | 75 | 0 | 75 |
2015 | CAMERON ENERGY CO | 143.14 | 365 | 395.51 | 365 | 0 | 365 |
2016 | CAMERON ENERGY CO | 194.08 | 365 | 255.80 | 365 | 0 | 365 |
2017 | CAMERON ENERGY CO | 153.29 | 365 | 278.73 | 365 | 0.00 | 0 |
2018 | CAMERON ENERGY CO | 100.71 | 365 | 297.76 | 365 | 0.00 | 0 |
2019 | CAMERON ENERGY CO | 107.41 | 365 | 270.90 | 365 | 0.00 | 0 |
For data sources see[6]
Period | Operator | Waste Type | Quantity | Disposal Method | Waste Facility ID |
---|---|---|---|---|---|
2014 | CAMERON ENERGY CO | Fracing Fluid Waste | 10.00 Bbl | REUSE OTHER THAN ROAD SPREADING | |
2014 | CAMERON ENERGY CO | Produced Fluid | 20.00 Bbl | REUSE OTHER THAN ROAD SPREADING | |
2015 | CAMERON ENERGY CO | Produced Fluid | 0.00 Bbl | REUSE OTHER THAN ROAD SPREADING | |
2016 | CAMERON ENERGY CO | Fracturing Fluid Waste | 4.17 Bbl | REUSE OTHER THAN ROAD SPREADING | |
2016 | CAMERON ENERGY CO | Produced Fluid | 33.33 Bbl | REUSE OTHER THAN ROAD SPREADING | |
2017 | CAMERON ENERGY CO | Unused Fracturing Fluid Waste | 111.76 Bbl | REUSE OTHER THAN ROAD SPREADING | |
2017 | CAMERON ENERGY CO | Produced Fluid | 35.29 Bbl | REUSE OTHER THAN ROAD SPREADING | |
2018 | CAMERON ENERGY CO | Produced Fluid | 35.94 Bbl | REUSE OTHER THAN ROAD SPREADING | |
2018 | CAMERON ENERGY CO | Unused Fracturing Fluid Waste | 17.65 Bbl | REUSE OTHER THAN ROAD SPREADING | |
2019 | CAMERON ENERGY CO | Produced Fluid | 29.09 Bbl | REUSE AT A CONVENTIONAL WELL SITE IN PA | |
2019 | CAMERON ENERGY CO | Unused Fracturing Fluid Waste | 10.91 Bbl | REUSE AT A CONVENTIONAL WELL SITE IN PA |
For data sources see[7]
Inspection ID | Inspection Category | Inspection Date | Inspection Type | Inspection Result | Inspection Comments |
---|---|---|---|---|---|
2240368 | Primary Facility | 2014-01-23 | Routine/Complete Inspection | No Violations Noted | |
2261111 | Primary Facility | 2014-04-08 | Routine/Complete Inspection | No Violations Noted | |
2340043 | Primary Facility | 2015-02-02 | Administrative/File Review | No Violations Noted | |
2424407 | Primary Facility | 2015-11-09 | Routine/Complete Inspection | No Violations Noted | Conventional oil well completed and in operation at the time of inspection. The well site was stable. No violations noted at this time |
2500253 | Primary Facility | 2016-07-08 | Site Restoration | No Violations Noted | Conventional oil well completed and appeared operational at the time of inspection. The frac pit had been properly closed and there appeared to be adaquate vegetative cover. No violations noted at this time. |
2824750 | Primary Facility | 2019-01-10 | Administrative/File Review | No Violations Noted |
For data sources see[8]