If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 37-123-47528 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":41.638639,"lon":-78.976278,"icon":""}]} |
Country: United States | |
State: Pennsylvania | |
County: Warren | |
Municipality: Sheffield Township | |
Operator Name: CAMERON ENERGY CO | |
Well Pad ID: | |
Farm/Lease Name: LOT 9 | |
License Status: Active | |
Spud Date: 2014-05-27 | |
Permit Date: 2014-02-20 | |
Well Type: OIL | |
Unconventional Well: N | |
Configuration: Vertical Well | |
Conservation: No | |
Latitude: 41.638639 | |
Longitude: -78.976278 |
Date | Event |
---|---|
2014-02-20 | New Permit Application |
2014-05-27 | Performed Spud Operation |
2014-05-29 | Drilling Completion |
2014-06-09 | Perforation |
2014-06-11 | Performed Stage 1 of Stimulation |
2014-06-11 | Performed Stage 10 of Stimulation |
2014-06-11 | Performed Stage 11 of Stimulation |
2014-06-11 | Performed Stage 12 of Stimulation |
2014-06-11 | Performed Stage 13 of Stimulation |
2014-06-11 | Performed Stage 2 of Stimulation |
2014-06-11 | Performed Stage 3 of Stimulation |
2014-06-11 | Performed Stage 4 of Stimulation |
2014-06-11 | Performed Stage 5 of Stimulation |
2014-06-11 | Performed Stage 6 of Stimulation |
2014-06-11 | Performed Stage 7 of Stimulation |
2014-06-11 | Performed Stage 8 of Stimulation |
2014-06-11 | Performed Stage 9 of Stimulation |
2019-04-30 | Newly Drilled |
For data sources see[4]
Stimulation Date | Phase Number | Chemical Agent | Volume (gal) | Treating Pressure (psi) | Breakdown Pressure (psi) |
---|---|---|---|---|---|
2014-06-11 | 1 | Ottawa | 119,658 | 1,600 | 1,700 |
2014-06-11 | 2 | Ottawa | 119,658 | 2,300 | 3,200 |
2014-06-11 | 3 | Ottawa | 119,658 | 2,400 | 2,500 |
2014-06-11 | 4 | Ottawa | 119,658 | 2,500 | 2,800 |
2014-06-11 | 5 | Ottawa | 119,658 | 2,500 | 2,600 |
2014-06-11 | 6 | Ottawa | 119,658 | 2,500 | 3,400 |
2014-06-11 | 7 | Ottawa | 119,658 | 3,000 | 2,400 |
2014-06-11 | 8 | Ottawa | 119,658 | 2,900 | 4,000 |
2014-06-11 | 9 | Ottawa | 119,658 | 3,700 | 4,200 |
2014-06-11 | 10 | Ottawa | 119,658 | 2,700 | 3,500 |
2014-06-11 | 11 | Ottawa | 119,658 | 2,500 | 3,500 |
2014-06-11 | 12 | Ottawa | 119,658 | 3,100 | 4,000 |
2014-06-11 | 13 | Ottawa | 119,658 | 3,800 | 3,500 |
For data sources see[5]
Period | Operator Name | Gas Quantity (mcf) | Gas Production Days | Oil Quantity (bbl) | Oil Production Days | Water Quantity (bbl) | Water Production Days |
---|---|---|---|---|---|---|---|
2014 | CAMERON ENERGY CO | 702.7 | 365 | 164.66 | 365 | 0 | 365 |
2015 | CAMERON ENERGY CO | 653.58 | 365 | 152.78 | 365 | 0 | 365 |
2016 | CAMERON ENERGY CO | 592.89 | 365 | 122.16 | 365 | 0 | 365 |
2017 | CAMERON ENERGY CO | 580.98 | 365 | 105.86 | 365 | 0.00 | 0 |
2018 | CAMERON ENERGY CO | 528.70 | 365 | 82.16 | 365 | 0.00 | 0 |
For data sources see[6]
Period | Operator | Waste Type | Quantity | Disposal Method | Waste Facility ID |
---|---|---|---|---|---|
2014 | CAMERON ENERGY CO | Fracing Fluid Waste | 0.79 Bbl | REUSE OTHER THAN ROAD SPREADING | |
2014 | CAMERON ENERGY CO | Produced Fluid | 6.75 Bbl | CENT WASTE TRT FAC NPDES DISCHARGE | PA0102784 |
2014 | CAMERON ENERGY CO | Produced Fluid | 3.97 Bbl | REUSE OTHER THAN ROAD SPREADING | |
2015 | CAMERON ENERGY CO | Produced Fluid | 3.17 Bbl | REUSE OTHER THAN ROAD SPREADING | |
2015 | CAMERON ENERGY CO | Produced Fluid | 1.06 Bbl | CENT WASTE TRT FAC NPDES DISCHARGE | PA0102784 |
2015 | CAMERON ENERGY CO | Fracing Fluid Waste | 0.75 Bbl | REUSE OTHER THAN ROAD SPREADING | |
2016 | CAMERON ENERGY CO | Produced Fluid | 5.26 Bbl | REUSE OTHER THAN ROAD SPREADING | |
2017 | CAMERON ENERGY CO | Produced Fluid | 5.45 Bbl | REUSE OTHER THAN ROAD SPREADING | |
2018 | CAMERON ENERGY CO | Produced Fluid | 7.39 Bbl | REUSE OTHER THAN ROAD SPREADING | |
2019 | CAMERON ENERGY CO | Produced Fluid | 6.65 Bbl | REUSE AT A CONVENTIONAL WELL SITE IN PA |
For data sources see[7]
Inspection ID | Inspection Category | Inspection Date | Inspection Type | Inspection Result | Inspection Comments |
---|---|---|---|---|---|
2275719 | Primary Facility | 2014-05-27 | Drilling/Alteration | No Violations Noted | |
2281657 | Primary Facility | 2014-06-26 | Administrative/File Review | No Violations Noted | |
2289483 | Primary Facility | 2014-07-25 | Administrative/File Review | No Violations Noted | |
2291451 | Primary Facility | 2014-07-24 | Routine/Complete Inspection | No Violations Noted | |
2437149 | Primary Facility | 2015-12-30 | Site Restoration | No Violations Noted | Conventional oil well completed and appears operational. The pit has been properly closed and the there appears to be adaquate vegetative cover. No violations noted at this time |
2824818 | Primary Facility | 2019-01-10 | Administrative/File Review | No Violations Noted |
For data sources see[8]