If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 37-123-47977 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":41.63125,"lon":-79.006278,"icon":""}]} |
Country: United States | |
State: Pennsylvania | |
County: Warren | |
Municipality: Sheffield Township | |
Operator Name: CAMERON ENERGY CO | |
Well Pad ID: | |
Farm/Lease Name: DAVIS LOT 7 | |
License Status: Active | |
Spud Date: 2016-12-13 | |
Permit Date: 2016-06-06 | |
Well Type: OIL | |
Unconventional Well: N | |
Configuration: Vertical Well | |
Conservation: No | |
Latitude: 41.631250 | |
Longitude: -79.006278 |
Date | Event |
---|---|
2016-06-06 | New Permit Application |
2016-12-13 | Performed Spud Operation |
2017-01-03 | Drilling Completion |
2017-02-02 | Perforation |
2017-02-07 | Performed Stage 1 of Stimulation |
2017-02-07 | Performed Stage 10 of Stimulation |
2017-02-07 | Performed Stage 11 of Stimulation |
2017-02-07 | Performed Stage 12 of Stimulation |
2017-02-07 | Performed Stage 13 of Stimulation |
2017-02-07 | Performed Stage 14 of Stimulation |
2017-02-07 | Performed Stage 15 of Stimulation |
2017-02-07 | Performed Stage 16 of Stimulation |
2017-02-07 | Performed Stage 17 of Stimulation |
2017-02-07 | Performed Stage 18 of Stimulation |
2017-02-07 | Performed Stage 19 of Stimulation |
2017-02-07 | Performed Stage 2 of Stimulation |
2017-02-07 | Performed Stage 20 of Stimulation |
2017-02-07 | Performed Stage 21 of Stimulation |
2017-02-07 | Performed Stage 3 of Stimulation |
2017-02-07 | Performed Stage 4 of Stimulation |
2017-02-07 | Performed Stage 5 of Stimulation |
2017-02-07 | Performed Stage 6 of Stimulation |
2017-02-07 | Performed Stage 7 of Stimulation |
2017-02-07 | Performed Stage 8 of Stimulation |
2017-02-07 | Performed Stage 9 of Stimulation |
2017-02-20 | Perforation |
2019-05-09 | Newly Drilled |
For data sources see[4]
Stimulation Date | Phase Number | Chemical Agent | Volume (gal) | Treating Pressure (psi) | Breakdown Pressure (psi) |
---|---|---|---|---|---|
2017-02-07 | 1 | Ottawa | 43,890 | 1,800 | 2,800 |
2017-02-07 | 2 | Ottawa | 43,890 | 1,800 | 3,200 |
2017-02-07 | 3 | Ottawa | 43,890 | 2,100 | 2,800 |
2017-02-07 | 4 | Ottawa | 43,890 | 2,100 | 2,900 |
2017-02-07 | 5 | Ottawa | 43,890 | 2,000 | 2,800 |
2017-02-07 | 6 | Ottawa | 43,890 | 2,200 | 2,400 |
2017-02-07 | 7 | Ottawa | 43,890 | 2,800 | 3,500 |
2017-02-07 | 8 | Ottawa | 43,890 | 2,800 | 3,200 |
2017-02-07 | 9 | Ottawa | 43,890 | 2,400 | 2,600 |
2017-02-07 | 10 | Ottawa | 43,890 | 2,500 | 3,400 |
2017-02-07 | 11 | Ottawa | 43,890 | 2,200 | 3,100 |
2017-02-07 | 12 | Ottawa | 43,890 | 2,000 | 2,200 |
2017-02-07 | 13 | Ottawa | 43,890 | 2,000 | 2,400 |
2017-02-07 | 14 | Ottawa | 43,890 | 2,100 | 2,500 |
2017-02-07 | 15 | Ottawa | 43,890 | 2,000 | 2,600 |
2017-02-07 | 16 | Ottawa | 43,890 | 3,000 | 2,200 |
2017-02-07 | 17 | Ottawa | 43,890 | 2,500 | 2,800 |
2017-02-07 | 18 | Ottawa | 43,890 | 2,800 | 3,000 |
2017-02-07 | 19 | Ottawa | 43,890 | 2,500 | 2,800 |
2017-02-07 | 20 | Ottawa | 43,890 | 2,600 | 3,000 |
2017-02-07 | 21 | Ottawa | 43,890 | 2,800 | 3,400 |
For data sources see[5]
Period | Operator Name | Gas Quantity (mcf) | Gas Production Days | Oil Quantity (bbl) | Oil Production Days | Water Quantity (bbl) | Water Production Days |
---|---|---|---|---|---|---|---|
2016 | CAMERON ENERGY CO | 0.00 | 0 | 0.00 | 0 | 0.00 | 0 |
2017 | CAMERON ENERGY CO | 146.65 | 365 | 86.66 | 365 | 0.00 | 0 |
2018 | CAMERON ENERGY CO | 434.56 | 365 | 77.34 | 365 | 0.00 | 0 |
For data sources see[6]
Period | Operator | Waste Type | Quantity | Disposal Method | Waste Facility ID |
---|---|---|---|---|---|
2017 | CAMERON ENERGY CO | Unused Fracturing Fluid Waste | 7.69 Bbl | REUSE OTHER THAN ROAD SPREADING | |
2017 | CAMERON ENERGY CO | Produced Fluid | 6.73 Bbl | REUSE OTHER THAN ROAD SPREADING | |
2018 | CAMERON ENERGY CO | Unused Fracturing Fluid Waste | 7.27 Bbl | REUSE OTHER THAN ROAD SPREADING | |
2018 | CAMERON ENERGY CO | Produced Fluid | 5.87 Bbl | REUSE OTHER THAN ROAD SPREADING | |
2019 | CAMERON ENERGY CO | Produced Fluid | 18.88 Bbl | REUSE AT A CONVENTIONAL WELL SITE IN PA | |
2019 | CAMERON ENERGY CO | Unused Fracturing Fluid Waste | 3.50 Bbl | REUSE AT A CONVENTIONAL WELL SITE IN PA |
For data sources see[7]
Inspection ID | Inspection Category | Inspection Date | Inspection Type | Inspection Result | Inspection Comments |
---|---|---|---|---|---|
2507856 | Primary Facility | 2016-08-03 | Routine/Complete Inspection | No Violations Noted | Conventional oil well. The location has been built but the well has not been drilled.The disturbed areas were seeded and mulched and the well pad was stoned and stable. No violations noted at this time |
2540334 | Primary Facility | 2016-11-29 | Routine/Complete Inspection | No Violations Noted | Conventional oil well.The location and access road have been constructed but the well has not been drilled.The drill pit has been dug and a 20 mil liner is adjacent to it in preparation for drilling operations. The location and access road are vegetated and stable. No violations noted at this time. |
2551843 | Primary Facility | 2017-01-10 | Routine/Complete Inspection | No Violations Noted | |
2560950 | Primary Facility | 2017-02-13 | Administrative/File Review | No Violations Noted | |
2616229 | Primary Facility | 2017-07-18 | Administrative/File Review | No Violations Noted | |
2765200 | Primary Facility | 2018-08-20 | Site Restoration | No Violations Noted | This well is equipped for production with a pump jack that is currently operating. A site ID sign is posted on the jack. |
2824709 | Primary Facility | 2019-01-10 | Administrative/File Review | No Violations Noted |
For data sources see[8]