If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
| Well ID: 37-123-48044 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":41.639472,"lon":-79.068222,"icon":""}]} |
| Country: United States | |
| State: Pennsylvania | |
| County: Warren | |
| Municipality: Sheffield Township | |
| Operator Name: CAMERON ENERGY CO | |
| Well Pad ID: | |
| Farm/Lease Name: WARRANT 2877 | |
| License Status: Active | |
| Spud Date: 2017-08-04 | |
| Permit Date: 2017-01-04 | |
| Well Type: OIL | |
| Unconventional Well: N | |
| Configuration: Vertical Well | |
| Conservation: No | |
| Latitude: 41.639472 | |
| Longitude: -79.068222 |
| Date | Event |
|---|---|
| 2017-01-04 | New Permit Application |
| 2017-08-04 | Performed Spud Operation |
| 2017-08-18 | Drilling Completion |
| 2017-11-13 | Perforation |
| 2017-11-15 | Performed Stage 1 of Stimulation |
| 2017-11-15 | Performed Stage 10 of Stimulation |
| 2017-11-15 | Performed Stage 11 of Stimulation |
| 2017-11-15 | Performed Stage 12 of Stimulation |
| 2017-11-15 | Performed Stage 13 of Stimulation |
| 2017-11-15 | Performed Stage 14 of Stimulation |
| 2017-11-15 | Performed Stage 2 of Stimulation |
| 2017-11-15 | Performed Stage 3 of Stimulation |
| 2017-11-15 | Performed Stage 4 of Stimulation |
| 2017-11-15 | Performed Stage 5 of Stimulation |
| 2017-11-15 | Performed Stage 6 of Stimulation |
| 2017-11-15 | Performed Stage 7 of Stimulation |
| 2017-11-15 | Performed Stage 8 of Stimulation |
| 2017-11-15 | Performed Stage 9 of Stimulation |
| 2019-04-23 | Newly Drilled |
For data sources see[4]
| Stimulation Date | Phase Number | Chemical Agent | Volume (gal) | Treating Pressure (psi) | Breakdown Pressure (psi) |
|---|---|---|---|---|---|
| 2017-11-15 | 1 | Ottawa | 112,350 | 1,600 | 2,400 |
| 2017-11-15 | 2 | Ottawa | 112,350 | 1,900 | 2,000 |
| 2017-11-15 | 3 | Ottawa | 112,350 | 2,100 | 2,000 |
| 2017-11-15 | 4 | Ottawa | 112,350 | 2,300 | 2,500 |
| 2017-11-15 | 5 | Ottawa | 112,350 | 2,500 | 2,700 |
| 2017-11-15 | 6 | Ottawa | 112,350 | 2,200 | 3,500 |
| 2017-11-15 | 7 | Ottawa | 112,350 | 2,400 | 2,700 |
| 2017-11-15 | 8 | Ottawa | 112,350 | 2,300 | 0 |
| 2017-11-15 | 9 | Ottawa | 112,350 | 2,300 | 3,000 |
| 2017-11-15 | 10 | Ottawa | 112,350 | 2,400 | 3,300 |
| 2017-11-15 | 11 | Ottawa | 112,350 | 2,300 | 0 |
| 2017-11-15 | 12 | Ottawa | 112,350 | 2,500 | 3,500 |
| 2017-11-15 | 13 | Ottawa | 112,350 | 2,800 | 3,700 |
| 2017-11-15 | 14 | Ottawa | 112,350 | 2,700 | 2,600 |
For data sources see[5]
| Period | Operator Name | Gas Quantity (mcf) | Gas Production Days | Oil Quantity (bbl) | Oil Production Days | Water Quantity (bbl) | Water Production Days |
|---|---|---|---|---|---|---|---|
| 2017 | CAMERON ENERGY CO | 153.29 | 365 | 278.73 | 365 | 0.00 | 0 |
| 2018 | CAMERON ENERGY CO | 100.71 | 365 | 297.76 | 365 | 0.00 | 0 |
For data sources see[6]
| Period | Operator | Waste Type | Quantity | Disposal Method | Waste Facility ID |
|---|---|---|---|---|---|
| 2017 | CAMERON ENERGY CO | Unused Fracturing Fluid Waste | 111.76 Bbl | REUSE OTHER THAN ROAD SPREADING | |
| 2017 | CAMERON ENERGY CO | Produced Fluid | 35.29 Bbl | REUSE OTHER THAN ROAD SPREADING | |
| 2018 | CAMERON ENERGY CO | Unused Fracturing Fluid Waste | 17.65 Bbl | REUSE OTHER THAN ROAD SPREADING | |
| 2018 | CAMERON ENERGY CO | Produced Fluid | 35.94 Bbl | REUSE OTHER THAN ROAD SPREADING | |
| 2019 | CAMERON ENERGY CO | Produced Fluid | 29.09 Bbl | REUSE AT A CONVENTIONAL WELL SITE IN PA | |
| 2019 | CAMERON ENERGY CO | Unused Fracturing Fluid Waste | 10.91 Bbl | REUSE AT A CONVENTIONAL WELL SITE IN PA |
For data sources see[7]
| Inspection ID | Inspection Category | Inspection Date | Inspection Type | Inspection Result | Inspection Comments |
|---|---|---|---|---|---|
| 2625606 | Primary Facility | 2017-08-07 | Drilling/Alteration | No Violations Noted | |
| 2627594 | Primary Facility | 2017-08-18 | Routine/Complete Inspection | No Violations Noted | Drilling has begun on this well. The rig is setup on the well, there is no activity at this time. |
| 2632191 | Primary Facility | 2017-08-17 | Drilling/Alteration | No Violations Noted | Drilling activity has ceased for the day due to repairs needed on compressor. Total depth of wellbore is expected to be reached tomorrow. Drill cuttings are contained in a temporary drill pit. |
| 2644974 | Primary Facility | 2017-10-10 | Administrative/File Review | No Violations Noted | |
| 2662688 | Primary Facility | 2017-11-20 | Routine/Complete Inspection | No Violations Noted | This well has been recently completed and is equipped with a pump jack and site ID sign. |
| 2672557 | Primary Facility | 2017-12-19 | Administrative/File Review | No Violations Noted | Administrative review of well record/completion report. Report has been sent to file. |
| 2778695 | Primary Facility | 2018-09-20 | Site Restoration | No Violations Noted | This well is equipped for production with a pump jack, a site ID sign is also posted on the location. |
| 2824726 | Primary Facility | 2019-01-10 | Administrative/File Review | No Violations Noted |
For data sources see[8]