If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 37-123-48071 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":41.633222,"lon":-78.979111,"icon":""}]} |
Country: United States | |
State: Pennsylvania | |
County: Warren | |
Municipality: Sheffield Township | |
Operator Name: CAMERON ENERGY CO | |
Well Pad ID: | |
Farm/Lease Name: LOT 8 | |
License Status: Active | |
Spud Date: 2017-05-11 | |
Permit Date: 2017-04-17 | |
Well Type: OIL | |
Unconventional Well: N | |
Configuration: Vertical Well | |
Conservation: No | |
Latitude: 41.633222 | |
Longitude: -78.979111 |
Date | Event |
---|---|
2017-04-17 | New Permit Application |
2017-05-11 | Performed Spud Operation |
2017-05-18 | Drilling Completion |
2017-05-30 | Perforation |
2017-06-01 | Performed Stage 1 of Stimulation |
2017-06-01 | Performed Stage 10 of Stimulation |
2017-06-01 | Performed Stage 11 of Stimulation |
2017-06-01 | Performed Stage 12 of Stimulation |
2017-06-01 | Performed Stage 2 of Stimulation |
2017-06-01 | Performed Stage 3 of Stimulation |
2017-06-01 | Performed Stage 4 of Stimulation |
2017-06-01 | Performed Stage 5 of Stimulation |
2017-06-01 | Performed Stage 6 of Stimulation |
2017-06-01 | Performed Stage 7 of Stimulation |
2017-06-01 | Performed Stage 8 of Stimulation |
2017-06-01 | Performed Stage 9 of Stimulation |
2019-04-23 | Newly Drilled |
For data sources see[4]
Stimulation Date | Phase Number | Chemical Agent | Volume (gal) | Treating Pressure (psi) | Breakdown Pressure (psi) |
---|---|---|---|---|---|
2017-06-01 | 1 | Ottawa | 28,045 | 2,200 | 2,000 |
2017-06-01 | 2 | Ottawa | 28,045 | 2,500 | 2,100 |
2017-06-01 | 3 | Ottawa | 28,045 | 2,500 | 2,100 |
2017-06-01 | 4 | Ottawa | 28,045 | 2,900 | 3,800 |
2017-06-01 | 5 | Ottawa | 28,045 | 2,200 | 2,300 |
2017-06-01 | 6 | Ottawa | 28,045 | 2,900 | 2,400 |
2017-06-01 | 7 | Ottawa | 28,045 | 2,500 | 3,800 |
2017-06-01 | 8 | Ottawa | 28,045 | 2,400 | 2,400 |
2017-06-01 | 9 | Ottawa | 28,045 | 2,300 | 2,500 |
2017-06-01 | 10 | Ottawa | 28,045 | 2,200 | 3,000 |
2017-06-01 | 11 | Ottawa | 28,045 | 2,600 | 2,500 |
2017-06-01 | 12 | Ottawa | 28,045 | 2,900 | 3,100 |
For data sources see[5]
Period | Operator Name | Gas Quantity (mcf) | Gas Production Days | Oil Quantity (bbl) | Oil Production Days | Water Quantity (bbl) | Water Production Days |
---|---|---|---|---|---|---|---|
2017 | CAMERON ENERGY CO | 783.11 | 365 | 199.12 | 365 | 0.00 | 0 |
2018 | CAMERON ENERGY CO | 1,087.23 | 365 | 133.38 | 365 | 0.00 | 0 |
For data sources see[6]
Period | Operator | Waste Type | Quantity | Disposal Method | Waste Facility ID |
---|---|---|---|---|---|
2017 | CAMERON ENERGY CO | Unused Fracturing Fluid Waste | 19.57 Bbl | REUSE OTHER THAN ROAD SPREADING | |
2017 | CAMERON ENERGY CO | Produced Fluid | 8.70 Bbl | REUSE OTHER THAN ROAD SPREADING | |
2018 | CAMERON ENERGY CO | Unused Fracturing Fluid Waste | 4.65 Bbl | REUSE OTHER THAN ROAD SPREADING | |
2018 | CAMERON ENERGY CO | Produced Fluid | 5.33 Bbl | REUSE OTHER THAN ROAD SPREADING | |
2019 | CAMERON ENERGY CO | Produced Fluid | 5.33 Bbl | REUSE AT A CONVENTIONAL WELL SITE IN PA |
For data sources see[7]
Inspection ID | Inspection Category | Inspection Date | Inspection Type | Inspection Result | Inspection Comments |
---|---|---|---|---|---|
2593335 | Primary Facility | 2017-05-15 | Routine/Complete Inspection | No Violations Noted | Conventional oil well in the process of being drilled. The operator had drilled the surface hole and will probably install casing and cement tomorrow. Drill cuttings were being directed into an unlined pit. The location was vegetated and stable. No violations noted at this time |
2598397 | Primary Facility | 2017-05-08 | Drilling/Alteration | No Violations Noted | |
2600091 | Primary Facility | 2017-06-02 | Routine/Complete Inspection | No Violations Noted | Conventional oil well in the process of being fraced. The operator was on stage 6 of a 15 stage frac at the time of inspection. Fluids were contained in a lined pit. The location appeared stable. No violations noted |
2616198 | Primary Facility | 2017-07-18 | Administrative/File Review | No Violations Noted | |
2824735 | Primary Facility | 2019-01-10 | Administrative/File Review | No Violations Noted |
For data sources see[8]