If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 37-123-48085 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":41.629645,"lon":-79.005407,"icon":""}]} |
Country: United States | |
State: Pennsylvania | |
County: Warren | |
Municipality: Sheffield Township | |
Operator Name: CAMERON ENERGY CO | |
Well Pad ID: | |
Farm/Lease Name: DAVIS LOT 7 7 38 | |
License Status: Active | |
Spud Date: 2018-01-24 | |
Permit Date: 2017-06-08 | |
Well Type: OIL | |
Unconventional Well: N | |
Configuration: Vertical Well | |
Conservation: No | |
Latitude: 41.629645 | |
Longitude: -79.005407 |
Date | Event |
---|---|
2017-06-08 | New Permit Application |
2018-01-24 | Performed Spud Operation |
2018-02-15 | Drilling Completion |
2018-06-19 | Perforation |
2018-06-21 | Performed Stage 1 of Stimulation |
2018-06-21 | Performed Stage 10 of Stimulation |
2018-06-21 | Performed Stage 11 of Stimulation |
2018-06-21 | Performed Stage 12 of Stimulation |
2018-06-21 | Performed Stage 13 of Stimulation |
2018-06-21 | Performed Stage 14 of Stimulation |
2018-06-21 | Performed Stage 15 of Stimulation |
2018-06-21 | Performed Stage 16 of Stimulation |
2018-06-21 | Performed Stage 17 of Stimulation |
2018-06-21 | Performed Stage 2 of Stimulation |
2018-06-21 | Performed Stage 3 of Stimulation |
2018-06-21 | Performed Stage 4 of Stimulation |
2018-06-21 | Performed Stage 5 of Stimulation |
2018-06-21 | Performed Stage 6 of Stimulation |
2018-06-21 | Performed Stage 7 of Stimulation |
2018-06-21 | Performed Stage 8 of Stimulation |
2018-06-21 | Performed Stage 9 of Stimulation |
2019-04-25 | Newly Drilled |
For data sources see[4]
Stimulation Date | Phase Number | Chemical Agent | Volume (gal) | Treating Pressure (psi) | Breakdown Pressure (psi) |
---|---|---|---|---|---|
2018-06-21 | 1 | Ottawa | 33,883 | 1,600 | 2,600 |
2018-06-21 | 2 | Ottawa | 33,883 | 1,700 | 1,700 |
2018-06-21 | 3 | Ottawa | 33,883 | 1,900 | 2,000 |
2018-06-21 | 4 | Ottawa | 33,883 | 2,300 | 2,200 |
2018-06-21 | 5 | Ottawa | 33,883 | 2,300 | 3,100 |
2018-06-21 | 6 | Ottawa | 33,883 | 2,500 | 4,000 |
2018-06-21 | 7 | Ottawa | 33,883 | 2,300 | 2,300 |
2018-06-21 | 8 | Ottawa | 33,883 | 2,500 | 3,300 |
2018-06-21 | 9 | Ottawa | 33,883 | 2,000 | 3,000 |
2018-06-21 | 10 | Ottawa | 33,883 | 2,100 | 3,200 |
2018-06-21 | 11 | Ottawa | 33,883 | 2,600 | 2,100 |
2018-06-21 | 12 | Ottawa | 33,883 | 2,200 | 3,500 |
2018-06-21 | 13 | Ottawa | 33,883 | 2,100 | 2,700 |
2018-06-21 | 14 | Ottawa | 33,883 | 2,400 | 2,300 |
2018-06-21 | 15 | Ottawa | 33,883 | 2,500 | 2,300 |
2018-06-21 | 16 | Ottawa | 33,883 | 3,500 | 2,700 |
2018-06-21 | 17 | Ottawa | 33,883 | 3,000 | 2,900 |
For data sources see[5]
Period | Operator Name | Gas Quantity (mcf) | Gas Production Days | Oil Quantity (bbl) | Oil Production Days | Water Quantity (bbl) | Water Production Days |
---|---|---|---|---|---|---|---|
2018 | CAMERON ENERGY CO | 434.56 | 365 | 77.34 | 365 | 0.00 | 0 |
For data sources see[6]
Period | Operator | Waste Type | Quantity | Disposal Method | Waste Facility ID |
---|---|---|---|---|---|
2018 | CAMERON ENERGY CO | Unused Fracturing Fluid Waste | 7.27 Bbl | REUSE OTHER THAN ROAD SPREADING | |
2018 | CAMERON ENERGY CO | Produced Fluid | 5.87 Bbl | REUSE OTHER THAN ROAD SPREADING | |
2019 | CAMERON ENERGY CO | Produced Fluid | 18.88 Bbl | REUSE AT A CONVENTIONAL WELL SITE IN PA | |
2019 | CAMERON ENERGY CO | Unused Fracturing Fluid Waste | 3.50 Bbl | REUSE AT A CONVENTIONAL WELL SITE IN PA |
For data sources see[7]
Inspection ID | Inspection Category | Inspection Date | Inspection Type | Inspection Result | Inspection Comments |
---|---|---|---|---|---|
2678006 | Primary Facility | 2018-01-04 | Drilling/Alteration | No Violations Noted | No one on location at this time. Drilling rig and other equipment on site. Conductor pipe has been set. Temporary drill pit constructed for drill cuttings containment. |
2679444 | Primary Facility | 2018-01-04 | Routine/Complete Inspection | No Violations Noted | This well has been spud, there was no activity on location during this inspection. |
2681425 | Primary Facility | 2018-01-11 | Routine/Complete Inspection | No Violations Noted | The well and location appear to be in a similar state as to what they were during the previous inspection. There was no activity on the location at this time. |
2684693 | Primary Facility | 2018-01-22 | Drilling/Alteration | No Violations Noted | No one on location at this time. Drilling rig has been moved about 10' from original bore hole. Notification of the plug and skid was received on Thursday 01/18. Depth at the time of abandonment was 75'. It was stated that the conductor pipe had been damaged, and further drilling would not be possible. Drilling of new borehole has commenced. Abandoned borehole has not yet been filled with top-hole material. Operator advised that required documentation of a plug and skid is in process. |
2695347 | Primary Facility | 2018-02-16 | Routine/Complete Inspection | No Violations Noted | Drilling operations are nearing completion on this well, crews are currently in the process of tripping drill pipe. |
2698685 | Primary Facility | 2018-02-27 | Administrative/File Review | No Violations Noted | |
2718208 | Primary Facility | 2018-04-12 | Routine/Complete Inspection | No Violations Noted | This well has been drilled, the rig has been moved to the next location on this lease, |
2719027 | Primary Facility | 2018-04-17 | Administrative/File Review | No Violations Noted | |
2749403 | Primary Facility | 2018-06-26 | Routine/Complete Inspection | No Violations Noted | Recently completed well, equipped with a pump jack. This well is currently shut in. |
2753529 | Primary Facility | 2018-07-19 | Administrative/File Review | No Violations Noted | |
2812922 | Primary Facility | 2018-12-11 | Administrative/File Review | No Violations Noted |
For data sources see[8]