If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 37-123-48090 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":41.639972,"lon":-79.063722,"icon":""}]} |
Country: United States | |
State: Pennsylvania | |
County: Warren | |
Municipality: Sheffield Township | |
Operator Name: CAMERON ENERGY CO | |
Well Pad ID: | |
Farm/Lease Name: WARRANT 2877 | |
License Status: Active | |
Spud Date: 2017-09-19 | |
Permit Date: 2017-06-08 | |
Well Type: OIL | |
Unconventional Well: N | |
Configuration: Vertical Well | |
Conservation: No | |
Latitude: 41.639972 | |
Longitude: -79.063722 |
Date | Event |
---|---|
2017-06-08 | New Permit Application |
2017-09-19 | Performed Spud Operation |
2017-09-25 | Drilling Completion |
2017-10-09 | Perforation |
2017-10-11 | Performed Stage 1 of Stimulation |
2017-10-11 | Performed Stage 10 of Stimulation |
2017-10-11 | Performed Stage 11 of Stimulation |
2017-10-11 | Performed Stage 12 of Stimulation |
2017-10-11 | Performed Stage 13 of Stimulation |
2017-10-11 | Performed Stage 14 of Stimulation |
2017-10-11 | Performed Stage 2 of Stimulation |
2017-10-11 | Performed Stage 3 of Stimulation |
2017-10-11 | Performed Stage 4 of Stimulation |
2017-10-11 | Performed Stage 5 of Stimulation |
2017-10-11 | Performed Stage 6 of Stimulation |
2017-10-11 | Performed Stage 7 of Stimulation |
2017-10-11 | Performed Stage 8 of Stimulation |
2017-10-11 | Performed Stage 9 of Stimulation |
2019-04-25 | Newly Drilled |
For data sources see[4]
Stimulation Date | Phase Number | Chemical Agent | Volume (gal) | Treating Pressure (psi) | Breakdown Pressure (psi) |
---|---|---|---|---|---|
2017-10-11 | 1 | Ottawa | 121,128 | 1,700 | 2,300 |
2017-10-11 | 2 | Ottawa | 121,128 | 1,700 | 1,800 |
2017-10-11 | 3 | Ottawa | 121,128 | 1,800 | 2,000 |
2017-10-11 | 4 | Ottawa | 121,128 | 1,900 | 2,000 |
2017-10-11 | 5 | Ottawa | 121,128 | 1,900 | 3,500 |
2017-10-11 | 6 | Ottawa | 121,128 | 2,200 | 2,500 |
2017-10-11 | 7 | Ottawa | 121,128 | 2,200 | 2,500 |
2017-10-11 | 8 | Ottawa | 121,128 | 2,200 | 3,000 |
2017-10-11 | 9 | Ottawa | 121,128 | 2,200 | 3,300 |
2017-10-11 | 10 | Ottawa | 121,128 | 2,700 | 3,300 |
2017-10-11 | 11 | Ottawa | 121,128 | 2,500 | 3,800 |
2017-10-11 | 12 | Ottawa | 121,128 | 2,500 | 2,800 |
2017-10-11 | 13 | Ottawa | 121,128 | 2,900 | 3,800 |
2017-10-11 | 14 | Ottawa | 121,128 | 2,500 | 3,100 |
For data sources see[5]
Period | Operator Name | Gas Quantity (mcf) | Gas Production Days | Oil Quantity (bbl) | Oil Production Days | Water Quantity (bbl) | Water Production Days |
---|---|---|---|---|---|---|---|
2017 | CAMERON ENERGY CO | 153.29 | 365 | 278.73 | 365 | 0.00 | 0 |
2018 | CAMERON ENERGY CO | 100.71 | 365 | 297.76 | 365 | 0.00 | 0 |
For data sources see[6]
Period | Operator | Waste Type | Quantity | Disposal Method | Waste Facility ID |
---|---|---|---|---|---|
2017 | CAMERON ENERGY CO | Unused Fracturing Fluid Waste | 111.76 Bbl | REUSE OTHER THAN ROAD SPREADING | |
2017 | CAMERON ENERGY CO | Produced Fluid | 35.29 Bbl | REUSE OTHER THAN ROAD SPREADING | |
2018 | CAMERON ENERGY CO | Unused Fracturing Fluid Waste | 17.65 Bbl | REUSE OTHER THAN ROAD SPREADING | |
2018 | CAMERON ENERGY CO | Produced Fluid | 35.94 Bbl | REUSE OTHER THAN ROAD SPREADING | |
2019 | CAMERON ENERGY CO | Produced Fluid | 29.09 Bbl | REUSE AT A CONVENTIONAL WELL SITE IN PA | |
2019 | CAMERON ENERGY CO | Unused Fracturing Fluid Waste | 10.91 Bbl | REUSE AT A CONVENTIONAL WELL SITE IN PA |
For data sources see[7]
Inspection ID | Inspection Category | Inspection Date | Inspection Type | Inspection Result | Inspection Comments |
---|---|---|---|---|---|
2638712 | Primary Facility | 2017-09-22 | Drilling/Alteration | No Violations Noted | Drilling bottom-hole section of wellbore at this time. Total depth of well bore is anticipated at 2075'. Cement return to surface was obtained as indicated on surface casing cement job log. Open-ended casing, no shoe was used. Centralizers are spaced correctly as indicated on drillers log. |
2642877 | Primary Facility | 2017-10-02 | Routine/Complete Inspection | No Violations Noted | This well has been recently drilled. There is currently no activity on this location. |
2647065 | Primary Facility | 2017-10-11 | Routine/Complete Inspection | No Violations Noted | This well is currently in the process of being completed. |
2651266 | Primary Facility | 2017-10-18 | Routine/Complete Inspection | No Violations Noted | This well has bern recently completed and is equipped with a pump jack. |
2662346 | Primary Facility | 2017-11-20 | Administrative/File Review | No Violations Noted | |
2778744 | Primary Facility | 2018-09-20 | Site Restoration | No Violations Noted | This well is equipped for production with a pump jack, a site ID sign is also posted on the location. |
2824732 | Primary Facility | 2019-01-10 | Administrative/File Review | No Violations Noted |
For data sources see[8]