If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 37-123-48139 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":41.638528,"lon":-78.967222,"icon":""}]} |
Country: United States | |
State: Pennsylvania | |
County: Warren | |
Municipality: Sheffield Township | |
Operator Name: CAMERON ENERGY CO | |
Well Pad ID: | |
Farm/Lease Name: LOT 8 8 100 | |
License Status: Active | |
Spud Date: 2018-10-17 | |
Permit Date: 2018-03-06 | |
Well Type: OIL | |
Unconventional Well: N | |
Configuration: Vertical Well | |
Conservation: No | |
Latitude: 41.638528 | |
Longitude: -78.967222 |
Date | Event |
---|---|
2018-03-06 | New Permit Application |
2018-10-16 | Performed Spud Operation |
2018-10-24 | Drilling Completion |
2018-11-21 | Perforation |
2018-11-29 | Performed Stage 1 of Stimulation |
2018-11-29 | Performed Stage 10 of Stimulation |
2018-11-29 | Performed Stage 11 of Stimulation |
2018-11-29 | Performed Stage 12 of Stimulation |
2018-11-29 | Performed Stage 13 of Stimulation |
2018-11-29 | Performed Stage 2 of Stimulation |
2018-11-29 | Performed Stage 3 of Stimulation |
2018-11-29 | Performed Stage 4 of Stimulation |
2018-11-29 | Performed Stage 5 of Stimulation |
2018-11-29 | Performed Stage 6 of Stimulation |
2018-11-29 | Performed Stage 7 of Stimulation |
2018-11-29 | Performed Stage 8 of Stimulation |
2018-11-29 | Performed Stage 9 of Stimulation |
2019-03-19 | Newly Drilled |
For data sources see[4]
Stimulation Date | Phase Number | Chemical Agent | Volume (gal) | Treating Pressure (psi) | Breakdown Pressure (psi) |
---|---|---|---|---|---|
2018-11-29 | 1 | Ottawa | 25,830 | 2,000 | 2,100 |
2018-11-29 | 2 | Ottawa | 25,830 | 2,000 | 2,200 |
2018-11-29 | 3 | Ottawa | 25,830 | 2,000 | 3,000 |
2018-11-29 | 4 | Ottawa | 25,830 | 2,200 | 2,600 |
2018-11-29 | 5 | Ottawa | 25,830 | 2,900 | 4,000 |
2018-11-29 | 6 | Ottawa | 25,830 | 2,600 | 4,200 |
2018-11-29 | 7 | Ottawa | 25,830 | 2,600 | 3,200 |
2018-11-29 | 8 | Ottawa | 25,830 | 2,600 | 3,500 |
2018-11-29 | 9 | Ottawa | 25,830 | 1,900 | 2,500 |
2018-11-29 | 10 | Ottawa | 25,830 | 2,100 | 2,200 |
2018-11-29 | 11 | Ottawa | 25,830 | 2,200 | 2,000 |
2018-11-29 | 12 | Ottawa | 25,830 | 3,100 | 2,400 |
2018-11-29 | 13 | Ottawa | 25,830 | 2,600 | 3,100 |
For data sources see[5]
Period | Operator Name | Gas Quantity (mcf) | Gas Production Days | Oil Quantity (bbl) | Oil Production Days | Water Quantity (bbl) | Water Production Days |
---|---|---|---|---|---|---|---|
2018 | CAMERON ENERGY CO | 156.67 | 365 | 162.64 | 365 | 0.00 | 0 |
For data sources see[6]
Period | Operator | Waste Type | Quantity | Disposal Method | Waste Facility ID |
---|---|---|---|---|---|
2018 | CAMERON ENERGY CO | Produced Fluid | 26.00 Bbl | REUSE OTHER THAN ROAD SPREADING | |
2019 | CAMERON ENERGY CO | Produced Fluid | 11.00 Bbl | REUSE AT A CONVENTIONAL WELL SITE IN PA |
For data sources see[7]
Inspection ID | Inspection Category | Inspection Date | Inspection Type | Inspection Result | Inspection Comments |
---|---|---|---|---|---|
2734493 | Primary Facility | 2018-05-22 | Routine/Complete Inspection | No Violations Noted | This permitted well site has been constructed and the drilling permit is posted on the location. |
2790743 | Primary Facility | 2018-10-18 | Drilling/Alteration | No Violations Noted | Welding drive pipe at this time. Additional drive pipe was needed due to large crevices encountered on surface bore. Surface casing will be run and cemented tomorrow. Temporary drill pit for containment of drill cuttings. |
2798449 | Primary Facility | 2018-10-29 | Routine/Complete Inspection | No Violations Noted | Recently drilled well. There is no activity on the location at this time. |
2811239 | Primary Facility | 2018-12-06 | Routine/Complete Inspection | No Violations Noted | Recently completed well that is currently shut in. The well is equipped with a pump jack and plumbed into gathering lines. |
2812937 | Primary Facility | 2018-12-11 | Administrative/File Review | No Violations Noted | |
2824884 | Primary Facility | 2019-01-10 | Administrative/File Review | No Violations Noted |
For data sources see[8]