If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 37-123-48141 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":41.639611,"lon":-78.984028,"icon":""}]} |
Country: United States | |
State: Pennsylvania | |
County: Warren | |
Municipality: Sheffield Township | |
Operator Name: CAMERON ENERGY CO | |
Well Pad ID: | |
Farm/Lease Name: LOT 8 8 104 | |
License Status: Active | |
Spud Date: 2018-09-25 | |
Permit Date: 2018-03-06 | |
Well Type: OIL | |
Unconventional Well: N | |
Configuration: Vertical Well | |
Conservation: No | |
Latitude: 41.639611 | |
Longitude: -78.984028 |
Date | Event |
---|---|
2016-11-08 | Perforation |
2018-03-06 | New Permit Application |
2018-09-25 | Performed Spud Operation |
2018-10-02 | Drilling Completion |
2018-11-08 | Perforation |
2018-11-15 | Performed Stage 1 of Stimulation |
2018-11-15 | Performed Stage 10 of Stimulation |
2018-11-15 | Performed Stage 2 of Stimulation |
2018-11-15 | Performed Stage 3 of Stimulation |
2018-11-15 | Performed Stage 4 of Stimulation |
2018-11-15 | Performed Stage 5 of Stimulation |
2018-11-15 | Performed Stage 6 of Stimulation |
2018-11-15 | Performed Stage 7 of Stimulation |
2018-11-15 | Performed Stage 8 of Stimulation |
2018-11-15 | Performed Stage 9 of Stimulation |
2018-11-16 | Performed Stage 11 of Stimulation |
2018-11-16 | Performed Stage 12 of Stimulation |
2018-11-16 | Performed Stage 13 of Stimulation |
2018-11-16 | Performed Stage 14 of Stimulation |
2018-11-16 | Performed Stage 15 of Stimulation |
2018-11-16 | Performed Stage 16 of Stimulation |
2019-03-19 | Newly Drilled |
For data sources see[4]
Stimulation Date | Phase Number | Chemical Agent | Volume (gal) | Treating Pressure (psi) | Breakdown Pressure (psi) |
---|---|---|---|---|---|
2018-11-15 | 1 | Ottawa | 36,403 | 1,700 | 2,100 |
2018-11-15 | 2 | Ottawa | 36,403 | 1,700 | 2,600 |
2018-11-15 | 3 | Ottawa | 36,403 | 1,800 | 3,100 |
2018-11-15 | 4 | Ottawa | 36,403 | 2,200 | 2,200 |
2018-11-15 | 5 | Ottawa | 36,403 | 2,300 | 4,000 |
2018-11-15 | 6 | Ottawa | 36,403 | 2,100 | 2,900 |
2018-11-15 | 7 | Ottawa | 36,403 | 2,400 | 3,500 |
2018-11-15 | 8 | Ottawa | 36,403 | 2,700 | 2,500 |
2018-11-15 | 9 | Ottawa | 36,403 | 3,000 | 3,500 |
2018-11-15 | 10 | Ottawa | 36,403 | 2,000 | 3,700 |
2018-11-16 | 11 | Ottawa | 36,403 | 2,100 | 4,100 |
2018-11-16 | 12 | Ottawa | 36,403 | 2,300 | 4,000 |
2018-11-16 | 13 | Ottawa | 36,403 | 2,200 | 3,500 |
2018-11-16 | 14 | Ottawa | 36,403 | 2,500 | 3,000 |
2018-11-16 | 15 | Ottawa | 36,403 | 2,500 | 4,000 |
2018-11-16 | 16 | Ottawa | 36,403 | 2,500 | 3,600 |
For data sources see[5]
Period | Operator Name | Gas Quantity (mcf) | Gas Production Days | Oil Quantity (bbl) | Oil Production Days | Water Quantity (bbl) | Water Production Days |
---|---|---|---|---|---|---|---|
2018 | CAMERON ENERGY CO | 156.67 | 365 | 162.64 | 365 | 0.00 | 0 |
For data sources see[6]
Period | Operator | Waste Type | Quantity | Disposal Method | Waste Facility ID |
---|---|---|---|---|---|
2018 | CAMERON ENERGY CO | Produced Fluid | 26.00 Bbl | REUSE OTHER THAN ROAD SPREADING | |
2019 | CAMERON ENERGY CO | Produced Fluid | 11.00 Bbl | REUSE AT A CONVENTIONAL WELL SITE IN PA |
For data sources see[7]
Inspection ID | Inspection Category | Inspection Date | Inspection Type | Inspection Result | Inspection Comments |
---|---|---|---|---|---|
2749353 | Primary Facility | 2018-07-02 | Routine/Complete Inspection | No Violations Noted | This inspection was conducted in response to my concern over the concentration of spring flows into the Forest Road 446 ditch in the vicinity of this constructed well site. Representatives from Cameron Energy and the Allegheny National Forest (surface owner) were present during this inspection. |
2780491 | Primary Facility | 2018-09-25 | Drilling/Alteration | No Violations Noted | Setting drive pipe at this time. Surface casing will be run and cemented on Thursday, 09/27. There may be crevices encountered while drilling the surface hole which will require a cement squeeze job. This may push the surface casing cement job back to a later date. Temporary drill pit constructed for containment of drill cuttings. |
2786740 | Primary Facility | 2018-10-10 | Routine/Complete Inspection | No Violations Noted | Drilled well that is shut in. There is no activity on location at this time. |
2803292 | Primary Facility | 2018-11-15 | Administrative/File Review | No Violations Noted | |
2804679 | Primary Facility | 2018-11-19 | Routine/Complete Inspection | No Violations Noted | Recently completed well that has been equipped with rods and tubing. The well is currently shut in. |
2824886 | Primary Facility | 2019-01-10 | Administrative/File Review | No Violations Noted |
For data sources see[8]