If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
| Well ID: 37-123-48191 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":41.631639,"lon":-79.004556,"icon":""}]} |
| Country: United States | |
| State: Pennsylvania | |
| County: Warren | |
| Municipality: Sheffield Township | |
| Operator Name: CAMERON ENERGY CO | |
| Well Pad ID: | |
| Farm/Lease Name: DAVIS LOT 7 | |
| License Status: Active | |
| Spud Date: 2018-12-11 | |
| Permit Date: 2018-07-06 | |
| Well Type: OIL | |
| Unconventional Well: N | |
| Configuration: Vertical Well | |
| Conservation: No | |
| Latitude: 41.631639 | |
| Longitude: -79.004556 |
| Date | Event |
|---|---|
| 2018-07-06 | New Permit Application |
| 2018-12-11 | Performed Spud Operation |
| 2018-12-20 | Drilling Completion |
| 2019-01-11 | Perforation |
| 2019-01-16 | Performed Stage 1 of Stimulation |
| 2019-01-16 | Performed Stage 10 of Stimulation |
| 2019-01-16 | Performed Stage 11 of Stimulation |
| 2019-01-16 | Performed Stage 12 of Stimulation |
| 2019-01-16 | Performed Stage 13 of Stimulation |
| 2019-01-16 | Performed Stage 14 of Stimulation |
| 2019-01-16 | Performed Stage 15 of Stimulation |
| 2019-01-16 | Performed Stage 2 of Stimulation |
| 2019-01-16 | Performed Stage 3 of Stimulation |
| 2019-01-16 | Performed Stage 4 of Stimulation |
| 2019-01-16 | Performed Stage 5 of Stimulation |
| 2019-01-16 | Performed Stage 6 of Stimulation |
| 2019-01-16 | Performed Stage 7 of Stimulation |
| 2019-01-16 | Performed Stage 8 of Stimulation |
| 2019-01-16 | Performed Stage 9 of Stimulation |
| 2019-05-28 | Newly Drilled |
For data sources see[4]
| Stimulation Date | Phase Number | Chemical Agent | Volume (gal) | Treating Pressure (psi) | Breakdown Pressure (psi) |
|---|---|---|---|---|---|
| 2019-01-16 | 1 | Ottawa | 32,928 | 1,500 | 2,500 |
| 2019-01-16 | 2 | Ottawa | 32,928 | 1,800 | 2,400 |
| 2019-01-16 | 3 | Ottawa | 32,928 | 2,200 | 2,500 |
| 2019-01-16 | 4 | Ottawa | 32,928 | 2,100 | 4,000 |
| 2019-01-16 | 5 | Ottawa | 32,928 | 2,000 | 3,700 |
| 2019-01-16 | 6 | Ottawa | 32,928 | 2,700 | 3,400 |
| 2019-01-16 | 7 | Ottawa | 32,928 | 3,300 | 3,800 |
| 2019-01-16 | 8 | Ottawa | 32,928 | 1,900 | 2,600 |
| 2019-01-16 | 9 | Ottawa | 32,928 | 1,800 | 2,500 |
| 2019-01-16 | 10 | Ottawa | 32,928 | 2,000 | 2,500 |
| 2019-01-16 | 11 | Ottawa | 32,928 | 2,100 | 2,500 |
| 2019-01-16 | 12 | Ottawa | 32,928 | 2,400 | 2,500 |
| 2019-01-16 | 13 | Ottawa | 32,928 | 2,800 | 2,600 |
| 2019-01-16 | 14 | Ottawa | 32,928 | 2,900 | 2,700 |
| 2019-01-16 | 15 | Ottawa | 32,928 | 3,300 | 3,000 |
For data sources see[5]
| Period | Operator Name | Gas Quantity (mcf) | Gas Production Days | Oil Quantity (bbl) | Oil Production Days | Water Quantity (bbl) | Water Production Days |
|---|---|---|---|---|---|---|---|
| 2018 | CAMERON ENERGY CO | 0.00 | 0 | 0.00 | 0 | 0.00 | 0 |
For data sources see[6]
| Period | Operator | Waste Type | Quantity | Disposal Method | Waste Facility ID |
|---|---|---|---|---|---|
| 2019 | CAMERON ENERGY CO | Unused Fracturing Fluid Waste | 3.50 Bbl | REUSE AT A CONVENTIONAL WELL SITE IN PA | |
| 2019 | CAMERON ENERGY CO | Produced Fluid | 18.88 Bbl | REUSE AT A CONVENTIONAL WELL SITE IN PA |
For data sources see[7]
| Inspection ID | Inspection Category | Inspection Date | Inspection Type | Inspection Result | Inspection Comments |
|---|---|---|---|---|---|
| 2815622 | Primary Facility | 2018-12-14 | Drilling/Alteration | No Violations Noted | Preparing to cement surface casing at this time. Total depth of well bore is anticipated at 2125'. Drill cuttings are contained in a temporary drill pit. |
| 2818872 | Primary Facility | 2018-12-24 | Routine/Complete Inspection | No Violations Noted | Recently drilled well that is currently shut in. There is no activity on the lease at this time. |
| 2833059 | Primary Facility | 2019-01-29 | Routine/Complete Inspection | No Violations Noted | Recently completed well that is equipped with rods and tubing. The well is currently shut in. |
For data sources see[8]