If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 37-125-01135 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":40.145861,"lon":-80.394917,"icon":""}]} |
Country: United States | |
State: Pennsylvania | |
County: Washington | |
Municipality: Blaine Township | |
Operator Name: DALLAS ENERGY LLC | |
Well Pad ID: | |
Farm/Lease Name: CARSON L 7 | |
License Status: Plugged and Abandoned | |
Spud Date: | |
Permit Date: | |
Well Type: OIL | |
Unconventional Well: N | |
Configuration: Vertical Well | |
Conservation: No | |
Latitude: 40.145861 | |
Longitude: -80.394917 |
Date | Event |
---|---|
1891-07-01 | Drilling Completion |
1998-07-23 | Old Well |
2017-09-25 | Begin Plugging |
2017-10-03 | Finished Plugging |
For data sources see[4]
Period | Operator Name | Gas Quantity (mcf) | Gas Production Days | Oil Quantity (bbl) | Oil Production Days | Water Quantity (bbl) | Water Production Days |
---|---|---|---|---|---|---|---|
1993 | PENNZOIL PROD CO | 0.00 | 0 | 0.00 | 0 | 0.00 | 0 |
1996 | PENNZOIL PROD CO | 0.00 | 0 | 0.00 | 0 | 0.00 | 0 |
1997 | PENNZOIL PROD CO | 0.00 | 0 | 0.00 | 0 | 0.00 | 0 |
1998 | PENNZOIL PROD CO | 0.00 | 0 | 0.00 | 0 | 0.00 | 0 |
1999 | PENNZOIL PROD CO | 0.00 | 0 | 0.00 | 0 | 0.00 | 0 |
2000 | PENNZOIL PROD CO | 0.00 | 0 | 0.00 | 0 | 0.00 | 0 |
2001 | EAST RESOURCES INC | 0.00 | 0 | 0.00 | 0 | 0.00 | 0 |
2002 | EAST RESOURCES INC | 0.00 | 0 | 0.00 | 0 | 0.00 | 0 |
2003 | EAST RESOURCES INC | 0.00 | 0 | 0.00 | 0 | 0.00 | 0 |
2005 | EAST RESOURCES INC | 0.00 | 0 | 0.00 | 0 | 0.00 | 0 |
2006 | EAST RESOURCES INC | 0.00 | 0 | 0.00 | 0 | 0.00 | 0 |
2007 | EAST RESOURCES INC | 0.00 | 0 | 0.00 | 0 | 0.00 | 0 |
2008 | EAST RESOURCES INC | 0.00 | 0 | 0.00 | 0 | 0.00 | 0 |
2010 | EAST RESOURCES MGMT LLC | 0.00 | 0 | 0.00 | 0 | 0.00 | 0 |
2011 | SWEPI LP | 0.00 | 0 | 0.00 | 0 | 0.00 | 0 |
2012 | SWEPI LP | 0.00 | 0 | 0.00 | 0 | 0.00 | 0 |
2013 | SWEPI LP | 0.00 | 0 | 0.00 | 0 | 0.00 | 0 |
2014 | SWEPI LP | 0.00 | 0 | 0.00 | 0 | 0.00 | 0 |
2015 | SWEPI LP | 0.00 | 0 | 0.00 | 0 | 0.00 | 0 |
2016 | SWEPI LP | 0.00 | 0 | 0.00 | 0 | 0.00 | 0 |
2017 | SWEPI LP | 0.00 | 0 | 0.00 | 0 | 0.00 | 0 |
For data sources see[5]
Inspection ID | Inspection Category | Inspection Date | Inspection Type | Inspection Result | Inspection Comments |
---|---|---|---|---|---|
2541868 | Primary Facility | 2016-10-20 | Plugging(Includes Plugged/Mined Through) | No Violations Noted | |
2655027 | Primary Facility | 2017-09-26 | Plugging(Includes Plugged/Mined Through) | In Compliance with Policy | ConServ pulled rods and tubing. TIH and set down at 2491' (top of Gordon 2523'). |
2655066 | Primary Facility | 2017-10-02 | Plugging(Includes Plugged/Mined Through) | In Compliance with Policy | (ConServ had pulled 4" up to 499' before stopping. Perfed 5 5/8" casing from 1400'-600', 5 shots/100'. Pumped 4th plug, TIH with wireline & tagged solid cement at 1167', not knowing unset cement extended farther uphole. TIH with cement string to 967' and shut down.) Next day (today) they tried to move cement string, but it was cemented in. Tripped into tubing with wireline, found cement at 847'. Waiting on small shots to trip into tubing and part tubing above cement. |
2655092 | Primary Facility | 2017-10-03 | Plugging(Includes Plugged/Mined Through) | In Compliance with Policy | ConServ TIH and tagged top of parted tubing at 801'. Getting ready to pump plug. (Yesterday they cut tubing at 802' and pulled OOH. Shot 4" casing collar @496' and tried to pull with no results, repeated with no results. Shot 4" collar @474', pulled free, pulled casing.) |
2655104 | Primary Facility | 2017-10-04 | Plugging(Includes Plugged/Mined Through) | In Compliance with Policy | ConServ has well plugged to surface and all equipment mobilized to L. Carson 9. |
For data sources see[6]