If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 37-125-01576 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":40.148972,"lon":-80.397917,"icon":""}]} |
Country: United States | |
State: Pennsylvania | |
County: Washington | |
Municipality: Blaine Township | |
Operator Name: DALLAS ENERGY LLC | |
Well Pad ID: | |
Farm/Lease Name: L. CARSON | |
License Status: Plugged and Abandoned | |
Spud Date: | |
Permit Date: | |
Well Type: UNDETERMINED | |
Unconventional Well: N | |
Configuration: Vertical Well | |
Conservation: No | |
Latitude: 40.148972 | |
Longitude: -80.397917 |
Date | Event |
---|---|
1890-04-08 | Drilling Completion |
1987-04-17 | Old Well |
2017-07-18 | Begin Plugging |
2017-08-01 | Finished Plugging |
2019-05-03 | Fully Plugged |
For data sources see[4]
Period | Operator Name | Gas Quantity (mcf) | Gas Production Days | Oil Quantity (bbl) | Oil Production Days | Water Quantity (bbl) | Water Production Days |
---|---|---|---|---|---|---|---|
1993 | PENNZOIL PROD CO | 0.00 | 0 | 0.00 | 0 | 0.00 | 0 |
1996 | PENNZOIL PROD CO | 0.00 | 0 | 0.00 | 0 | 0.00 | 0 |
1997 | PENNZOIL PROD CO | 0.00 | 0 | 0.00 | 0 | 0.00 | 0 |
1998 | PENNZOIL PROD CO | 0.00 | 0 | 0.00 | 0 | 0.00 | 0 |
1999 | PENNZOIL PROD CO | 0.00 | 0 | 0.00 | 0 | 0.00 | 0 |
2000 | PENNZOIL PROD CO | 0.00 | 0 | 0.00 | 0 | 0.00 | 0 |
2001 | EAST RESOURCES INC | 0.00 | 0 | 0.00 | 0 | 0.00 | 0 |
2002 | EAST RESOURCES INC | 0.00 | 0 | 0.00 | 0 | 0.00 | 0 |
2003 | EAST RESOURCES INC | 0.00 | 0 | 0.00 | 0 | 0.00 | 0 |
2005 | EAST RESOURCES INC | 0.00 | 0 | 0.00 | 0 | 0.00 | 0 |
2006 | EAST RESOURCES INC | 0.00 | 0 | 0.00 | 0 | 0.00 | 0 |
2007 | EAST RESOURCES INC | 0.00 | 0 | 0.00 | 0 | 0.00 | 0 |
2008 | EAST RESOURCES INC | 0.00 | 0 | 0.00 | 0 | 0.00 | 0 |
2010 | EAST RESOURCES MGMT LLC | 0.00 | 0 | 0.00 | 0 | 0.00 | 0 |
2011 | SWEPI LP | 0.00 | 0 | 0.00 | 0 | 0.00 | 0 |
2012 | SWEPI LP | 0.00 | 0 | 0.00 | 0 | 0.00 | 0 |
2013 | SWEPI LP | 0.00 | 0 | 0.00 | 0 | 0.00 | 0 |
2014 | SWEPI LP | 0.00 | 0 | 0.00 | 0 | 0.00 | 0 |
2015 | SWEPI LP | 0.00 | 0 | 0.00 | 0 | 0.00 | 0 |
2016 | SWEPI LP | 0.00 | 0 | 0.00 | 0 | 0.00 | 0 |
2017 | SWEPI LP | 0.00 | 0 | 0.00 | 0 | 0.00 | 0 |
For data sources see[5]
Inspection ID | Inspection Category | Inspection Date | Inspection Type | Inspection Result | Inspection Comments |
---|---|---|---|---|---|
2614894 | Primary Facility | 2017-06-13 | Plugging(Includes Plugged/Mined Through) | In Compliance with Schedule | Visited site before ConServ moved rig on well. Well is along road to other wells, so well will be plugged after the other wells are plugged. |
2614896 | Primary Facility | 2017-07-12 | Plugging(Includes Plugged/Mined Through) | In Compliance with Schedule | ConServ rig is finished plugging on Nobel 13, but move has been delayed due to recent heavy rains. |
2616085 | Primary Facility | 2017-07-17 | Plugging(Includes Plugged/Mined Through) | In Compliance with Schedule | ConServ is rigged up and ready to begin plugging operations. |
2617538 | Primary Facility | 2017-07-19 | Plugging(Includes Plugged/Mined Through) | In Compliance with Policy | ConServ tagged TD @ 2573' (Drillers record: 2581'). Tripping in hole w/ cement string at time of inspection. |
2618703 | Primary Facility | 2017-07-24 | Plugging(Includes Plugged/Mined Through) | In Compliance with Policy | ConServ pulled on 4 1/4" casing to try to unseat packer. Unable to unseat after repeated tries, so cut first collar above packer @ ~1400'. Casing pulled free, so prepared to pull casing. |
2621292 | Primary Facility | 2017-07-27 | Plugging(Includes Plugged/Mined Through) | In Compliance with Policy | No activity @ time of inspection. ConServ perforated 5 5/8" casing yesterday. They will run cement string later today. |
2621299 | Primary Facility | 2017-07-31 | Plugging(Includes Plugged/Mined Through) | In Compliance with Policy | ConServ tagged TOC plug that was pumped yesterday @ 708', will spot next plug this afternoon. |
2621303 | Primary Facility | 2017-08-01 | Plugging(Includes Plugged/Mined Through) | In Compliance with Policy | ConServ tagged TOC plug @ 150', will top off. |
2624369 | Primary Facility | 2017-08-04 | Plugging(Includes Plugged/Mined Through) | In Compliance with Policy | ConServ plugged well to 5' below surface, SD. Rig is still on well, along w/ tanks, doghouse, etc. |
2624379 | Primary Facility | 2017-08-08 | Plugging(Includes Plugged/Mined Through) | In Compliance with Policy | ConServ has some of equipment moved to Carson 5. Rig, doghouse & water tank still on site. |
2624382 | Primary Facility | 2017-08-09 | Plugging(Includes Plugged/Mined Through) | In Compliance with Policy | Rig has been move off location, water tank & doghouse remain. |
For data sources see[6]