37-125-22119

Well Details

Well ID: 37-125-22119
Loading map...
Country: United States
State: Pennsylvania
County: Washington
Municipality: West Finley Township
Operator Name: ROBIN ENERGY INC
Well Pad ID:
Farm/Lease Name: BLUM
License Status: Plugged and Abandoned
Spud Date: 2004-01-19
Permit Date: 2003-12-09
Well Type: COALBED METHANE
Unconventional Well: N
Configuration: Vertical Well
Conservation: No
Latitude: 40.024312
Longitude: -80.516558

For data sources see[1][2][3]

Well History

Date Event
2003-12-09 New Permit Application
2004-01-06 Performed Spud Operation
2004-01-21 Drilling Completion
2005-05-03 NEWLY DRILLED
2019-12-11 Begin Plugging
2019-12-12 Finished Plugging
2020-02-13 Fully Plugged

For data sources see[4]


Production Data

Period Operator Name Gas Quantity (mcf) Gas Production Days Oil Quantity (bbl) Oil Production Days Water Quantity (bbl) Water Production Days
2004 JESMAR ENERGY INC 0.00 0 0.00 0 0.00 0
2005 JESMAR ENERGY INC 108735 275 0.00 0 0.00 0
2006 JESMAR ENERGY INC 205600.00 365 0.00 0 0.00 0
2007 JESMAR ENERGY INC 167228.00 315 0.00 0 0.00 0
2008 JESMAR ENERGY INC 135096.00 365 0.00 0 0.00 0
2009 JESMAR ENERGY INC 113121.00 258 0.00 0 0.00 0
2010 JESMAR ENERGY INC 121,172.00 342 0.00 0 0.00 0
2011 JESMAR ENERGY INC 19,553.00 90 0.00 0 0.00 0
2012 JESMAR ENERGY INC 0.00 0 0.00 0 0.00 0
2013 JESMAR ENERGY INC 0.00 0 0.00 0 0.00 0
2014 JESMAR ENERGY INC 0.00 0 0.00 0 0.00 0
2015 ROBIN ENERGY INC 0.00 0 0.00 0 0.00 0
2016 JESMAR ENERGY INC 0.00 0 0.00 0 0.00 0
2017 JESMAR ENERGY INC 0.00 0 0.00 0 0.00 0

For data sources see[5]

Waste Data

Period Operator Waste Type Quantity Disposal Method Waste Facility ID
2005 JESMAR ENERGY INC Brine 275.00 Bbl Other
2008 JESMAR ENERGY INC Brine 393.00 Bbl Brine or Industrial Waste Treatment Plt
2009 JESMAR ENERGY INC Brine 193.00 Bbl Brine or Industrial Waste Treatment Plt A2392008 PBR
2010 JESMAR ENERGY INC Produced Fluid 221.00 Bbl CENTRALIZED TREATMENT PLANT FOR RECYCLE PA-2392008

For data sources see[6]

Inspection Data

Inspections Performed

Inspection ID Inspection Category Inspection Date Inspection Type Inspection Result Inspection Comments
2644232 Primary Facility 2017-09-26 Routine/Complete Inspection No Violations Noted On September 26, 2017, the Department performed an inspection of the Robin Energy Blum#1 CBM well. The well is located in West Finley Twp., Washington Co. The inspection was related to release of mercaptan at the neighboring well site.

The operator plans to begin plugging and reclamation of the well site. The operator purchased the well from Jesmar and during removal of production equipment from a second site, the Hansen#1, a mercaptan tank was discovered. During removal of the tank approximately 2 gallons of mercaptan was released to the trailer and ground. The operator used bleach to oxidize the the mercaptan in the soil and on the trailer and has encased the mercaptan tank in plastic for disposal. The tank is being stored at the Blum 1 CBM well. A meeting is planned in the future with Department to initiate the plugging of the five CBM wells owned by the operator in Washington Co. which are not in production and need to be plugged and reclaimed.

For data sources see[7]