If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 37-125-23222 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":40.176115,"lon":-79.985433,"icon":""}]} |
Country: United States | |
State: Pennsylvania | |
County: Washington | |
Municipality: Fallowfield Township | |
Operator Name: DORSO LP | |
Well Pad ID: | |
Farm/Lease Name: DANNELS 4 | |
License Status: | |
Spud Date: | |
Permit Date: 2008-07-11 | |
Well Type: GAS | |
Unconventional Well: N | |
Configuration: Vertical Well | |
Conservation: No | |
Latitude: 40.176115 | |
Longitude: -79.985433 |
Date | Event |
---|---|
2008-07-11 | New Permit Application |
2008-10-16 | Performed Spud Operation |
2008-10-22 | Drilling Completion |
2009-10-19 | Perforation |
2009-10-19 | Performed Stimulation |
2010-02-18 | NEWLY DRILLED |
For data sources see[4]
Stimulation Date | Phase Number | Chemical Agent | Volume (gal) | Treating Pressure (psi) | Breakdown Pressure (psi) |
---|---|---|---|---|---|
2009-10-19 | 0 | 0 | 0 |
For data sources see[5]
Period | Operator Name | Gas Quantity (mcf) | Gas Production Days | Oil Quantity (bbl) | Oil Production Days | Water Quantity (bbl) | Water Production Days |
---|---|---|---|---|---|---|---|
2010 | DORSO LP | 10,611.00 | 365 | 0.00 | 0 | 0.00 | 0 |
2011 | DORSO LP | 9,239.00 | 365 | 0.00 | 0 | 0.00 | 0 |
2012 | DORSO LP | 7,957.00 | 365 | 0.00 | 0 | 0.00 | 0 |
2013 | DORSO LP | 6,761.00 | 365 | 0.00 | 0 | 0.00 | 0 |
2014 | DORSO LP | 6,215.00 | 365 | 0.00 | 0 | 0.00 | 0 |
2015 | DORSO LP | 5,618.00 | 365 | 0.00 | 0 | 0.00 | 0 |
2016 | DORSO LP | 4,786.00 | 335 | 0.00 | 0 | 0.00 | 0 |
2017 | DORSO LP | 4,455.00 | 365 | 0.00 | 0 | 0.00 | 0 |
2018 | DORSO LP | 4,991.00 | 365 | 0.00 | 0 | 0.00 | 0 |
For data sources see[6]
Inspection ID | Inspection Category | Inspection Date | Inspection Type | Inspection Result | Inspection Comments |
---|---|---|---|---|---|
1748904 | Primary Facility | 2008-11-10 | Complaint Inspection | No Violations Noted | Well drilled, restoration not yet complete. |
For data sources see[7]