X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

37-125-23271

Well Details

Well ID: 37-125-23271
Loading map...
Country: United States
State: Pennsylvania
County: Washington
Municipality: Cross Creek Township
Operator Name: CHEVRON APPALACHIA LLC
Well Pad ID: 148126
Farm/Lease Name: COWDEN 47H
License Status: ACTIVE
Spud Date:
Permit Date: 2008-09-09
Well Type: GAS
Unconventional Well: Y
Configuration: Horizontal Well
Conservation: Yes
Latitude: 40.269361
Longitude: -80.385417

For data sources see[1][2][3]

Well History

Date Event
2008-09-09 New Permit Application
2008-10-05 Performed Spud Operation
2008-10-13 Drilling Completion
2009-01-10 Perforation
2009-01-13 Performed Stimulation
2009-11-12 DEVIATED

For data sources see[4]

Stimulation Data

Stimulation Date Phase Number Chemical Agent Volume (gal) Treating Pressure (psi) Breakdown Pressure (psi)
2009-01-13 0 0 0

For data sources see[5]

Production Data

Period Operator Name Gas Quantity (mcf) Gas Production Days Oil Quantity (bbl) Oil Production Days Water Quantity (bbl) Water Production Days
2008 ATLAS RESOURCES LLC 0.00 0 0.00 0 0.00 0
2009 ATLAS RESOURCES LLC 28230.00 301 3434.00 301 0.00 0
2010 ATLAS RESOURCES LLC 124,235.50 366 8,526.50 366 0.00 0
2011 ATLAS RESOURCES LLC 68,867.00 181 0.00 0 3,987.12 181
2012 CHEVRON APPALACHIA LLC 0.00 0 0.00 0 33.11 182
2013 CHEVRON APPALACHIA LLC 0.00 0 0.00 0 0.00 0
2014 CHEVRON APPALACHIA LLC 0.00 0 0.00 0 0.00 0
2015 CHEVRON APPALACHIA LLC 0.00 0 0.00 0 0.00 0
2016 CHEVRON APPALACHIA LLC 0.00 0 0.00 0 0.00 0
2017 CHEVRON APPALACHIA LLC 0.00 0 0.00 0 0.00 0

For data sources see[6]

Waste Data

Period Operator Waste Type Quantity Disposal Method Waste Facility ID
2008 ATLAS RESOURCES LLC Brine 787.00 Bbl Municipal Sewage Treatment Plant PA0026891
2009 ATLAS RESOURCES LLC Fracking Fluid 10,800.00 Bbl Reuse other than road spreading
2009 ATLAS RESOURCES LLC Fracking Fluid 1,867.00 Bbl Municipal Sewage Treatment Plant
2009 ATLAS RESOURCES LLC Brine 735.00 Bbl Brine or Industrial Waste Treatment Plt PA0101508
2009 ATLAS RESOURCES LLC Fracking Fluid 85.00 Bbl Other
2009 ATLAS RESOURCES LLC Brine 125.00 Bbl Other
2009 ATLAS RESOURCES LLC Brine 35.00 Bbl Reuse other than road spreading
2009 ATLAS RESOURCES LLC Brine 1,520.00 Bbl Brine or Industrial Waste Treatment Plt PA0095273
2009 ATLAS RESOURCES LLC Brine 250.00 Bbl Municipal Sewage Treatment Plant
2010 ATLAS RESOURCES LLC Fracing Fluid Waste 570.00 Bbl CENTRALIZED TREATMENT PLANT FOR RECYCLE PA0101508
2010 ATLAS RESOURCES LLC Produced Fluid 150.00 Bbl CENTRALIZED TREATMENT PLANT FOR RECYCLE PA0101508
2010 ATLAS RESOURCES LLC Fracing Fluid Waste 962.50 Bbl CENTRALIZED TREATMENT PLANT FOR RECYCLE 301353
2010 ATLAS RESOURCES LLC Fracing Fluid Waste 342.50 Bbl IDENTIFY METHOD IN COMMENTS
2010 ATLAS RESOURCES LLC Produced Fluid 62.50 Bbl CENTRALIZED TREATMENT PLANT FOR RECYCLE PA0095273
2010 ATLAS RESOURCES LLC Produced Fluid 1,145.00 Bbl IDENTIFY METHOD IN COMMENTS 34-167-29359
2010 ATLAS RESOURCES LLC Produced Fluid 5,681.00 Bbl IDENTIFY METHOD IN COMMENTS
2010 ATLAS RESOURCES LLC Produced Fluid 185.00 Bbl CENTRALIZED TREATMENT PLANT FOR RECYCLE 301353
2010 ATLAS RESOURCES LLC Produced Fluid 124.00 Bbl STORAGE PENDING DISPOSAL OR REUSE 34-121-2-3995
2011 CHEVRON APPALACHIA LLC Produced Fluid 100.00 Bbl CENTRALIZED TREATMENT PLANT FOR RECYCLE
2011 CHEVRON APPALACHIA LLC Produced Fluid 710.00 Bbl IDENTIFY METHOD IN COMMENTS 34-167-29359
2012 CHEVRON APPALACHIA LLC Produced Fluid 220.00 Bbl INJECTION DISPOSAL WELL 34-121-23995
2016 CHEVRON APPALACHIA LLC Produced Fluid 2,287.11 Bbl INJECTION DISPOSAL WELL 34-121-23995
2016 CHEVRON APPALACHIA LLC Servicing Fluid 94.36 Tons LANDFILL 100172
2016 CHEVRON APPALACHIA LLC Synthetic Liner Materials 6.24 Tons LANDFILL 100172
2016 CHEVRON APPALACHIA LLC Produced Fluid 90.00 Bbl CENTRALIZED TREATMENT PLANT FOR RECYCLE WMGR123SW019

For data sources see[7]

Inspection Data

Inspections Performed

Inspection ID Inspection Category Inspection Date Inspection Type Inspection Result Inspection Comments
1754191 Primary Facility 2008-12-04 Routine/Complete Inspection No Violations Noted No issues at site.
1763527 Primary Facility 2009-01-20 Routine/Complete Inspection No Violations Noted Spill notification rec'd. Atlas has responded quickly.
1876367 Primary Facility 2010-04-01 Routine/Complete Inspection Violation(s) Noted The Department conducted an investigation in relation to a spill called in from Jim Braunns stating that Atlas excavated a pocket of condensate. The operator estimates that they lost less than 5 gallons. The operator dug a pit, lined it and placed all contaminated soil inside and covered it. WQS Steven Brokenshire and Bryon Miller responded to the call immediately on 3/31/10. I did a follow up inspection with WQS Scott Sabocheck and took EnCore samples on 4/1/10. Sample results are pending.
1880826 Primary Facility 2010-04-27 Compliance Evaluation No Violations Noted The Department conducted a compliance evaluation inspection on the violations noted on 4/1/10. The operator dug up all of the contaminated soil and placed it in a properly lined pit. After all of the soil had been removed and placed in the pit, the operator covered the pit with liner so as not to have it exposed to the elements. The violations were handled promptly and done correctly.
2060474 Primary Facility 2012-04-17 Routine/Complete Inspection No Violations Noted
2411523 Primary Facility 2015-09-29 Complaint Inspection No Violations Noted
2502855 Primary Facility 2016-07-11 Plugging(Includes Plugged/Mined Through) No Violations Noted Tbg @ 6634' plugged back with cement. Tagged TOC @ 5706', gas still coming up annulus. Planning to shoot off tbg and spot aditional balance plug. NOVIO
2502969 Primary Facility 2016-07-13 Plugging(Includes Plugged/Mined Through) No Violations Noted
2502991 Primary Facility 2016-07-15 Plugging(Includes Plugged/Mined Through) No Violations Noted Pulled on casing after shooting, could not get free. No collar on 5 1/2" csg, using spear to pull. Waiting on csg jack to pull and look for new free point and re-shoot and pull csg. NOVIO
2502994 Primary Facility 2016-07-19 Plugging(Includes Plugged/Mined Through) No Violations Noted Gates closed no access. NOVIO
2506161 Primary Facility 2016-07-26 Plugging(Includes Plugged/Mined Through) No Violations Noted Circulation established on 5 1/2" annulus. Operator will squeeze annulus to surface and then spot plugs remainder of casing to surface. NOVIO

Violations Commited

Inspection ID Violation ID Violation Date Date Resolved Violation Code Violation Type Violation Comments
1876367 585026 04/01/2010 2010-04-01 401 CSL - Discharge of pollultional material to waters of Commonwealth. Environmental Health & Safety I wrote violation for 78.57a and 78.54. neither of which are in EFACTS. WQS Higgins told me to mark this down and it would be changed. Thanks.

Penalties Applied

Violation ID Penalty ID Penalty Code Penalty Status Penalty Date Enforcement Date Penalty Amount Amount Collected
585026 256835 NOV - Notice of Violation Comply/Closed 2010-04-27
585026 272320 CACP - Consent Assessment of Civil Penalty Comply/Closed 2011-07-01 2011-07-01 $17,500.00 $17,500.00

For data sources see[8]

References