Well ID: 37-125-23339 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":40.452827,"lon":-80.343749,"icon":""}]} |
Country: United States | |
State: Pennsylvania | |
County: Washington | |
Municipality: Robinson Township | |
Operator Name: CHEVRON APPALACHIA LLC | |
Well Pad ID: 149200 | |
Farm/Lease Name: ROBINHILL 16H | |
License Status: ACTIVE | |
Spud Date: | |
Permit Date: 2008-10-16 | |
Well Type: GAS | |
Unconventional Well: Y | |
Configuration: Horizontal Well | |
Conservation: Yes | |
Latitude: 40.452827 | |
Longitude: -80.343749 |
Date | Event |
---|---|
2008-10-16 | New Permit Application |
2008-12-29 | Performed Spud Operation |
2009-04-13 | Drilling Completion |
2009-11-12 | DEVIATED |
2010-04-08 | Perforation |
2010-04-18 | Performed Stimulation |
For data sources see[4]
Stimulation Date | Phase Number | Chemical Agent | Volume (gal) | Treating Pressure (psi) | Breakdown Pressure (psi) |
---|---|---|---|---|---|
2010-04-18 | 0 | 0 | 0 |
For data sources see[5]
Period | Operator Name | Gas Quantity (mcf) | Gas Production Days | Oil Quantity (bbl) | Oil Production Days | Water Quantity (bbl) | Water Production Days |
---|---|---|---|---|---|---|---|
2008 | ATLAS RESOURCES LLC | 0.00 | 0 | 0.00 | 0 | 0.00 | 0 |
2009 | ATLAS RESOURCES LLC | 0.00 | 0 | 0.00 | 0 | 0.00 | 0 |
2010 | ATLAS RESOURCES LLC | 349,382.00 | 184 | 1,181.00 | 184 | 0.00 | 0 |
2011 | CHEVRON APPALACHIA LLC | 233,895.00 | 181 | 0.00 | 0 | 343.00 | 181 |
2012 | CHEVRON APPALACHIA LLC | 298,841.00 | 366 | 0.00 | 0 | 1,003.40 | 366 |
2013 | CHEVRON APPALACHIA LLC | 401,318.00 | 365 | 0.00 | 0 | 1,307.89 | 365 |
2014 | CHEVRON APPALACHIA LLC | 248,192.00 | 288 | 588.78 | 161 | 8,080.37 | 288 |
2015 | CHEVRON APPALACHIA LLC | 170,562.00 | 246 | 749.81 | 244 | 0.00 | 0 |
2016 | CHEVRON APPALACHIA LLC | 0.00 | 0 | 0.00 | 0 | 0.00 | 0 |
2017 | CHEVRON APPALACHIA LLC | 0.00 | 0 | 0.00 | 0 | 0.00 | 0 |
2019 | CHEVRON APPALACHIA LLC | 0.00 | 0 | 0.00 | 0 | 0.00 | 0 |
For data sources see[6]
Period | Operator | Waste Type | Quantity | Disposal Method | Waste Facility ID |
---|---|---|---|---|---|
2010 | ATLAS RESOURCES LLC | Fracing Fluid Waste | 3,655.00 Bbl | IDENTIFY METHOD IN COMMENTS | |
2010 | ATLAS RESOURCES LLC | Produced Fluid | 85.00 Bbl | CENTRALIZED TREATMENT PLANT FOR RECYCLE | PA0095273 |
2010 | ATLAS RESOURCES LLC | Produced Fluid | 17,028.00 Bbl | IDENTIFY METHOD IN COMMENTS | 34-167-29359 |
2010 | ATLAS RESOURCES LLC | Produced Fluid | 2,284.00 Bbl | STORAGE PENDING DISPOSAL OR REUSE | 34-121-2-3995 |
2010 | ATLAS RESOURCES LLC | Produced Fluid | 3,909.00 Bbl | IDENTIFY METHOD IN COMMENTS | |
2011 | CHEVRON APPALACHIA LLC | Produced Fluid | 10,399.00 Bbl | IDENTIFY METHOD IN COMMENTS | 34-167-29359 |
2011 | CHEVRON APPALACHIA LLC | Produced Fluid | 312.00 Bbl | INJECTION DISPOSAL WELL | 34-121-2-3995 |
2011 | CHEVRON APPALACHIA LLC | Produced Fluid | 827.00 Bbl | CENTRALIZED TREATMENT PLANT FOR RECYCLE | |
2012 | CHEVRON APPALACHIA LLC | Produced Fluid | 15,458.00 Bbl | INJECTION DISPOSAL WELL | 34-121-23995 |
2012 | CHEVRON APPALACHIA LLC | Fracturing Fluid Waste | 2.71 Tons | LANDFILL | SWF 1025 |
2013 | CHEVRON APPALACHIA LLC | Produced Fluid | 21,055.00 Bbl | INJECTION DISPOSAL WELL | 34-121-23995 |
2014 | CHEVRON APPALACHIA LLC | Produced Fluid | 6,920.00 Bbl | INJECTION DISPOSAL WELL | 34-121-23995 |
2015 | CHEVRON APPALACHIA LLC | Fracturing Fluid Waste | 45.29 Tons | LANDFILL | 100172 |
2015 | CHEVRON APPALACHIA LLC | Produced Fluid | 2,927.50 Bbl | INJECTION DISPOSAL WELL | 34-121-23995 |
2015 | CHEVRON APPALACHIA LLC | Fracing Fluid Waste | 250.00 Bbl | RESIDUAL WASTE PROC FAC (GENERAL PERMIT) | WMGR123SW001 |
2016 | CHEVRON APPALACHIA LLC | Produced Fluid | 60.00 Bbl | INJECTION DISPOSAL WELL | 34-121-23995 |
For data sources see[7]
Inspection ID | Inspection Category | Inspection Date | Inspection Type | Inspection Result | Inspection Comments |
---|---|---|---|---|---|
1779475 | Primary Facility | 2009-03-23 | Drilling/Alteration | No Violations Noted | Marcellus Well, trying to build curve, Nomac Rig 241 |
1836954 | Primary Facility | 2009-10-21 | Routine/Complete Inspection | No Violations Noted | The operator submitted a request for a six month site restoration extension on 10/9/09 due to pipeline and compressor station scheduling difficulties. The well reached total depth on 4/13/09 and the ID sign and E&S plan was on site. All E&S controls were installed properly and need to be maintained and inspected after every significant rainfall event. The following extension has been approved, and the deadline for the site restoration is 4/21/09. The Department requests that the fill slop be inspected on a regular basis to hinder any accelerated erosion. |
1877441 | Primary Facility | 2010-04-14 | Routine/Complete Inspection | No Violations Noted | On April 14th, 2010 I conducted a routine inspection of the above site. Frac crews were on site preparing to frac the well. Drilling was completed 4/13/2009. The access road was in good condition. A site ID sign and E&S plan were on posted site. The pits were approaching 2' of freeboard, but this is expected as the frac crews were on site. The E&S controls appeared to be functioning properly and should continue to be inspected routinley and after every significant rainfall event. |
1910616 | Primary Facility | 2010-07-28 | Routine/Complete Inspection | No Violations Noted | On July 28th, 2010 I conducted a routine inspection of the above site. Drilling was completed and the well was in production. The access road was in good condition. A site ID sign and E&S plan were on posted site. A well tag was present. Drilling pits had been closed. The site was graded, seeded and mulched and growth was coming in well. The well head was enclosed by a security fence. The tanks were enclosed with a lined and steel walled secondary containment structure. The E&S controls appeared to be functioning properly and should continue to be inspected routinley and after every significant rainfall event. |
1913123 | Primary Facility | 2010-08-03 | Routine/Complete Inspection | No Violations Noted | SITE IS RESTORED AND VEGETATED. WELL IS HOOKED UP AND FENCED. ACCESS IS STONED. TANK BATTERY IS CONTAINED IN STEEL BARRIER WITH POLY LINER. |
1948304 | Primary Facility | 2011-02-03 | Complaint Inspection | No Violations Noted | Id sign and e&s plan onsite. Drilling complete. 4 tanks for 16h onsite. Site snow covered but no apparent e&s problems. |
1959561 | Primary Facility | 2011-03-10 | Routine/Complete Inspection | No Violations Noted | On March 10th, 2011 I conducted a routine inspection of the above site. Drilling was completed and the well was in production. The access road was in good condition. A site ID sign and E&S plan were on posted site. A well tag was present. The site was restored and had good growth. The well head was enclosed by a security fence. The tanks were enclosed with a lined and steel walled secondary containment structure. A small ditch was beginning to erode at the back of the pad due to the recent rains. The operator was notified and crews were onsite immediately to stake hay bales at the top of the pad and line the ditch with hay to curtail any further erosion. |
1975545 | Primary Facility | 2011-04-19 | Complaint Inspection | No Violations Noted | Investigation related to Complaint #278664. I found the E&S plan on site. Erosion controls were good and the area well vegetated. No problems found. Took GPS reading. |
2212395 | Primary Facility | 2013-10-02 | Routine/Complete Inspection | No Violations Noted | |
2353953 | Primary Facility | 2015-03-19 | Routine/Complete Inspection | No Violations Noted |