If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 37-125-23712 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":40.05758,"lon":-79.992216,"icon":""}]} |
Country: United States | |
State: Pennsylvania | |
County: Washington | |
Municipality: Centerville Borough | |
Operator Name: ALLIANCE PETRO CO LLC | |
Well Pad ID: | |
Farm/Lease Name: M A RICHEY 3 | |
License Status: | |
Spud Date: | |
Permit Date: 2009-05-13 | |
Well Type: GAS | |
Unconventional Well: N | |
Configuration: Vertical Well | |
Conservation: No | |
Latitude: 40.057580 | |
Longitude: -79.992216 |
Date | Event |
---|---|
2009-05-13 | New Permit Application |
2010-02-23 | Performed Spud Operation |
2010-03-03 | Drilling Completion |
2010-03-09 | Perforation |
2010-03-09 | Performed Stimulation |
2010-09-23 | NEWLY DRILLED |
For data sources see[4]
Stimulation Date | Phase Number | Chemical Agent | Volume (gal) | Treating Pressure (psi) | Breakdown Pressure (psi) |
---|---|---|---|---|---|
2010-03-09 | 0 | 0 | 0 |
For data sources see[5]
Period | Operator Name | Gas Quantity (mcf) | Gas Production Days | Oil Quantity (bbl) | Oil Production Days | Water Quantity (bbl) | Water Production Days |
---|---|---|---|---|---|---|---|
2009 | CONSOL GAS CO | 0.00 | 0 | 0.00 | 0 | 0.00 | 0 |
2010 | CONSOL GAS CO | 15,843.00 | 365 | 0.00 | 0 | 0.00 | 0 |
2011 | CONSOL GAS CO | 0.00 | 0 | 0.00 | 0 | 0.00 | 0 |
2012 | CNX GAS CO LLC | 9,905.00 | 366 | 0.00 | 0 | 0.00 | 0 |
2013 | CNX GAS CO LLC | 7,722.83 | 365 | 0.00 | 0 | 0.00 | 0 |
2014 | CNX GAS CO LLC | 6,542.61 | 365 | 0.00 | 0 | 0.00 | 0 |
2015 | CNX GAS CO LLC | 5,630.57 | 365 | 0.00 | 0 | 0.00 | 0 |
2016 | CNX GAS CO LLC | 4,109.91 | 366 | 0.00 | 0 | 0.00 | 0 |
2017 | CNX GAS CO LLC | 4,754.63 | 334 | 0.00 | 0 | 0.00 | 0 |
2018 | CNX GAS CO LLC | 3,928.75 | 365 | 0.00 | 0 | 0.00 | 0 |
2019 | ALLIANCE PETRO CO LLC | 4,084.00 | 365 | 0.00 | 0 | 0.00 | 0 |
For data sources see[6]
Period | Operator | Waste Type | Quantity | Disposal Method | Waste Facility ID |
---|---|---|---|---|---|
2010 | CONSOL GAS CO | Produced Fluid | 85.00 Bbl | CENTRALIZED TREATMENT PLANT FOR RECYCLE | PA0091472 |
2010 | CONSOL GAS CO | Drilling Fluid Waste | 200.00 Bbl | CENTRALIZED TREATMENT PLANT FOR RECYCLE | PA0091472 |
2010 | CONSOL GAS CO | Fracing Fluid Waste | 500.00 Bbl | REUSE OTHER THAN ROAD SPREADING |
For data sources see[7]
Inspection ID | Inspection Category | Inspection Date | Inspection Type | Inspection Result | Inspection Comments |
---|---|---|---|---|---|
1873382 | Primary Facility | 2010-02-25 | Drilling/Alteration | No Violations Noted | Falcon 19 - waiting on cement set time, location and site good |
For data sources see[8]