If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 37-125-24219 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":40.063444,"lon":-79.994906,"icon":""}]} |
Country: United States | |
State: Pennsylvania | |
County: Washington | |
Municipality: West Pike Run Township | |
Operator Name: KRIEBEL WELLS DISSOLUTION CO LLC | |
Well Pad ID: | |
Farm/Lease Name: R DYKINS 001 | |
License Status: | |
Spud Date: | |
Permit Date: 2010-06-22 | |
Well Type: GAS | |
Unconventional Well: N | |
Configuration: Vertical Well | |
Conservation: No | |
Latitude: 40.063444 | |
Longitude: -79.994906 |
Date | Event |
---|---|
2010-06-22 | New Permit Application |
2011-05-18 | Permit Renewal Application |
2012-03-01 | Performed Spud Operation |
2012-03-13 | Drilling Completion |
2012-03-19 | Perforation |
2012-03-19 | Performed Stimulation |
2012-05-29 | NEWLY DRILLED |
For data sources see[4]
Stimulation Date | Phase Number | Chemical Agent | Volume (gal) | Treating Pressure (psi) | Breakdown Pressure (psi) |
---|---|---|---|---|---|
2012-03-19 | 0 | 0 | 0 |
For data sources see[5]
Period | Operator Name | Gas Quantity (mcf) | Gas Production Days | Oil Quantity (bbl) | Oil Production Days | Water Quantity (bbl) | Water Production Days |
---|---|---|---|---|---|---|---|
2010 | KRIEBEL MINERALS INC | 0.00 | 0 | 0.00 | 0 | 0.00 | 0 |
2011 | KRIEBEL MINERALS INC | 0.00 | 0 | 0.00 | 0 | 0.00 | 0 |
2012 | KRIEBEL MINERALS INC | 7,872.00 | 244 | 0.00 | 0 | 0.00 | 0 |
2013 | KRIEBEL MINERALS INC | 9,551.00 | 334 | 0.00 | 0 | 0.00 | 0 |
2014 | KRIEBEL MINERALS INC | 10,493.00 | 334 | 0.00 | 0 | 0.00 | 0 |
2015 | KRIEBEL MINERALS INC | 9,534.00 | 332 | 0.00 | 0 | 0.00 | 0 |
2016 | KRIEBEL MINERALS INC | 8,271.00 | 329 | 0.00 | 0 | 0.00 | 0 |
2017 | KRIEBEL WELLS DISSOLUTION CO LLC | 6,316.00 | 329 | 0.00 | 0 | 0.00 | 0 |
2018 | KRIEBEL WELLS DISSOLUTION CO LLC | 6,352.00 | 334 | 0.00 | 0 | 0.00 | 0 |
2019 | KRIEBEL WELLS DISSOLUTION CO LLC | 5,801.00 | 334 | 0.00 | 0 | 0.00 | 0 |
For data sources see[6]
Period | Operator | Waste Type | Quantity | Disposal Method | Waste Facility ID |
---|---|---|---|---|---|
2012 | KRIEBEL MINERALS INC | Produced Fluid | 40.00 Bbl | CENTRALIZED TREATMENT PLANT FOR RECYCLE | PA0095273 |
2012 | KRIEBEL MINERALS INC | Fracing Fluid Waste | 1,920.00 Bbl | CENTRALIZED TREATMENT PLANT FOR RECYCLE | PA0095273 |
2012 | KRIEBEL MINERALS INC | Drilling Fluid Waste | 160.00 Bbl | CENTRALIZED TREATMENT PLANT FOR RECYCLE | PA0095273 |
2012 | KRIEBEL MINERALS INC | Drilling Fluid Waste | 600.00 Bbl | CENTRALIZED TREATMENT PLANT FOR RECYCLE | PA0095443 |
2015 | KRIEBEL MINERALS INC | Produced Fluid | 50 Bbl | CENT WASTE TRT FAC NPDES | PA0095273 |
2015 | KRIEBEL MINERALS INC | Produced Fluid | 50.00 Bbl | CENT WASTE TRT FAC NPDES DISCHARGE | PA0095273 |
2017 | KRIEBEL WELLS DISSOLUTION CO LLC | Produced Fluid | 47.00 Bbl | CENT WASTE TRT FAC NPDES DISCHARGE | PA0095273 |
2018 | KRIEBEL WELLS DISSOLUTION CO LLC | Produced Fluid | 30.00 Bbl | CENT WASTE TRT FAC NPDES DISCHARGE | PA0095273 |
2019 | KRIEBEL WELLS DISSOLUTION CO LLC | Produced Fluid | 40.00 Bbl | CENT WASTE TRT FAC NPDES DISCHARGE | PA0095273 |
For data sources see[7]
Inspection ID | Inspection Category | Inspection Date | Inspection Type | Inspection Result | Inspection Comments |
---|---|---|---|---|---|
2452230 | Primary Facility | 2016-02-23 | Routine/Complete Inspection | No Violations Noted | Inspected well spud on 3/1/2012.
Well head and all equipment appear to be in good condition and well maintained. There is a separator, line heater and collection tank on site. |
2677586 | Primary Facility | 2017-06-05 | Complaint Inspection | No Violations Noted | On 6/5/17 a COMPL inspection of the the R DYKINS 001 well site was completed in response to complaint 327346. The following was observed:
>>The well site and production equipment appeared to be in generally good condition with no evidence of dead vegetation or spills. >>Standing water and mud in the immediate vicinity of the production equipment showed very slight sheen but field testing indicates iron bacteria as the source. >>Sample 3401-060 were taken for 946 analysis. >>An electronic inspection report will not be submitted as no operator email is on file with the department. |
2686622 | Primary Facility | 2017-08-30 | Administrative/File Review | No Violations Noted | On 8/30/17 an administrative inspection related to the R Dykins 001 Well Site was conducted in response to a complaint (CTS ID: 327346). Results for samples collected on 6/5/17 were analyzed, no evidence of oil and gas impact was identified. |
For data sources see[8]