If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 37-125-24278 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":40.454944,"lon":-80.340611,"icon":""}]} |
Country: United States | |
State: Pennsylvania | |
County: Washington | |
Municipality: Robinson Township | |
Operator Name: CHEVRON APPALACHIA LLC | |
Well Pad ID: 149201 | |
Farm/Lease Name: ROBINHILL 18H | |
License Status: | |
Spud Date: | |
Permit Date: 2010-09-09 | |
Well Type: GAS | |
Unconventional Well: Y | |
Configuration: Horizontal Well | |
Conservation: Yes | |
Latitude: 40.454944 | |
Longitude: -80.340611 |
Date | Event |
---|---|
2010-09-09 | New Permit Application |
2010-09-16 | Performed Spud Operation |
2010-12-14 | Drilling Completion |
2011-02-23 | Perforation |
2011-02-23 | Performed Stimulation |
2012-11-06 | DEVIATED |
For data sources see[4]
Job Number | Job Start Date | Job End Date | True Vertical Depth (ft) | Total Water Volume (gal) | Total Non-Water Volume (gal) |
---|---|---|---|---|---|
1 | 2011-03-01 | 2011-03-01 | 8,347 | 5,975,229 |
Job Number | Trade Name | Supplier | Purpose | Ingredient Name | CAS Number | Additive Percentage by Mass | Job Percentage by Mass | Mass Used (lb) |
---|---|---|---|---|---|---|---|---|
1 | Scale Inhibitor | Ethylene Glycol | 107-21-1 | 30.0 | 0.006 | |||
Carboxymethylhydroxyporoyl guar bln | Mixture | 100.0 | 0.015 | |||||
Hydrocholoric Acid | 7647-01-0 | 32.0 | 1.964 | |||||
Ethylene Glycol | 107-21-1 | 30.0 | 0.007 | |||||
Sand | Proppant | 100.0 | 10.51 | |||||
Used to open perfs | Hydrotreated Light Distillite | 64742-47-8 | 30.0 | 0.035 | ||||
Iron Control Agent | ||||||||
Water | Carrier/Base Fluid | 100.0 | 89.48 | |||||
Water Viscosifier | ||||||||
Friction Reducer | ||||||||
The chemical additive information reported herein is identical to the information reported by Chevron to the Pennsylvania Department of Environmental Protection. |
None | None |
For data sources see[5]
Stimulation Date | Phase Number | Chemical Agent | Volume (gal) | Treating Pressure (psi) | Breakdown Pressure (psi) |
---|---|---|---|---|---|
2011-02-23 | 0 | 0 | 0 |
For data sources see[6]
Period | Operator Name | Gas Quantity (mcf) | Gas Production Days | Oil Quantity (bbl) | Oil Production Days | Water Quantity (bbl) | Water Production Days |
---|---|---|---|---|---|---|---|
2010 | ATLAS RESOURCES LLC | 0.00 | 0 | 0.00 | 0 | 0.00 | 0 |
2011 | CHEVRON APPALACHIA LLC | 251,239.00 | 184 | 0.00 | 0 | 1,357.47 | 192 |
2012 | CHEVRON APPALACHIA LLC | 55,773.00 | 366 | 0.00 | 0 | 148.01 | 182 |
2013 | CHEVRON APPALACHIA LLC | 421,849.00 | 365 | 0.00 | 0 | 1,751.91 | 334 |
2014 | CHEVRON APPALACHIA LLC | 28,230.00 | 31 | 341.17 | 15 | 219.04 | 31 |
2015 | CHEVRON APPALACHIA LLC | 357,880.00 | 281 | 923.93 | 251 | 0.00 | 0 |
2016 | CHEVRON APPALACHIA LLC | 0.00 | 0 | 0.00 | 0 | 0.00 | 0 |
2017 | CHEVRON APPALACHIA LLC | 0.00 | 0 | 0.00 | 0 | 0.00 | 0 |
2019 | CHEVRON APPALACHIA LLC | 0.00 | 0 | 0.00 | 0 | 0.00 | 0 |
For data sources see[7]
Period | Operator | Waste Type | Quantity | Disposal Method | Waste Facility ID |
---|---|---|---|---|---|
2010 | ATLAS RESOURCES LLC | Drilling Fluid Waste | 4,260.00 Bbl | CENTRALIZED TREATMENT PLANT FOR RECYCLE | 301353 |
2011 | CHEVRON APPALACHIA LLC | Fracing Fluid Waste | 1,081.00 Bbl | REUSE OTHER THAN ROAD SPREADING | |
2011 | CHEVRON APPALACHIA LLC | Fracing Fluid Waste | 350.00 Bbl | CENTRALIZED TREATMENT PLANT FOR RECYCLE | WMGR123SW001 |
2011 | CHEVRON APPALACHIA LLC | Produced Fluid | 1,376.00 Bbl | IDENTIFY METHOD IN COMMENTS | 34-167-29359 |
2011 | CHEVRON APPALACHIA LLC | Produced Fluid | 9,388.00 Bbl | INJECTION DISPOSAL WELL | 34-121-2-3995 |
2011 | CHEVRON APPALACHIA LLC | Fracing Fluid Waste | 725.00 Bbl | CENTRALIZED TREATMENT PLANT FOR RECYCLE | 301353 |
2011 | CHEVRON APPALACHIA LLC | Produced Fluid | 657.00 Bbl | CENTRALIZED TREATMENT PLANT FOR RECYCLE | |
2011 | CHEVRON APPALACHIA LLC | Fracing Fluid Waste | 4,055.00 Bbl | CENTRALIZED TREATMENT PLANT FOR RECYCLE | PA0091472 |
2012 | CHEVRON APPALACHIA LLC | Produced Fluid | 3,440.00 Bbl | INJECTION DISPOSAL WELL | 34-121-23995 |
2013 | CHEVRON APPALACHIA LLC | Produced Fluid | 6,062.00 Bbl | INJECTION DISPOSAL WELL | 34-121-23995 |
2014 | CHEVRON APPALACHIA LLC | Produced Fluid | 342.50 Bbl | INJECTION DISPOSAL WELL | 34-121-23995 |
2015 | CHEVRON APPALACHIA LLC | Produced Fluid | 2,557.50 Bbl | INJECTION DISPOSAL WELL | 34-121-23995 |
For data sources see[8]
Inspection ID | Inspection Category | Inspection Date | Inspection Type | Inspection Result | Inspection Comments |
---|---|---|---|---|---|
1934233 | Primary Facility | 2010-10-14 | Drilling/Alteration | No Violations Noted | Whipstock 17 - TD@ 1679, drilling ahead, site and location good, returns on cement |
1934241 | Primary Facility | 2010-12-06 | Drilling/Alteration | No Violations Noted | Crown 8 - TD@6495, building curve, site and location good, pit good |
1938167 | Primary Facility | 2010-12-16 | Drilling/Alteration | No Violations Noted | Crown 8 - TD@11086 drilling completed and 5.5 production cemented back to surface, site and location good, pit good |
2054786 | Primary Facility | 2012-02-16 | Incident- Response to Accident or Event | In Compliance with Policy | Investigated condensate spill. Violations noted on 15H well. Efacts# 2054746 |
2054918 | Primary Facility | 2012-02-21 | Follow-up Inspection | In Compliance with Policy | Sampled, results pending. |
2055017 | Primary Facility | 2012-03-28 | Follow-up Inspection | In Compliance with Policy | Remediation check, no new problems. |
2062133 | Primary Facility | 2012-04-24 | Administrative/File Review | In Compliance with Policy | On April 12, 2012, at about 16:20 Nick Staffieri contacted WQSS Vince Yantko about a minor spill that happened at about 15:20 that day. This was followed up by a written incident report written by Nick on April 24, 2012. The review of the incident was assigned to WQS, John Carson who requested and received a copy of the Bill of Landing from Brian Rankin (also of Chevron). |
2065723 | Primary Facility | 2012-04-11 | Follow-up Inspection | In Compliance with Policy | On April 11, 2012, Ed Bates (Soil Scientist 2 with ECUP), Bill Keefer and I went to Chevron’s Robin Hill site to check on the clean-up progress and so Ed could discuss clean-up standards with them. We met primarily with Blake Loke and Matthew Barch. |
2071631 | Primary Facility | 2012-05-03 | Follow-up Inspection | Outstanding Violations - No Viols Req'd | On May 3, 2012, several representatives from DEP in both the Environmental Clean-Up Program and the Oil and Gas Program met with several representatives of Chevron and their subcontractors at the Robinhill site to get an update of the condensate spill remediation and to discuss where to go from there. |
2071691 | Primary Facility | 2012-05-29 | Follow-up Inspection | Outstanding Violations - No Viols Req'd | Site is now an Act 2 site. Still has some VOC hits but getting less. Making plans to handle contaminated and uncontaminated soil. |
2082289 | Primary Facility | 2012-07-06 | Follow-up Inspection | Outstanding Violations - No Viols Req'd | On July 6, 2012, I stopped at Robinhill #15 & #18 to check on their remediation progress. About half of the total pad has been removed. Chevron established a stockpile area about a quarter mile from the site (near the compressor station and crossroads) and the removed material is temporarily stored there. |
2083749 | Primary Facility | 2012-07-12 | Routine/Complete Inspection | Outstanding Violations - No Viols Req'd | Check the E&S controls and found no problems. |
2097624 | Primary Facility | 2012-08-22 | Follow-up Inspection | Outstanding Violations - No Viols Req'd | On August 22, 2012, I stopped at Robinhill #15 & #18 to check on the clean-up. |
2127382 | Primary Facility | 2013-01-04 | Administrative/File Review | In Compliance with Policy | An Administrative Review of this incident revealed the following: |
2130409 | Primary Facility | 2012-12-12 | Routine/Partial Inspection | Outstanding Violations - No Viols Req'd | On September 12, 2012, I stopped at Robinhill #15 & #18 to check on the clean-up. |
2133732 | Primary Facility | 2010-01-10 | Routine/Complete Inspection | No Violations Noted | On January 10, 2013 I stopped at the Robinhill #15 & #18 site to check the progress. The site was at grade and crews were working on the production equipment. The site is nearly done but needs temporarily stabilized. |
2133735 | Primary Facility | 2013-01-17 | Follow-up Inspection | No Violations Noted | On January 17, 2013 I stopped at the Robinhill #15 & #18 site to check the progress. The site was still not stabilized. |
2134433 | Primary Facility | 2013-01-24 | Follow-up Inspection | No Violations Noted | The appropriate E&S controls are in and the site is stabilized for the winter. |
2212397 | Primary Facility | 2013-10-02 | Routine/Complete Inspection | No Violations Noted | |
2353958 | Primary Facility | 2015-03-19 | Routine/Complete Inspection | No Violations Noted | |
2405354 | Primary Facility | 2015-09-04 | Site Restoration | No Violations Noted |
For data sources see[9]