If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 37-125-24311 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":40.457361,"lon":-80.357111,"icon":""}]} |
Country: United States | |
State: Pennsylvania | |
County: Washington | |
Municipality: Robinson Township | |
Operator Name: CHEVRON APPALACHIA LLC | |
Well Pad ID: 146945 | |
Farm/Lease Name: ROBINHILL UNIT 9H | |
License Status: | |
Spud Date: | |
Permit Date: 2010-10-19 | |
Well Type: GAS | |
Unconventional Well: Y | |
Configuration: Horizontal Well | |
Conservation: Yes | |
Latitude: 40.457361 | |
Longitude: -80.357111 |
Date | Event |
---|---|
2010-10-19 | New Permit Application |
2010-12-07 | Performed Spud Operation |
2010-12-21 | Drilling Completion |
2011-04-05 | Perforation |
2011-04-05 | Performed Stimulation |
2012-11-06 | DEVIATED |
For data sources see[4]
Job Number | Job Start Date | Job End Date | True Vertical Depth (ft) | Total Water Volume (gal) | Total Non-Water Volume (gal) |
---|---|---|---|---|---|
1 | 2011-04-07 | 2011-04-07 | 5,904 | 3,889,569 |
Job Number | Trade Name | Supplier | Purpose | Ingredient Name | CAS Number | Additive Percentage by Mass | Job Percentage by Mass | Mass Used (lb) |
---|---|---|---|---|---|---|---|---|
1 | Iron Control Agent | |||||||
Scale Inhibitor | Dibromoacetonitrile | 3252-43-5 | 5.00 | 0.00100000 | ||||
2,2-Dibromo-3-nitrilopropionamide | 10222-01-2 | 30.00 | 0.00600000 | |||||
Polyethylene glycol | 25322-68-3 | 60.00 | 0.01 | |||||
Distillates, petroleum, hydrotreated light | 64742-47-8 | 30.00 | 0.03 | |||||
Carboxymethylhydroxyporoyl guar bln | 100.00 | 1.02 | ||||||
Ethylene glycol | 107-21-1 | 30.00 | 0.00600000 | |||||
Hydrochloric acid | 7647-01-0 | 32.00 | 3.49 | |||||
Used to open perfs | ||||||||
Biocide | ||||||||
Water | Carrier/Base Fluid | 100.00 | 91.40 | |||||
Sand | Proppant | 100.00 | 8.59 | |||||
Friction Reducer | ||||||||
Water Viscosifier |
For data sources see[5]
Stimulation Date | Phase Number | Chemical Agent | Volume (gal) | Treating Pressure (psi) | Breakdown Pressure (psi) |
---|---|---|---|---|---|
2011-04-05 | 0 | 0 | 0 |
For data sources see[6]
Period | Operator Name | Gas Quantity (mcf) | Gas Production Days | Oil Quantity (bbl) | Oil Production Days | Water Quantity (bbl) | Water Production Days |
---|---|---|---|---|---|---|---|
2010 | ATLAS RESOURCES LLC | 0.00 | 0 | 0.00 | 0 | 0.00 | 0 |
2011 | CHEVRON APPALACHIA LLC | 110,147.00 | 46 | 0.00 | 0 | 502.56 | 46 |
2012 | CHEVRON APPALACHIA LLC | 268,703.00 | 366 | 0.00 | 0 | 804.46 | 366 |
2013 | CHEVRON APPALACHIA LLC | 246,386.00 | 365 | 0.00 | 0 | 482.15 | 365 |
2014 | CHEVRON APPALACHIA LLC | 264,045.00 | 365 | 270.76 | 184 | 891.91 | 365 |
2015 | CHEVRON APPALACHIA LLC | 163,146.00 | 281 | 317.90 | 159 | 0.00 | 0 |
2016 | CHEVRON APPALACHIA LLC | 0.00 | 0 | 0.00 | 0 | 0.00 | 0 |
2017 | CHEVRON APPALACHIA LLC | 0.00 | 0 | 0.00 | 0 | 0.00 | 0 |
2019 | CHEVRON APPALACHIA LLC | 0.00 | 0 | 0.00 | 0 | 0.00 | 0 |
For data sources see[7]
Period | Operator | Waste Type | Quantity | Disposal Method | Waste Facility ID |
---|---|---|---|---|---|
2011 | CHEVRON APPALACHIA LLC | Fracing Fluid Waste | 910.00 Bbl | REUSE OTHER THAN ROAD SPREADING | |
2011 | CHEVRON APPALACHIA LLC | Fracing Fluid Waste | 350.00 Bbl | CENTRALIZED TREATMENT PLANT FOR RECYCLE | WMGR123SW001 |
2011 | CHEVRON APPALACHIA LLC | Fracing Fluid Waste | 392.00 Bbl | IDENTIFY METHOD IN COMMENTS | 34-167-29359 |
2011 | CHEVRON APPALACHIA LLC | Fracing Fluid Waste | 75.00 Bbl | CENTRALIZED TREATMENT PLANT FOR RECYCLE | |
2011 | CHEVRON APPALACHIA LLC | Produced Fluid | 10,210.00 Bbl | CENTRALIZED TREATMENT PLANT FOR RECYCLE | 301353 |
2011 | CHEVRON APPALACHIA LLC | Produced Fluid | 3,087.00 Bbl | INJECTION DISPOSAL WELL | 34-121-2-3995 |
2011 | CHEVRON APPALACHIA LLC | Fracing Fluid Waste | 2,275.00 Bbl | CENTRALIZED TREATMENT PLANT FOR RECYCLE | 301353 |
2011 | CHEVRON APPALACHIA LLC | Produced Fluid | 4,690.00 Bbl | CENTRALIZED TREATMENT PLANT FOR RECYCLE | PA0091472 |
2011 | CHEVRON APPALACHIA LLC | Produced Fluid | 865.00 Bbl | CENTRALIZED TREATMENT PLANT FOR RECYCLE | PA0101508 |
2011 | CHEVRON APPALACHIA LLC | Produced Fluid | 960.00 Bbl | CENTRALIZED TREATMENT PLANT FOR RECYCLE | WMGR123SW001 |
2011 | CHEVRON APPALACHIA LLC | Drilling Fluid Waste | 3,120.00 Bbl | CENTRALIZED TREATMENT PLANT FOR RECYCLE | 301353 |
2011 | CHEVRON APPALACHIA LLC | Produced Fluid | 8,515.00 Bbl | CENTRALIZED TREATMENT PLANT FOR RECYCLE | 34-007-24355 |
2011 | CHEVRON APPALACHIA LLC | Produced Fluid | 110.00 Bbl | CENTRALIZED TREATMENT PLANT FOR RECYCLE | PA0095273 |
2011 | CHEVRON APPALACHIA LLC | Fracing Fluid Waste | 475.00 Bbl | CENTRALIZED TREATMENT PLANT FOR RECYCLE | PA0091472 |
2012 | CHEVRON APPALACHIA LLC | Produced Fluid | 5,415.00 Bbl | INJECTION DISPOSAL WELL | 34-121-23995 |
2013 | CHEVRON APPALACHIA LLC | Produced Fluid | 2,669.00 Bbl | INJECTION DISPOSAL WELL | 34-121-23995 |
2014 | CHEVRON APPALACHIA LLC | Produced Fluid | 2,484.00 Bbl | INJECTION DISPOSAL WELL | 34-121-23995 |
2015 | CHEVRON APPALACHIA LLC | Fracturing Fluid Waste | 18.94 Tons | LANDFILL | 100172 |
2015 | CHEVRON APPALACHIA LLC | Produced Fluid | 40.00 Bbl | RESIDUAL WASTE PROC FAC (GENERAL PERMIT) | WMGR123SW001 |
2015 | CHEVRON APPALACHIA LLC | Produced Fluid | 1,280.00 Bbl | INJECTION DISPOSAL WELL | 34-121-23995 |
For data sources see[8]
Inspection ID | Inspection Category | Inspection Date | Inspection Type | Inspection Result | Inspection Comments |
---|---|---|---|---|---|
1938169 | Primary Facility | 2010-12-16 | Drilling/Alteration | No Violations Noted | Whipstock 17- TD@3246, Drilling vertical ahead, returns on cement, site and location good, pit good |
1943252 | Primary Facility | 2011-01-06 | Routine/Complete Inspection | No Violations Noted | On January 6th, 2011 I conducted an inspection of the above site. A seam of coal had been encountered during construction of the pad and drilling pit. I met with Atlas representatives Gary Bowlen, Chad Eisenman, and Nick Staffieri on site. Approximately 300 tons of coal was encountered. Laboratory analysis showed a BTU value of 7,141 and a sulfur content of 0.60%. The coal was stock piled on site on a base of crushed limestone and surrounded by an earthen berm. A coal handling report was provided (attached). The coal will be mixed with 18 tons of limestone when replaced and encapsulated. I instructed the operator to cover the coal stock pile to avoid contact with precipitation and prevent any acidic runoff. |
1944795 | Primary Facility | 2010-01-16 | Complaint Inspection | No Violations Noted | |
1953099 | Primary Facility | 2011-01-25 | Routine/Complete Inspection | No Violations Noted | On January 25th, 2011 I conducted a follow up inspection of the above site in response to the coal encounter and inspection on January 6th, 2011. The stock pile is now covered with soil to prevent contact with precipitation. no runoff was observed from the stock pile. The rig was moving on site. Crews were laying out containment plastic under the rig and associated equipment. Drilling has not yet started. The access road was in good condition. A Site ID and E&S Plan were posted. The pits apperaered to be in good condition. No spills, leaks, or accelerated erosion were obseerved at the time of inspection. |
1953668 | Primary Facility | 2011-01-27 | Drilling/Alteration | No Violations Noted | Crown 8 - Rigged up , picking up directional tools to begin building curve, site and location good, pit good. |
1953671 | Primary Facility | 2011-01-31 | Drilling/Alteration | No Violations Noted | Crown 8 - TD@9131, 51/2 run and cemented back to surface, rigging down, site and location good, pit good. |
1958462 | Primary Facility | 2011-02-09 | Routine/Complete Inspection | No Violations Noted | On February 9th, 2011 I conducted a routine inspection of the above site. No runoff was observed from the coal stock pile. The rig has moved off site. The access road was in good condition. A Site ID and E&S Plan were posted. The pits apperaered to be in good condition. No spills, leaks, or accelerated erosion were observed at the time of inspection. |
1958811 | Primary Facility | 2011-02-23 | Routine/Complete Inspection | No Violations Noted | On February 23rd, 2011 I conducted a routine inspection of the above site. No runoff was observed from the coal stock pile. The rig has moved off site. The access road was being repaired. A Site ID and E&S Plan were posted. The pits were being expanded by raising the berm. Drill cuttings were hauled offsite. Water trucks wee bringing water in to fill the pits. No spills, leaks, or accelerated erosion were observed at the time of inspection. |
1972157 | Primary Facility | 2011-04-13 | Complaint Inspection | No Violations Noted | 4/12/11 ¿ Called complainant and talked over situation. Made preliminary arrangements to visit week of April 18th. |
1972158 | Primary Facility | 2011-04-19 | Complaint Inspection | No Violations Noted | 4/19/11 ¿ I sampled the McDonald¿s well for total coliforms and inorganic compounds. I also took one of the McDonald¿s cartridges, particulate filters for microscopic analysis. I also took photos of the well location. |
1984476 | Primary Facility | 2011-05-27 | Routine/Complete Inspection | No Violations Noted | On May 27th, 2011 I conducted a routine inspection of the above site. Drilling and frac were complete. Site restoration was underway. The access road was in good condition. A Site ID and E&S Plan were posted. The pits were closed and filled. Drill cuttings were hauled offsite. Efforts were being made to stabilize the fill slope and handle several spring time seeps. No spills, leaks, or accelerated erosion were observed at the time of inspection. |
1986459 | Primary Facility | 2011-06-13 | Routine/Complete Inspection | No Violations Noted | On June 13th, 2011 I met with Chevron representative George Bozek on above site to discuss restoration efforts. Drilling and frac were complete. Site restoration was underway. The access road was in good condition. A Site ID and E&S Plan were posted. The pits were closed and filled. Drill cuttings were hauled offsite. Efforts were being made to stabilize the fill slope and handle several spring time seeps. At this time water is being directed around the site. Final restoration plan to include additional riprap and filter sock to remain in place until permanent vegetation is established. No spills, leaks, or accelerated erosion were observed at the time of inspection. |
2082333 | Primary Facility | 2012-07-06 | Routine/Partial Inspection | No Violations Noted | On July 6, 2012, I stopped at Robinhill #9 to check the condensate control measures Chevron took. The well’s annulus was vented to a small tank and the pipes had matting underneath them. I found no problems. |
2083647 | Primary Facility | 2012-07-12 | Routine/Complete Inspection | No Violations Noted | On July 12, 2012, I stopped at Robinhill #9 with Brian Rankin & Jared Reichard of Chevron to check the restoration of Robinhill #9. This well site is currently shut down because of a small condensate release. Chevron made repairs and they were able to restrict the condensate release to the well’s cellar. Brian told me that they would be removing the rock in the cellar and talking it to a landfill. |
2085178 | Primary Facility | 2012-07-20 | Routine/Complete Inspection | No Violations Noted | |
2163799 | Primary Facility | 2013-04-16 | Routine/Complete Inspection | No Violations Noted | |
2212399 | Primary Facility | 2013-10-02 | Routine/Complete Inspection | No Violations Noted | |
2300597 | Primary Facility | 2014-07-29 | Site Restoration | No Violations Noted | |
2353951 | Primary Facility | 2015-03-19 | Routine/Complete Inspection | No Violations Noted |
For data sources see[9]