If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 37-125-24333 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":40.055578,"lon":-80.134642,"icon":""}]} |
Country: United States | |
State: Pennsylvania | |
County: Washington | |
Municipality: West Bethlehem Township | |
Operator Name: CHEVRON APPALACHIA LLC | |
Well Pad ID: 148469 | |
Farm/Lease Name: HAMBLETON UNIT 4H | |
License Status: | |
Spud Date: | |
Permit Date: 2010-12-03 | |
Well Type: GAS | |
Unconventional Well: Y | |
Configuration: Horizontal Well | |
Conservation: Yes | |
Latitude: 40.055578 | |
Longitude: -80.134642 |
Date | Event |
---|---|
2010-12-03 | New Permit Application |
2011-01-22 | Performed Spud Operation |
2011-06-27 | Drilling Completion |
2011-09-24 | Drilling Completion |
2012-11-06 | DEVIATED |
2015-03-04 | NEWLY DRILLED |
For data sources see[4]
Job Number | Job Start Date | Job End Date | True Vertical Depth (ft) | Total Water Volume (gal) | Total Non-Water Volume (gal) |
---|---|---|---|---|---|
1 | 2012-04-25 | 2012-04-25 | 7,437 | 6,049,483 |
Job Number | Trade Name | Supplier | Purpose | Ingredient Name | CAS Number | Additive Percentage by Mass | Job Percentage by Mass | Mass Used (lb) |
---|---|---|---|---|---|---|---|---|
1 | ASP 900 | Nalco | Friction Reducer | Ammonium sulfate | 7783-20-2 | 30.00 | ||
WG-36 GELLING AGENT | Halliburton Energy Services | Water Viscosifier | Guar gum | 9000-30-0 | 100.00 | 0.00260000 | ||
GBW-30 BREAKER | Halliburton Energy Services | Gel Breaker | Carbohydrates | 95.00 | 0.00008000 | |||
Hemicellulase enzyme | 9012-54-8 | 15.00 | 0.00001000 | |||||
Proppant (lbs) | Proppant | 9.18 | 10.00 | |||||
FR-66 Friction Reducer | Halliburton Energy Services | Friction Reducer | Distillates, petroleum, hydrotreated light | 64742-47-8 | 30.00 | 0.03 | ||
EC6673W | Nalco | Iron Control | Ethylene glycol | 107-21-1 | 30.00 | 0.00681000 | ||
7.5 Hcl Acid | Used to open perfs | Hydrochloric acid | 7647-01-0 | 7.50 | 0.28 | |||
Clean Volume (gals) | Carrier/Base Fluid | 90.82 | 100.00 | |||||
Biocide EC 6116A | Nalco | Biocide | Polyethylene glycol | 25322-68-3 | 60.00 | 0.01 | ||
Dibromoacetonitrile | 3252-43-5 | 5.00 | 0.00123000 | |||||
2,2-Dibromo-3-nitrilopropionamide | 10222-01-2 | 30.00 | 0.00737000 | |||||
EC6486A | Nalco | Scale Inhibitor | Ethylene glycol | 107-21-1 | 30.00 | 0.00722000 |
For data sources see[5]
Period | Operator Name | Gas Quantity (mcf) | Gas Production Days | Oil Quantity (bbl) | Oil Production Days | Water Quantity (bbl) | Water Production Days |
---|---|---|---|---|---|---|---|
2010 | ATLAS RESOURCES LLC | 0.00 | 0 | 0.00 | 0 | 0.00 | 0 |
2011 | CHEVRON APPALACHIA LLC | 0.00 | 0 | 0.00 | 0 | 0.00 | 0 |
2012 | CHEVRON APPALACHIA LLC | 89,177.00 | 61 | 0.00 | 0 | 0.00 | 0 |
2013 | CHEVRON APPALACHIA LLC | 1,952,185.00 | 365 | 0.00 | 0 | 0.00 | 0 |
2014 | CHEVRON APPALACHIA LLC | 988,027.00 | 334 | 0.00 | 0 | 0.00 | 0 |
2015 | CHEVRON APPALACHIA LLC | 674,292.00 | 365 | 0.00 | 0 | 0.00 | 0 |
2016 | CHEVRON APPALACHIA LLC | 512,687.00 | 366 | 0.00 | 0 | 0.00 | 0 |
2017 | CHEVRON APPALACHIA LLC | 408,741.00 | 365 | 0.00 | 0 | 0.00 | 0 |
2018 | CHEVRON APPALACHIA LLC | 345,373.00 | 365 | 0.00 | 0 | 0.00 | 0 |
2019 | CHEVRON APPALACHIA LLC | 270,955.00 | 365 | 0.00 | 0 | 0.00 | 0 |
For data sources see[6]
Period | Operator | Waste Type | Quantity | Disposal Method | Waste Facility ID |
---|---|---|---|---|---|
2011 | CHEVRON APPALACHIA LLC | Drilling Fluid Waste | 372.00 Bbl | CENTRALIZED TREATMENT PLANT FOR RECYCLE | WMGR123SW001 |
2011 | CHEVRON APPALACHIA LLC | Drilling Fluid Waste | 1,914.00 Bbl | CENTRALIZED TREATMENT PLANT FOR RECYCLE | PA0091472 |
2011 | CHEVRON APPALACHIA LLC | Drilling Fluid Waste | 3,925.00 Bbl | CENTRALIZED TREATMENT PLANT FOR RECYCLE | 301353 |
2011 | CHEVRON APPALACHIA LLC | Drilling Fluid Waste | 220.00 Bbl | CENTRALIZED TREATMENT PLANT FOR RECYCLE | PA0095273 |
2011 | CHEVRON APPALACHIA LLC | Drilling Fluid Waste | 380.00 Bbl | CENTRALIZED TREATMENT PLANT FOR RECYCLE | |
2012 | CHEVRON APPALACHIA LLC | Produced Fluid | 295.00 Bbl | REUSE OTHER THAN ROAD SPREADING | |
2012 | CHEVRON APPALACHIA LLC | Fracing Fluid Waste | 21,071.80 Bbl | REUSE OTHER THAN ROAD SPREADING | |
2012 | CHEVRON APPALACHIA LLC | Fracturing Fluid Waste | 69.45 Tons | LANDFILL | 100172 |
2012 | CHEVRON APPALACHIA LLC | Fracing Fluid Waste | 18.00 Bbl | CENTRALIZED TREATMENT PLANT FOR RECYCLE | WMGR123SW001 |
2013 | CHEVRON APPALACHIA LLC | Fracturing Fluid Waste | 59.08 Tons | LANDFILL | 100172 |
2013 | CHEVRON APPALACHIA LLC | Produced Fluid | 6,931.00 Bbl | REUSE OTHER THAN ROAD SPREADING | |
2014 | CHEVRON APPALACHIA LLC | Produced Fluid | 86.00 Bbl | INJECTION DISPOSAL WELL | 34-121-23995 |
2014 | CHEVRON APPALACHIA LLC | Produced Fluid | 2,277.60 Bbl | REUSE OTHER THAN ROAD SPREADING | |
2015 | CHEVRON APPALACHIA LLC | Fracturing Fluid Waste | 0.47 Tons | LANDFILL | 100172 |
2015 | CHEVRON APPALACHIA LLC | Produced Fluid | 1,225.00 Bbl | REUSE OTHER THAN ROAD SPREADING | |
2015 | CHEVRON APPALACHIA LLC | Produced Fluid | 60.00 Bbl | INJECTION DISPOSAL WELL | 34-121-23995 |
2015 | CHEVRON APPALACHIA LLC | Fracing Fluid Waste | 24.00 Bbl | RESIDUAL WASTE PROC FAC (GENERAL PERMIT) | WMGR123SW001 |
2016 | CHEVRON APPALACHIA LLC | Produced Fluid | 309.21 Bbl | CENTRALIZED TREATMENT PLANT FOR RECYCLE | WMGR123SW019 |
2016 | CHEVRON APPALACHIA LLC | Fracturing Fluid Waste | 1.60 Bbl | CENTRALIZED TREATMENT PLANT FOR RECYCLE | WMGR123SW019 |
2016 | CHEVRON APPALACHIA LLC | Produced Fluid | 756.12 Bbl | REUSE OTHER THAN ROAD SPREADING | |
2017 | CHEVRON APPALACHIA LLC | Produced Fluid | 224.44 Bbl | RESIDUAL WASTE PROCESSING FACILITY | WMGR123SW019 |
2017 | CHEVRON APPALACHIA LLC | Produced Fluid | 130.87 Bbl | REUSE AT A WELL PAD OUTSIDE PENNSYLVANIA | |
2017 | CHEVRON APPALACHIA LLC | Produced Fluid | 1,100.00 Bbl | INJECTION DISPOSAL WELL | 34-157-25511 |
2017 | CHEVRON APPALACHIA LLC | Produced Fluid | 2,126.00 Bbl | REUSE (AT WELL PAD) | |
2018 | CHEVRON APPALACHIA LLC | Produced Fluid | 67.00 Bbl | REUSE (AT WELL PAD) | |
2018 | CHEVRON APPALACHIA LLC | Produced Fluid | 134.80 Bbl | RESIDUAL WASTE PROCESSING FACILITY | WMGR123SW019 |
2018 | CHEVRON APPALACHIA LLC | Produced Fluid | 324.00 Bbl | REUSE AT A WELL PAD OUTSIDE PENNSYLVANIA | |
2018 | CHEVRON APPALACHIA LLC | Produced Fluid | 66.00 Bbl | RESIDUAL WASTE PROCESSING FACILITY | WMGR123SW005 |
2019 | CHEVRON APPALACHIA LLC | Produced Fluid | 478.00 Bbl | REUSE (AT WELL PAD) |
For data sources see[7]
Inspection ID | Inspection Category | Inspection Date | Inspection Type | Inspection Result | Inspection Comments |
---|---|---|---|---|---|
1953718 | Primary Facility | 2011-01-23 | Drilling/Alteration | No Violations Noted | Rocky Mountian Drilling - spud conductor , site still under construction , E&S in place |
1960558 | Primary Facility | 2011-03-04 | Drilling/Alteration | No Violations Noted | Nomak 230 - TD@ 214, drill 20" hole, site and location good, pit good. |
1960562 | Primary Facility | 2011-03-08 | Drilling/Alteration | No Violations Noted | Nomak 230 - TD@ 820, mine balance cmt job thru 200' pour sting went well, site and location good, pit good |
1999337 | Primary Facility | 2011-05-20 | Complaint Inspection | No Violations Noted | |
2065441 | Primary Facility | 2012-04-06 | Incident- Response to Accident or Event | No Violations Noted | viols linked to 5H eFacts ID #2065442, enforcement ID #283685. |
2065942 | Primary Facility | 2012-04-09 | Incident- Response to Accident or Event | No Violations Noted | viols for this inspection linked to 1H inspection # 2065932 |
2069694 | Primary Facility | 2012-05-02 | Compliance Evaluation | No Violations Noted | |
2080041 | Primary Facility | 2012-06-26 | Drilling/Alteration | No Violations Noted | |
2080824 | Primary Facility | 2012-06-19 | Routine/Complete Inspection | No Violations Noted | On June 19, 2012, I stopped at the Chevron’s Hambelton site for a routine inspection. The site has five stimulated wells but is not yet in production. |
2080858 | Primary Facility | 2012-07-03 | Follow-up Inspection | No Violations Noted | viols from the 4/9/12 release (eFACTS #2065934) have been corrected. |
2129953 | Primary Facility | 2012-10-03 | Complaint Inspection | No Violations Noted | I did a preliminary investigation and gathered background and historical information but was unable to sample because Mr. Hutchinson was not available to work the plumbing. I made preliminary plans to sample and left. |
2130007 | Primary Facility | 2012-12-06 | Complaint Inspection | No Violations Noted | Scheduling conflicts made sampling difficult. On December 6, 2012 I again, stopped at the Hutchison residence and made arrangements to sample the water. |
2130059 | Primary Facility | 2012-12-12 | Complaint Inspection | No Violations Noted | Scheduling conflicts made sampling difficult. On December 6, 2012 I again, stopped at the Hutchison residence and made arrangements to sample the water. |
2130091 | Primary Facility | 2013-01-14 | Administrative/File Review | No Violations Noted | I received the various lab results and checked them against Moody's (Chevron's enviromental contractor) report. It does nto appear that the Hambleton gas wells impacted theHutchison's water supply. See attached report. |
2295976 | Primary Facility | 2014-07-24 | Routine/Complete Inspection | No Violations Noted | Inspection of well - tag should be upgraded - difficult to find and illegible. Site appears to be restored and is stabilized. All temporary E&S controls have been removed. |
2296006 | Primary Facility | 2014-08-12 | Follow-up Inspection | No Violations Noted | Well tag placed in a conspicuous area on the well head and is legible. Site is restored and stable. |
2417334 | Primary Facility | 2015-10-14 | Routine/Complete Inspection | No Violations Noted | On 10/14/15, I performed a routine complete inspection on the Hambleton Unit and made the following observations: |
For data sources see[8]