If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 37-125-24531 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":40.080217,"lon":-80.296031,"icon":""}]} |
Country: United States | |
State: Pennsylvania | |
County: Washington | |
Municipality: South Franklin Township | |
Operator Name: HG ENERGY II APPALACHIA LLC | |
Well Pad ID: 148018 | |
Farm/Lease Name: CONSOL NV39CHS | |
License Status: | |
Spud Date: | |
Permit Date: 2011-10-06 | |
Well Type: GAS | |
Unconventional Well: Y | |
Configuration: Horizontal Well | |
Conservation: No | |
Latitude: 40.080217 | |
Longitude: -80.296031 |
Date | Event |
---|---|
2011-10-06 | New Permit Application |
2012-02-25 | Performed Spud Operation |
2012-11-24 | Drilling Completion |
2013-05-16 | Perforation |
2013-05-16 | Performed Stimulation |
2013-12-05 | DEVIATED |
For data sources see[4]
Job Number | Job Start Date | Job End Date | True Vertical Depth (ft) | Total Water Volume (gal) | Total Non-Water Volume (gal) |
---|---|---|---|---|---|
1 | 2013-05-16 | 2013-05-24 | 7,438 | 5,235,850 | 0 |
Job Number | Trade Name | Supplier | Purpose | Ingredient Name | CAS Number | Additive Percentage by Mass | Job Percentage by Mass | Mass Used (lb) |
---|---|---|---|---|---|---|---|---|
1 | ||||||||
and (Proppant), DAP-903, DWP-111, DWP-614, DWP-690, DWP-901, BioClear 2000, DWP-NE1, Spearhead Acid, |
CWS | Propping Agent, Scale Inhibitor, Gel Slurry, Viscosifier, Breaker, Breaker, Biocide, Non-Emulsifier, Clean Perforations, | Calcite | 471-34-1 | 1 | 0.0197 | 9758.07 | |
Hydrochloric acid | 7647-01-0 | 35 | 0.3474 | 171774 | ||||
Formaldehyde | 50-00-0 | 0.1 | 0.0001 | 49.08 | ||||
Alcohols, C14-15, ethoxylated | 68951-67-7 | 0.1 | 0.0015 | 736.17 | ||||
Oxirane, 2-methyl-, polymer with oxirane, monodecyl ether | 37251-67-5 | 1.5 | 0.0005 | 241.3 | ||||
Biotite | 1302-27-8 | 0.1 | 0.0026 | 1265.17 | ||||
Ammonium Persulfate | 7727-54-0 | 100 | 0.0047 | 2301.84 | ||||
Diallyldimethylammonium chloride | 7398-69-8 | 5 | 0.0028 | 1407.75 | ||||
Polyethylene Glycol Mixture | 25322-68-3 | 70 | 0.0131 | 6484.23 | ||||
Guar gum | 9000-30-0 | 60 | 0.0195 | 9651.82 | ||||
Illite | 12173-60-3 | 1 | 0.0044 | 2161.35 | ||||
Sodium chloride | 7647-14-5 | 0.1 | 0 | 24.54 | ||||
Ilmenite | 98072-94-7 | 0.1 | 0.0016 | 800.5 | ||||
Propargyl Alcohol | 107-19-7 | 0.1 | 0.0005 | 245.39 | ||||
Hydrogen Peroxide | 7722-84-1 | 10 | 0.0007 | 349.38 | ||||
Organic solvent | 57-55-6 | 0.1 | 0 | 0.44 | ||||
Alkenes, C>10 a- | 64743-02-8 | 0.1 | 0.0015 | 736.17 | ||||
Isopropanol | 67-63-0 | 40 | 0.0228 | 11262 | ||||
2-Propenoic acid, polymer with sodium phosphonate | 71050-62-9 | 60 | 0.0067 | 3300.12 | ||||
Goethite | 1310-14-1 | 0.1 | 0.0044 | 2194.51 | ||||
2-Propenoic acid, polymer with 2-propenamide, sodium salt | 25987-30-8 | 40 | 0.0395 | 19524.6 | ||||
2,2-Dibromo-3-Nitrilopropionamide | 10222-01-2 | 40 | 0.0131 | 6484.23 | ||||
Poly(oxyethylene)nonylphenol ether | 9016-45-9 | 5 | 0.0049 | 2440.58 | ||||
Crystalline silica (Quartz) | 14808-60-7 | 100 | 10.9805 | 5,428,850.0 | ||||
Dimethylcocoamine, bis(chloroethyl) ether, diquaternary ammonium salt |
68607-28-3 | 40 | 0.0228 | 11262 | ||||
Modified thiourea polymer | 68527-49-1 | 0.1 | 0.0015 | 736.17 | ||||
Distillates (petroleum), hydrotreated middle | 64742-46-7 | 60 | 0.0491 | 24295.3 | ||||
Direct red 81 | 2610-11-9 | 0.1 | 0 | 4.37 | ||||
Apatite | 64476-38-6 | 0.1 | 0.0026 | 1265.17 | ||||
Quaternary ammonium compounds, bis(hydrogenated tallow alkyl)dimethyl, salts with bentonite |
68953-58-2 | 5 | 0.0016 | 804.32 | ||||
Methanol | 67-56-1 | 15 | 0.0115 | 5695.6 | ||||
Phosphoric acid | 7664-38-2 | 0.1 | 0 | 0.44 | ||||
Fatty acids, tall-oil | 61790-12-3 | 0.1 | 0.0015 | 736.17 | ||||
Water, | Customer & CWS | Base Fluid & Mix Water, | Water | 7732-18-5 | 100 | 88.4118 | 43,711,300.0 |
For data sources see[5]
Stimulation Date | Phase Number | Chemical Agent | Volume (gal) | Treating Pressure (psi) | Breakdown Pressure (psi) |
---|---|---|---|---|---|
2013-05-16 | 0 | 0 | 0 |
For data sources see[6]
Period | Operator Name | Gas Quantity (mcf) | Gas Production Days | Oil Quantity (bbl) | Oil Production Days | Water Quantity (bbl) | Water Production Days |
---|---|---|---|---|---|---|---|
2011 | CNX GAS CO LLC | 0.00 | 0 | 0.00 | 0 | 0.00 | 0 |
2012 | CNX GAS CO LLC | 0.00 | 0 | 0.00 | 0 | 0.00 | 0 |
2013 | CNX GAS CO LLC | 138,028.97 | 189 | 0.00 | 0 | 0.00 | 0 |
2014 | CNX GAS CO LLC | 551,033.91 | 365 | 0.00 | 0 | 0.00 | 0 |
2015 | CNX GAS CO LLC | 322,372.15 | 365 | 0.00 | 0 | 0.00 | 0 |
2016 | NOBLE ENERGY INC | 893,625.86 | 366 | 0.00 | 0 | 19.00 | 31 |
2017 | HG ENERGY II APPALACHIA LLC | 308,977.30 | 365 | 0.00 | 0 | 22.00 | 89 |
2018 | HG ENERGY II APPALACHIA LLC | 281,630.00 | 365 | 0.00 | 0 | 0.00 | 0 |
2019 | HG ENERGY II APPALACHIA LLC | 224,016.00 | 365 | 0.00 | 0 | 0.00 | 0 |
For data sources see[7]
Period | Operator | Waste Type | Quantity | Disposal Method | Waste Facility ID |
---|---|---|---|---|---|
2012 | CNX GAS CO LLC | Drill Cuttings | 38.18 Tons | LANDFILL | 100592 |
2012 | CNX GAS CO LLC | Drill Cuttings | 130.96 Tons | LANDFILL | 100277 |
2012 | CNX GAS CO LLC | Drill Cuttings | 1,817.18 Tons | LANDFILL | 100172 |
2012 | CNX GAS CO LLC | Drilling Fluid Waste | 68.42 Bbl | LANDFILL | 0250050885 |
2013 | CNX GAS CO LLC | Fracing Fluid Waste | 20.81 Bbl | LANDFILL | 100172 |
2013 | CNX GAS CO LLC | Produced Fluid | 8,778.50 Bbl | REUSE OTHER THAN ROAD SPREADING | |
2013 | CNX GAS CO LLC | Produced Fluid | 243.16 Bbl | INJECTION DISPOSAL WELL | 34-013-20609 |
2013 | CNX GAS CO LLC | Produced Fluid | 172.91 Bbl | INJECTION DISPOSAL WELL | 34-031-27177 |
2013 | CNX GAS CO LLC | Produced Fluid | 8.97 Bbl | INJECTION DISPOSAL WELL | 34-119-28776 |
2013 | CNX GAS CO LLC | Produced Fluid | 94.77 Bbl | INJECTION DISPOSAL WELL | 34-059-24202 |
2013 | CNX GAS CO LLC | Produced Fluid | 676.82 Bbl | INJECTION DISPOSAL WELL | 34-105-23619 |
2014 | CNX GAS CO LLC | Produced Fluid | 29.64 Bbl | INJECTION DISPOSAL WELL | 34-121-23995 |
2014 | CNX GAS CO LLC | Produced Fluid | 207.49 Bbl | STORAGE PENDING DISPOSAL OR REUSE | |
2014 | CNX GAS CO LLC | Produced Fluid | 113.63 Bbl | INJECTION DISPOSAL WELL | 34-013-20609 |
2014 | CNX GAS CO LLC | Produced Fluid | 24.70 Bbl | INJECTION DISPOSAL WELL | 34-119-28776 |
2014 | CNX GAS CO LLC | Produced Fluid | 24.70 Bbl | INJECTION DISPOSAL WELL | 2D0859721 |
2014 | CNX GAS CO LLC | Produced Fluid | 93.87 Bbl | INJECTION DISPOSAL WELL | 34-059-24202 |
2014 | CNX GAS CO LLC | Produced Fluid | 2,436.97 Bbl | REUSE OTHER THAN ROAD SPREADING | |
2015 | CNX GAS CO LLC | Produced Fluid | 1,585.34 Bbl | REUSE OTHER THAN ROAD SPREADING | |
2016 | CNX GAS CO LLC | Fracturing Fluid Waste | 36.68 Bbl | REUSE OTHER THAN ROAD SPREADING | |
2016 | CNX GAS CO LLC | Produced Fluid | 198.84 Bbl | INJECTION DISPOSAL WELL | 34-119-28803 |
2016 | CNX GAS CO LLC | Produced Fluid | 100.00 Bbl | INJECTION DISPOSAL WELL | 34-013-20609 |
2016 | CNX GAS CO LLC | Produced Fluid | 2,215.05 Bbl | REUSE OTHER THAN ROAD SPREADING | |
2017 | NOBLE ENERGY INC | Produced Fluid | 3,708.08 Bbl | REUSE AT A WELL PAD OUTSIDE PENNSYLVANIA | |
2017 | NOBLE ENERGY INC | Produced Fluid | 3,267.00 Bbl | REUSE OTHER THAN ROAD SPREADING | |
2017 | NOBLE ENERGY INC | Produced Fluid | 314.00 Bbl | INJECTION DISPOSAL WELL | 34-119-28803 |
2018 | HG ENERGY II APPALACHIA LLC | Produced Fluid | 685.00 Bbl | REUSE AT A WELL PAD OUTSIDE PENNSYLVANIA | |
2018 | HG ENERGY II APPALACHIA LLC | Produced Fluid | 431.00 Bbl | INJECTION DISPOSAL WELL | 34-119-28803 |
2019 | HG ENERGY II APPALACHIA LLC | Produced Fluid | 157.00 Bbl | INJECTION DISPOSAL WELL | 34-119-28803 |
2019 | HG ENERGY II APPALACHIA LLC | Produced Fluid | 78.00 Bbl | REUSE AT A WELL PAD OUTSIDE PENNSYLVANIA |
For data sources see[8]
Inspection ID | Inspection Category | Inspection Date | Inspection Type | Inspection Result | Inspection Comments |
---|---|---|---|---|---|
2052146 | Primary Facility | 2012-02-23 | Routine/Complete Inspection | No Violations Noted | |
2063692 | Primary Facility | 2012-04-06 | Complaint Inspection | In Compliance with Policy | Untcontrolled drilling liquid resulted in fish kill. See inspection 2063667. |
2063792 | Primary Facility | 2012-04-09 | Follow-up Inspection | In Compliance with Policy | CNX is capturing the effluent from the spring and pumping it back into the pad. Testing being done. |
2082190 | Primary Facility | 2012-07-06 | Routine/Complete Inspection | No Violations Noted | On July 6, 2012, I stopped at CONSOL’s NV-39 site and checked on the E&S controls while I was there. |
2083071 | Primary Facility | 2012-07-06 | Drilling/Alteration | No Violations Noted | |
2107704 | Primary Facility | 2012-10-15 | Routine/Complete Inspection | No Violations Noted | |
2514609 | Primary Facility | 2016-08-05 | Incident- Response to Accident or Event | In Compliance with Policy | An incident response conducted as the result of an operator notification. |
2766859 | Primary Facility | 2018-08-13 | Routine/Complete Inspection | No Violations Noted | On August 13, 2018, the Department performed an inspection of the HG Energy, NV39HS well site. Present at time of inspection was Jay Kendra (HG). The site is located in South Franklin Twp., Washington Co. The inspection was related to a request by the operator to meet on site to discuss start of construction of the PCSM structures.
The operator plans to begin installation of the PCSM structures on the site and progress towards termination of the ESCGP2 permit. 6 wells have been drilled to completion on the site and are equipped for production. |
For data sources see[9]