If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 37-125-24533 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":40.092211,"lon":-80.298403,"icon":""}]} |
Country: United States | |
State: Pennsylvania | |
County: Washington | |
Municipality: South Franklin Township | |
Operator Name: HG ENERGY II APPALACHIA LLC | |
Well Pad ID: 148004 | |
Farm/Lease Name: CONRHEIN NV41BHS | |
License Status: | |
Spud Date: | |
Permit Date: 2011-10-21 | |
Well Type: GAS | |
Unconventional Well: Y | |
Configuration: Horizontal Well | |
Conservation: No | |
Latitude: 40.092211 | |
Longitude: -80.298403 |
Date | Event |
---|---|
2011-10-21 | New Permit Application |
2011-10-24 | Drilling Completion |
2011-11-03 | Performed Spud Operation |
2012-03-12 | Drilling Completion |
2013-02-22 | Perforation |
2013-04-14 | Performed Stimulation |
2015-01-20 | DEVIATED |
2015-01-20 | NEWLY DRILLED |
For data sources see[4]
Job Number | Job Start Date | Job End Date | True Vertical Depth (ft) | Total Water Volume (gal) | Total Non-Water Volume (gal) |
---|---|---|---|---|---|
1 | 2013-04-14 | 2013-04-14 | 7,472 | 294,630 | 0 |
Job Number | Trade Name | Supplier | Purpose | Ingredient Name | CAS Number | Additive Percentage by Mass | Job Percentage by Mass | Mass Used (lb) |
---|---|---|---|---|---|---|---|---|
1 | Water | Customer & CWS | Base Fluid & Mix Water | Water | 7732-18-5 | 100 | 86.7076 | 2,459,880.0 |
Sand (Proppant), DAP-903, DWP-603, DWP-690, BioClear 2000, DWP-NE1, Spearhead Acid |
CWS | Propping Agent, Scale Inhibitor, Friction Reducer, Breaker, Biocide, Non-Emulsifier, Clean Perforations | Sorbitan monooleate | 1338-43-8 | 5 | 0.00665 | 188.65 | |
Organic solvent | 57-55-6 | 0.1 | 0 | 0.02 | ||||
Biotite | 1302-27-8 | 0.1 | 0.00282 | 79.91 | ||||
Goethite | 1310-14-1 | 0.1 | 0.00496 | 140.73 | ||||
Modified thiourea polymer | 68527-49-1 | 0.1 | 0.00268 | 76.16 | ||||
Sodium chloride | 7647-14-5 | 0.1 | 0.00009000 | 2.54 | ||||
Polyethylene glycol mixture | 25322-68-3 | 70 | 0.01312 | 372.3 | ||||
Fatty acids, tall-oil | 61790-12-3 | 0.1 | 0.00268 | 76.16 | ||||
Alkenes, C>10 a- | 64743-02-8 | 0.1 | 0.00268 | 76.16 | ||||
Dimethylcocoamine, bis(chloroethyl) ether, diquaternary ammonium salt |
68607-28-3 | 40 | 0.02307 | 654.52 | ||||
Crystalline silica (Quartz) | 14808-60-7 | 100 | 12.4208 | 352375 | ||||
Formaldehyde | 50-00-0 | 0.1 | 0.00018 | 5.08 | ||||
Ilmenite | 98072-94-7 | 0.1 | 0.00174 | 49.5 | ||||
2,2-Dibromo-3-Nitrilopropionamide | 10222-01-2 | 20 | 0.01312 | 372.3 | ||||
Propargyl Alcohol | 107-19-7 | 0.1 | 0.00089 | 25.39 | ||||
Phosphoric acid | 7664-38-2 | 0.1 | 0 | 0.02 | ||||
Apatite | 64476-38-6 | 0.1 | 0.00282 | 79.91 | ||||
Methanol | 67-56-1 | 15 | 0.01402 | 397.76 | ||||
Hydrogen Peroxide | 7722-84-1 | 10 | 0.0007 | 19.93 | ||||
Direct red 81 | 2610-11-9 | 0.1 | 0.00001000 | 0.25 | ||||
Ammonium chloride | 12125-02-9 | 1.5 | 0.002 | 56.6 | ||||
Diallyldimethylammonium chloride | 7398-69-8 | 5 | 0.00288 | 81.82 | ||||
Isopropanol | 67-63-0 | 40 | 0.02307 | 654.52 | ||||
Poly(oxyethylene)nonylphenol ether | 9016-45-9 | 5 | 0.00665 | 188.65 | ||||
2-Propenoic acid, polymer with sodium phosphonate | 71050-62-9 | 60 | 0.00668 | 189.49 | ||||
Illite | 12173-60-3 | 1 | 0.00471 | 133.65 | ||||
Calcite | 471-34-1 | 1 | 0.02251 | 638.61 | ||||
Hydrochloric acid | 7647-01-0 | 35 | 0.62636 | 17769.7 | ||||
Alcohols, C14-15, ethoxylated | 68951-67-7 | 0.1 | 0.00268 | 76.16 | ||||
Poly(Acrylamide and Adam methyl Chloride) | 69418-26-4 | 40 | 0.04655 | 1320.56 | ||||
Paraffinic hydrocarbon solvent | 64742-47-8 | 30 | 0.03524 | 999.85 |
For data sources see[5]
Stimulation Date | Phase Number | Chemical Agent | Volume (gal) | Treating Pressure (psi) | Breakdown Pressure (psi) |
---|---|---|---|---|---|
2013-04-14 | 0 | 0 | 0 |
For data sources see[6]
Period | Operator Name | Gas Quantity (mcf) | Gas Production Days | Oil Quantity (bbl) | Oil Production Days | Water Quantity (bbl) | Water Production Days |
---|---|---|---|---|---|---|---|
2011 | CNX GAS CO LLC | 0.00 | 0 | 0.00 | 0 | 0.00 | 0 |
2012 | CNX GAS CO LLC | 0.00 | 0 | 0.00 | 0 | 0.00 | 0 |
2013 | CNX GAS CO LLC | 345,169.50 | 241 | 0.00 | 0 | 0.00 | 0 |
2014 | CNX GAS CO LLC | 1,005,113.45 | 365 | 0.00 | 0 | 0.00 | 0 |
2015 | CNX GAS CO LLC | 653,605.37 | 365 | 0.00 | 0 | 0.00 | 0 |
2016 | NOBLE ENERGY INC | 447,768.48 | 366 | 0.00 | 0 | 88.00 | 31 |
2017 | HG ENERGY II APPALACHIA LLC | 320,099.10 | 365 | 0.00 | 0 | 0.00 | 0 |
2018 | HG ENERGY II APPALACHIA LLC | 300,857.00 | 365 | 0.00 | 0 | 0.00 | 0 |
2019 | HG ENERGY II APPALACHIA LLC | 258,934.00 | 365 | 0.00 | 0 | 0.00 | 0 |
For data sources see[7]
Period | Operator | Waste Type | Quantity | Disposal Method | Waste Facility ID |
---|---|---|---|---|---|
2012 | CNX GAS CO LLC | Drill Cuttings | 1.71 Tons | LANDFILL | 100592 |
2012 | CNX GAS CO LLC | Drilling Fluid Waste | 2,287.27 Bbl | LANDFILL | 0250050885 |
2012 | CNX GAS CO LLC | Drill Cuttings | 1,153.26 Tons | LANDFILL | 100172 |
2012 | CNX GAS CO LLC | Drill Cuttings | 2.48 Tons | LANDFILL | 0250050885 |
2013 | CNX GAS CO LLC | Fracing Fluid Waste | 55.30 Bbl | LANDFILL | 100172 |
2013 | CNX GAS CO LLC | Produced Fluid | 7,943.11 Bbl | REUSE OTHER THAN ROAD SPREADING | |
2013 | CNX GAS CO LLC | Produced Fluid | 103.40 Bbl | INJECTION DISPOSAL WELL | 34-013-20609 |
2013 | CNX GAS CO LLC | Produced Fluid | 73.53 Bbl | INJECTION DISPOSAL WELL | 34-031-27177 |
2013 | CNX GAS CO LLC | Produced Fluid | 3.82 Bbl | INJECTION DISPOSAL WELL | 34-119-28776 |
2013 | CNX GAS CO LLC | Produced Fluid | 40.30 Bbl | INJECTION DISPOSAL WELL | 34-059-24202 |
2013 | CNX GAS CO LLC | Produced Fluid | 287.80 Bbl | INJECTION DISPOSAL WELL | 34-105-23619 |
2014 | CNX GAS CO LLC | Produced Fluid | 70.06 Bbl | INJECTION DISPOSAL WELL | 34-059-24202 |
2014 | CNX GAS CO LLC | Produced Fluid | 22.12 Bbl | INJECTION DISPOSAL WELL | 34-121-23995 |
2014 | CNX GAS CO LLC | Produced Fluid | 154.86 Bbl | STORAGE PENDING DISPOSAL OR REUSE | |
2014 | CNX GAS CO LLC | Produced Fluid | 84.80 Bbl | INJECTION DISPOSAL WELL | 34-013-20609 |
2014 | CNX GAS CO LLC | Produced Fluid | 18.44 Bbl | INJECTION DISPOSAL WELL | 34-119-28776 |
2014 | CNX GAS CO LLC | Produced Fluid | 18.44 Bbl | INJECTION DISPOSAL WELL | 2D0859721 |
2014 | CNX GAS CO LLC | Produced Fluid | 3,019.53 Bbl | REUSE OTHER THAN ROAD SPREADING | |
2015 | CNX GAS CO LLC | Produced Fluid | 2,347.02 Bbl | REUSE OTHER THAN ROAD SPREADING | |
2016 | CNX GAS CO LLC | Produced Fluid | 15.00 Bbl | INJECTION DISPOSAL WELL | 34-119-28780 |
2016 | CNX GAS CO LLC | Produced Fluid | 99.00 Bbl | INJECTION DISPOSAL WELL | 34-119-28803 |
2016 | CNX GAS CO LLC | Produced Fluid | 26.00 Bbl | INJECTION DISPOSAL WELL | 34-013-20609 |
2016 | CNX GAS CO LLC | Produced Fluid | 1,563.72 Bbl | REUSE OTHER THAN ROAD SPREADING | |
2017 | NOBLE ENERGY INC | Produced Fluid | 600.99 Bbl | REUSE AT A WELL PAD OUTSIDE PENNSYLVANIA | |
2017 | NOBLE ENERGY INC | Produced Fluid | 88.66 Bbl | REUSE OTHER THAN ROAD SPREADING | |
2017 | NOBLE ENERGY INC | Produced Fluid | 253.00 Bbl | INJECTION DISPOSAL WELL | 34-119-28803 |
2018 | HG ENERGY II APPALACHIA LLC | Produced Fluid | 381.00 Bbl | REUSE AT A WELL PAD OUTSIDE PENNSYLVANIA | |
2018 | HG ENERGY II APPALACHIA LLC | Produced Fluid | 308.00 Bbl | INJECTION DISPOSAL WELL | 34-119-28803 |
2019 | HG ENERGY II APPALACHIA LLC | Produced Fluid | 214.00 Bbl | SURFACE IMPOUNDMENT | 95-7-37312-19 |
2019 | HG ENERGY II APPALACHIA LLC | Produced Fluid | 100.00 Bbl | SURFACE IMPOUNDMENT | 95-7-37312-21 |
2019 | HG ENERGY II APPALACHIA LLC | Produced Fluid | 502.00 Bbl | INJECTION DISPOSAL WELL | 34-119-28803 |
2019 | HG ENERGY II APPALACHIA LLC | Produced Fluid | 46.00 Bbl | REUSE AT A WELL PAD OUTSIDE PENNSYLVANIA |
For data sources see[8]
Inspection ID | Inspection Category | Inspection Date | Inspection Type | Inspection Result | Inspection Comments |
---|---|---|---|---|---|
2016776 | Primary Facility | 2011-10-27 | Drilling/Alteration | No Violations Noted | Well spud - Butches rat hole, site and location good, E&S in place |
2107732 | Primary Facility | 2012-10-12 | Routine/Complete Inspection | No Violations Noted | |
2222421 | Primary Facility | 2013-10-28 | Routine/Complete Inspection | No Violations Noted | |
2815082 | Primary Facility | 2018-11-27 | Routine/Complete Inspection | No Violations Noted | Today I conducted a routine inspection at the NV41HS well pad and the following was observed.
Proper signs were displayed identifying the site. The access road was maintained and in good condition. The outer slopes were stabilized with thick vegetation no erosion observed outside of the LOD. The well heads were maintained no leaks or defects observed. The production tanks were in good condition no defects or leaks.The production tanks secondary containment was intact.
|
For data sources see[9]