X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

37-125-24540

Well Details

Well ID: 37-125-24540
Loading map...
Country: United States
State: Pennsylvania
County: Washington
Municipality: Morris Township
Operator Name: CNX GAS CO LLC
Well Pad ID: 148016
Farm/Lease Name: CONSOL
License Status: Active
Spud Date: 2012-05-03
Permit Date: 2011-10-05
Well Type: GAS
Unconventional Well: Y
Configuration: Horizontal Well
Conservation: No
Latitude: 40.067617
Longitude: -80.304133

For data sources see[1][2][3]

Well History

Date Event
2011-10-05 New Permit Application
2012-02-01 New Permit Application
2012-05-03 Performed Spud Operation
2012-08-17 Drilling Completion
2012-12-28 Drilling Completion
2013-07-12 Perforation
2013-08-23 Perforation
2013-08-23 Performed Stage 1 of Stimulation
2013-08-23 Performed Stage 2 of Stimulation
2013-08-24 Perforation
2013-08-24 Performed Stage 3 of Stimulation
2013-08-25 Perforation
2013-08-25 Performed Stage 4 of Stimulation
2013-08-25 Performed Stage 5 of Stimulation
2013-08-25 Performed Stage 6 of Stimulation
2013-08-26 Perforation
2013-08-26 Performed Stage 7 of Stimulation
2013-08-26 Performed Stage 8 of Stimulation
2013-08-26 Performed Stage 9 of Stimulation
2013-08-27 Perforation
2013-08-27 Performed Stage 10 of Stimulation
2013-08-27 Performed Stage 11 of Stimulation
2013-08-27 Performed Stage 12 of Stimulation
2013-08-28 Perforation
2013-08-28 Performed Stage 13 of Stimulation
2013-08-28 Performed Stage 14 of Stimulation
2013-08-29 Perforation
2013-08-29 Performed Stage 15 of Stimulation
2013-08-29 Performed Stage 16 of Stimulation
2013-08-29 Performed Stage 17 of Stimulation
2013-08-30 Perforation
2013-08-31 Perforation
2013-08-31 Performed Stage 18 of Stimulation
2013-08-31 Performed Stage 19 of Stimulation
2013-08-31 Performed Stage 20 of Stimulation
2013-09-01 Perforation
2013-09-01 Performed Stage 21 of Stimulation
2013-09-01 Performed Stage 22 of Stimulation
2013-09-01 Performed Stage 23 of Stimulation
2013-09-01 Performed Stage 24 of Stimulation
2013-09-02 Perforation
2013-09-02 Performed Stage 25 of Stimulation
2013-09-02 Performed Stage 26 of Stimulation
2013-09-02 Performed Stage 27 of Stimulation
2013-09-03 Perforation
2013-09-03 Performed Stage 28 of Stimulation
2013-09-03 Performed Stage 29 of Stimulation
2013-09-03 Performed Stage 30 of Stimulation
2013-09-03 Performed Stage 31 of Stimulation
2013-09-04 Perforation
2013-09-04 Performed Stage 32 of Stimulation
2013-09-04 Performed Stage 33 of Stimulation
2013-09-05 Perforation
2013-09-05 Performed Stage 34 of Stimulation
2013-09-05 Performed Stage 35 of Stimulation
2013-09-05 Performed Stage 36 of Stimulation
2013-09-06 Perforation
2013-09-06 Performed Stage 37 of Stimulation
2013-09-06 Performed Stage 38 of Stimulation
2013-09-06 Performed Stage 39 of Stimulation
2013-09-07 Perforation
2013-09-07 Performed Stage 40 of Stimulation
2013-09-07 Performed Stage 41 of Stimulation
2013-09-08 Perforation
2013-09-08 Performed Stage 42 of Stimulation
2013-09-08 Performed Stage 43 of Stimulation
2013-09-08 Performed Stage 44 of Stimulation
2013-09-09 Perforation
2013-09-09 Performed Stage 45 of Stimulation
2013-09-09 Performed Stage 46 of Stimulation
2013-09-10 Perforation
2013-09-10 Performed Stage 47 of Stimulation
2013-09-10 Performed Stage 48 of Stimulation
2013-09-10 Performed Stage 49 of Stimulation
2013-09-10 Performed Stage 50 of Stimulation
2013-09-10 Performed Stage 51 of Stimulation
2013-09-11 Perforation
2013-09-11 Performed Stage 52 of Stimulation
2013-09-11 Performed Stage 53 of Stimulation
2016-05-17 Deviated
2016-05-17 Newly Drilled

For data sources see[4]

Fracking Activities

Fracking Jobs

Job Number Job Start Date Job End Date True Vertical Depth (ft) Total Water Volume (gal) Total Non-Water Volume (gal)
1 2013-08-23 2013-09-11 7,411 13,019,400 0

Fluid Composition Data

Job Number Trade Name Supplier Purpose Ingredient Name CAS Number Additive Percentage by Mass Job Percentage by Mass Mass Used (lb)
1 Water Customer & CWS Base Fluid & Mix Water Water 7732-18-5 100 90.167 108,659,000.0
Sand (Proppant), DAP-903, DWP-111,
DWP-614, DWP-901, BioClear
2000, DWP-NE1, Spearhead Acid
CWS Propping Agent, Scale Inhibitor, Gel Slurry, Viscosifier, Breaker, Biocide, Non-Emulsifier, Clean Perforations Dimethylcocoamine, bis(chloroethyl)
ether, diquaternary ammonium salt
68607-28-3 40 0.00984 11862.5
Modified thiourea polymer 68527-49-1 0.1 0.00342 4125.11
2-Propenoic acid, polymer with sodium phosphonate 71050-62-9 60 0.00666 8027.44
Isopropanol 67-63-0 40 0.00984 11862.5
Guar gum 9000-30-0 60 0.02849 34335.2
Ammonium Persulfate 7727-54-0 100 0.0007 841
Oxirane, 2-methyl-, polymer with oxirane, monodecyl ether 37251-67-5 1.5 0.00071 858.38
Distillates (petroleum), hydrotreated middle 64742-46-7 60 0.05418 65287.6
2,2-Dibromo-3-Nitrilopropionamide 10222-01-2 20 0.01306 15739.9
Calcite 471-34-1 1 0.01098 13234.9
Propargyl Alcohol 107-19-7 0.1 0.00114 1375.04
Goethite 1310-14-1 0.1 0.00517 6234.13
2-Propenoic acid, polymer with 2-propenamide, sodium salt 25987-30-8 40 0.03425 41270
Illite 12173-60-3 1 0.00973 11727.3
Diallyldimethylammonium chloride 7398-69-8 5 0.00123 1482.81
Sodium chloride 7647-14-5 0.1 0.00011 137.5
Methanol 67-56-1 15 0.01054 12698.7
Alcohols, C14-15, ethoxylated 68951-67-7 0.1 0.00342 4125.11
Formaldehyde 50-00-0 0.1 0.00023 275.01
Alkenes, C>10 a- 64743-02-8 0.1 0.00342 4125.11
Quaternary ammonium compounds,
bis(hydrogenated tallow alkyl)dimethyl,
salts with bentonite
68953-58-2 5 0.00237 2861.26
Crystalline silica (Quartz) 14808-60-7 100 8.78782 10,590,100.0
Ilmenite 98072-94-7 0.1 0.0036 4343.43
Sorbitan monooleate 1338-43-8 5 0.00428 5158.75
Biotite 1302-27-8 0.1 0.00413 4973.67
Apatite 64476-38-6 0.1 0.00413 4973.67
Hydrochloric acid 7647-01-0 35 0.79872 962526
Poly(oxyethylene)nonylphenol ether 9016-45-9 5 0.00428 5158.75
Fatty acids, tall-oil 61790-12-3 0.1 0.00342 4125.11
Polyethylene glycol mixture 25322-68-3 70 0.01306 15739.9

For data sources see[5]

Stimulation Data

Stimulation Date Phase Number Chemical Agent Volume (gal) Treating Pressure (psi) Breakdown Pressure (psi)
2013-08-23 1 NATURAL SAND 7,444,669 8,472 9,015
2013-08-23 2 NATURAL SAND 7,444,669 8,515 8,805
2013-08-24 3 NATURAL SAND 7,444,669 8,446 8,939
2013-08-25 4 NATURAL SAND 7,444,669 8,298 8,953
2013-08-25 5 NATURAL SAND 7,444,669 8,476 8,781
2013-08-25 6 NATURAL SAND 7,444,669 8,513 9,037
2013-08-26 7 NATURAL SAND 7,444,669 8,404 8,920
2013-08-26 8 NATURAL SAND 7,444,669 8,249 8,582
2013-08-26 9 NATURAL SAND 7,444,669 8,642 9,013
2013-08-27 10 NATURAL SAND 7,444,669 8,297 9,039
2013-08-27 11 NATURAL SAND 7,444,669 8,225 9,046
2013-08-27 12 NATURAL SAND 7,444,669 8,352 8,841
2013-08-28 13 NATURAL SAND 7,444,669 7,918 8,875
2013-08-28 14 NATURAL SAND 7,444,669 7,932 9,050
2013-08-29 15 NATURAL SAND 7,444,669 8,550 9,021
2013-08-29 16 NATURAL SAND 7,444,669 8,165 8,941
2013-08-29 17 NATURAL SAND 7,444,669 8,198 8,879
2013-08-31 18 NATURAL SAND 7,444,669 8,545 9,002
2013-08-31 19 NATURAL SAND 7,444,669 8,209 8,753
2013-08-31 20 NATURAL SAND 7,444,669 8,181 8,898
2013-09-01 21 NATURAL SAND 7,444,669 8,522 9,039
2013-09-01 22 NATURAL SAND 7,444,669 8,190 8,898
2013-09-01 23 NATURAL SAND 7,444,669 8,117 8,788
2013-09-01 24 NATURAL SAND 7,444,669 8,350 8,705
2013-09-02 25 NATURAL SAND 7,444,669 8,382 8,908
2013-09-02 26 NATURAL SAND 7,444,669 8,415 8,929
2013-09-02 27 NATURAL SAND 7,444,669 8,502 8,714
2013-09-03 28 NATURAL SAND 7,444,669 8,283 8,663
2013-09-03 29 NATURAL SAND 7,444,669 8,385 8,882
2013-09-03 30 NATURAL SAND 7,444,669 8,454 8,728
2013-09-03 31 NATURAL SAND 7,444,669 8,415 9,040
2013-09-04 32 NATURAL SAND 7,444,669 8,146 8,676
2013-09-04 33 NATURAL SAND 7,444,669 8,505 9,016
2013-09-05 34 NATURAL SAND 7,444,669 8,416 8,975
2013-09-05 35 NATURAL SAND 7,444,669 8,238 8,833
2013-09-05 36 NATURAL SAND 7,444,669 8,027 9,039
2013-09-06 37 NATURAL SAND 7,444,669 8,070 9,017
2013-09-06 38 NATURAL SAND 7,444,669 88,499 8,770
2013-09-06 39 NATURAL SAND 7,444,669 8,315 8,564
2013-09-07 40 NATURAL SAND 7,444,669 8,282 8,894
2013-09-07 41 NATURAL SAND 7,444,669 8,052 8,663
2013-09-08 42 NATURAL SAND 7,444,669 8,309 8,673
2013-09-08 43 NATURAL SAND 7,444,669 8,395 8,694
2013-09-08 44 NATURAL SAND 7,444,669 8,324 8,589
2013-09-09 45 NATURAL SAND 7,444,669 8,377 8,799
2013-09-09 46 NATURAL SAND 7,444,669 8,453 8,637
2013-09-10 47 NATURAL SAND 7,444,669 7,924 8,718
2013-09-10 48 NATURAL SAND 7,444,669 8,418 8,566
2013-09-10 49 NATURAL SAND 7,444,669 8,330 8,579
2013-09-10 50 NATURAL SAND 7,444,669 7,953 8,783
2013-09-10 51 NATURAL SAND 7,444,669 7,953 8,808
2013-09-11 52 NATURAL SAND 7,444,669 7,935 8,857
2013-09-11 53 NATURAL SAND 7,444,669 8,452 8,762

For data sources see[6]

Production Data

Period Operator Name Gas Quantity (mcf) Gas Production Days Oil Quantity (bbl) Oil Production Days Water Quantity (bbl) Water Production Days
2011 CNX GAS CO LLC 0.00 0 0.00 0 0.00 0
2012 CNX GAS CO LLC 0.00 0 0.00 0 0.00 0
2013 CNX GAS CO LLC 572,817.90 59 0.00 0 0.00 0
2014 CNX GAS CO LLC 1,930,165.73 365 0.00 0 0.00 0
2015 CNX GAS CO LLC 1,147,536.81 365 0.00 0 0.00 0
2016 CNX GAS CO LLC 665,533.75 295 0.00 0 0.00 0
2017 CNX GAS CO LLC 1,084,568.00 361 0.00 0 0.00 0
2018 CNX GAS CO LLC 832,740.44 363 0.00 0 0.00 0
2019 CNX GAS CO LLC 644,679.91 342 0.00 0 0.00 0

For data sources see[7]

Waste Data

Period Operator Waste Type Quantity Disposal Method Waste Facility ID
2012 CNX GAS CO LLC Drill Cuttings 21.33 Tons LANDFILL 100592
2012 CNX GAS CO LLC Drill Cuttings 1,397.37 Tons LANDFILL 100172
2013 CNX GAS CO LLC Produced Fluid 3,555.94 Bbl REUSE OTHER THAN ROAD SPREADING
2013 CNX GAS CO LLC Produced Fluid 102.28 Bbl INJECTION DISPOSAL WELL 34-013-20609
2013 CNX GAS CO LLC Produced Fluid 72.73 Bbl INJECTION DISPOSAL WELL 34-031-27177
2013 CNX GAS CO LLC Produced Fluid 3.78 Bbl INJECTION DISPOSAL WELL 34-119-28776
2013 CNX GAS CO LLC Produced Fluid 39.87 Bbl INJECTION DISPOSAL WELL 34-059-24202
2013 CNX GAS CO LLC Produced Fluid 274.70 Bbl INJECTION DISPOSAL WELL 34-105-23619
2014 CNX GAS CO LLC Produced Fluid 227.88 Bbl INJECTION DISPOSAL WELL 34-059-24202
2014 CNX GAS CO LLC Fracing Fluid Waste 0.02 Bbl LANDFILL 100172
2014 CNX GAS CO LLC Produced Fluid 503.73 Bbl STORAGE PENDING DISPOSAL OR REUSE
2014 CNX GAS CO LLC Produced Fluid 71.96 Bbl INJECTION DISPOSAL WELL 34-121-23995
2014 CNX GAS CO LLC Produced Fluid 275.85 Bbl INJECTION DISPOSAL WELL 34-013-20609
2014 CNX GAS CO LLC Produced Fluid 59.97 Bbl INJECTION DISPOSAL WELL 34-119-28776
2014 CNX GAS CO LLC Produced Fluid 59.97 Bbl INJECTION DISPOSAL WELL 2D0859721
2014 CNX GAS CO LLC Produced Fluid 4,101.65 Bbl REUSE OTHER THAN ROAD SPREADING
2015 CNX GAS CO LLC Produced Fluid 4,293.76 Bbl REUSE OTHER THAN ROAD SPREADING
2016 CNX GAS CO LLC Produced Fluid 26.00 Bbl INJECTION DISPOSAL WELL 34-119-28780
2016 CNX GAS CO LLC Produced Fluid 375.88 Bbl INJECTION DISPOSAL WELL 34-157-25511
2016 CNX GAS CO LLC Produced Fluid 393.00 Bbl INJECTION DISPOSAL WELL 34-119-28803
2016 CNX GAS CO LLC Produced Fluid 289.00 Bbl INJECTION DISPOSAL WELL 34-013-20609
2016 CNX GAS CO LLC Produced Fluid 7,268.79 Bbl REUSE OTHER THAN ROAD SPREADING
2017 CNX GAS CO LLC Produced Fluid 187.22 Bbl SURFACE IMPOUNDMENT 95-7-37312-16
2017 CNX GAS CO LLC Produced Fluid 1,723.14 Bbl SURFACE IMPOUNDMENT 95-7-37312-10
2017 CNX GAS CO LLC Produced Fluid 366.30 Bbl SURFACE IMPOUNDMENT 95-7-37312-17
2017 CNX GAS CO LLC Produced Fluid 175.26 Bbl INJECTION DISPOSAL WELL 34-013-20609
2017 CNX GAS CO LLC Produced Fluid 700.13 Bbl REUSE (AT WELL PAD)
2017 CNX GAS CO LLC Produced Fluid 529.11 Bbl SURFACE IMPOUNDMENT 95-7-37312-19
2017 CNX GAS CO LLC Produced Fluid 465.54 Bbl INJECTION DISPOSAL WELL 34-119-28803
2017 CNX GAS CO LLC Produced Fluid 457.78 Bbl SURFACE IMPOUNDMENT 95-7-37312-21
2017 CNX GAS CO LLC Produced Fluid 82.50 Bbl SURFACE IMPOUNDMENT 95-7-37312-32
2018 CNX GAS CO LLC Produced Fluid 21.00 Bbl INJECTION DISPOSAL WELL 34-119-28780
2018 CNX GAS CO LLC Produced Fluid 116.25 Bbl SURFACE IMPOUNDMENT 95-7-37312-17
2018 CNX GAS CO LLC Produced Fluid 1,650.52 Bbl SURFACE IMPOUNDMENT 95-7-37312-19
2018 CNX GAS CO LLC Produced Fluid 371.25 Bbl REUSE (AT WELL PAD)
2018 CNX GAS CO LLC Other Oil & Gas Wastes 12.50 Bbl SURFACE IMPOUNDMENT 95-7-37312-21
2018 CNX GAS CO LLC Produced Fluid 10.00 Bbl REUSE AT A WELL PAD OUTSIDE PENNSYLVANIA
2018 CNX GAS CO LLC Produced Fluid 151.11 Bbl SURFACE IMPOUNDMENT 95-7-37312-21
2018 CNX GAS CO LLC Other Oil & Gas Wastes 49.88 Bbl SURFACE IMPOUNDMENT 95-7-37312-19
2018 CNX GAS CO LLC Produced Fluid 516.87 Bbl INJECTION DISPOSAL WELL 34-119-28803
2019 CNX GAS CO LLC Produced Fluid 662.23 Bbl SURFACE IMPOUNDMENT 95-7-37312-19
2019 CNX GAS CO LLC Produced Fluid 31.91 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123SW019
2019 CNX GAS CO LLC Produced Fluid 13.75 Bbl INJECTION DISPOSAL WELL 34-157-25511
2019 CNX GAS CO LLC Produced Fluid 590.63 Bbl REUSE AT A WELL PAD OUTSIDE PENNSYLVANIA
2019 CNX GAS CO LLC Other Oil & Gas Wastes 13.75 Bbl SURFACE IMPOUNDMENT 95-7-37312-19
2019 CNX GAS CO LLC Produced Fluid 165.00 Bbl SURFACE IMPOUNDMENT 95-7-37312-21
2019 CNX GAS CO LLC Produced Fluid 37.50 Bbl SURFACE IMPOUNDMENT 95-7-37312-17
2019 CNX GAS CO LLC Produced Fluid 6.44 Bbl INJECTION DISPOSAL WELL 34-119-28803
2019 CNX GAS CO LLC Produced Fluid 68.75 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123SW005
2019 CNX GAS CO LLC Produced Fluid 288.75 Bbl REUSE (AT WELL PAD)

For data sources see[8]

Inspection Data

Inspections Performed

Inspection ID Inspection Category Inspection Date Inspection Type Inspection Result Inspection Comments
2042533 Primary Facility 2012-02-14 Complaint Inspection No Violations Noted Site construction underway.
2067218 Primary Facility 2012-05-11 Drilling/Alteration No Violations Noted
2090934 Primary Facility 2012-08-08 Drilling/Alteration No Violations Noted
2108616 Primary Facility 2012-10-17 Complaint Inspection No Violations Noted 8 vertical sections drilled.
2465706 Primary Facility 2016-03-18 Administrative/File Review In Compliance with Policy On Monday, March 14, 2016, an estimated 20 gallons of engine coolant was released from a ruptured radiator hose and was promptly reported to the Department. The release was completely contained within the designed engineering controls and no impacts to soil or water had occurred. The containment was cleaned of released fluids with absorbent pads and the expended pads were containerized and sealed for off-site disposal. The matter has been determined to be In Compliance with Policy. No violations are being cited at this time.
2479539 Primary Facility 2016-04-28 Incident- Response to Accident or Event In Compliance with Policy While performing a blow down operation on a well, a small amount of brine was released from a pressure relief valve on the associated production tank, due to a sudden influx of pressure in the tank. The release was contained and cleaned up.

The incident has been determined to be In Compliance with Policy (ICP). No violations are being cited at this time.

For data sources see[9]

References