If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 37-125-24920 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":40.077358,"lon":-80.062958,"icon":""}]} |
Country: United States | |
State: Pennsylvania | |
County: Washington | |
Municipality: North Bethlehem Township | |
Operator Name: RICE DRILLING B LLC | |
Well Pad ID: 146838 | |
Farm/Lease Name: ZORRO 7H | |
License Status: | |
Spud Date: | |
Permit Date: 2012-12-07 | |
Well Type: GAS | |
Unconventional Well: Y | |
Configuration: Horizontal Well | |
Conservation: No | |
Latitude: 40.077358 | |
Longitude: -80.062958 |
Date | Event |
---|---|
2012-12-07 | New Permit Application |
2013-04-22 | Performed Spud Operation |
2013-08-15 | Drilling Completion |
2013-10-26 | Perforation |
2013-10-27 | Drilling Completion |
2013-10-27 | Performed Stimulation |
2013-12-04 | New Permit Application |
2014-01-22 | DEVIATED |
2014-01-22 | NEWLY DRILLED |
For data sources see[4]
Job Number | Job Start Date | Job End Date | True Vertical Depth (ft) | Total Water Volume (gal) | Total Non-Water Volume (gal) |
---|---|---|---|---|---|
1 | 2013-10-22 | 2013-10-26 | 7,860 | 7,846,610 |
Job Number | Trade Name | Supplier | Purpose | Ingredient Name | CAS Number | Additive Percentage by Mass | Job Percentage by Mass | Mass Used (lb) |
---|---|---|---|---|---|---|---|---|
1 | CS-500 | ICI | Scale Inhibitor | Ethylene Glycol | 107-21-1 | 0.0027 | 10 | 0 |
FRW-300 | FTS | Friction Reducer | Ammonium Persulfate | 7727-54-0 | 0.0001 | 95 | 0 | |
Water | Rice | Base Fluid | Water | 7732-18-5 | 95.4659 | 100 | 0 | |
FRW-600 | FTS | Friction Reducer | Anionic Polyacrylamide | 25085-02-03 | 0.009 | 90 | 0 | |
Acid | FTS | Acidizing for perf cleanup | Hydrochloric Acid | 007647-01-0 | 0.0426 | 15 | 0 | |
ICI-3240 | ICI | Bactericide | Sodium Hydroxide | 1310-73-2 | 0.0011 | 4 | 0 | |
Dazomet | 533-74-4 | 0.0065 | 24 | 0 | ||||
FE 100L | ICI | Iron Control | Citric Acid | 77-92-9 | 0.0005 | 55 | 0 | |
CI-150L | ICI | Corrosion Inhibitor | Dimethylformamide | 68-12-2 | 0.0001 | 10 | 0 | |
Organic Amine Resin Salt | Proprietary | 0.0001 | 10 | 0 | ||||
Isopropanol | 67-63-0 | 0.0003 | 30 | 0 | ||||
Sand | Vertex | Proppant | Silica Sand | 14808-60-7 | 5.2817 | 100 | 0 |
For data sources see[5]
Stimulation Date | Phase Number | Chemical Agent | Volume (gal) | Treating Pressure (psi) | Breakdown Pressure (psi) |
---|---|---|---|---|---|
2013-10-27 | 0 | 0 | 0 |
For data sources see[6]
Period | Operator Name | Gas Quantity (mcf) | Gas Production Days | Oil Quantity (bbl) | Oil Production Days | Water Quantity (bbl) | Water Production Days |
---|---|---|---|---|---|---|---|
2013 | RICE DRILLING B LLC | 318,799.00 | 40 | 0.00 | 0 | 0.00 | 0 |
2014 | RICE DRILLING B LLC | 2,563,928.00 | 358 | 0.00 | 0 | 0.00 | 0 |
2015 | RICE DRILLING B LLC | 1,174,100.00 | 297 | 0.00 | 0 | 0.00 | 0 |
2016 | RICE DRILLING B LLC | 1,016,321.36 | 313 | 0.00 | 0 | 0.00 | 0 |
2017 | RICE DRILLING B LLC | 813,228.66 | 315 | 0.00 | 0 | 0.00 | 0 |
2018 | RICE DRILLING B LLC | 456,824.00 | 256 | 0.00 | 0 | 0.00 | 0 |
2019 | RICE DRILLING B LLC | 958,644.00 | 234 | 0.00 | 0 | 0.00 | 0 |
For data sources see[7]
Period | Operator | Waste Type | Quantity | Disposal Method | Waste Facility ID |
---|---|---|---|---|---|
2013 | RICE DRILLING B LLC | Produced Fluid | 8,769.00 Bbl | REUSE OTHER THAN ROAD SPREADING | |
2013 | RICE DRILLING B LLC | Drill Cuttings | 724.60 Tons | RESIDUAL WASTE TRANSFER FACILITY | 301071 |
2013 | RICE DRILLING B LLC | Drill Cuttings | 1,245.44 Tons | LANDFILL | 100172 |
2014 | RICE DRILLING B LLC | Produced Fluid | 27.50 Bbl | RESIDUAL WASTE PROC FAC (GENERAL PERMIT) | WMGR123SW010 |
2014 | RICE DRILLING B LLC | Produced Fluid | 215.50 Bbl | CENT WASTE TRT FAC NPDES DISCHARGE | PA0254185 |
2014 | RICE DRILLING B LLC | Produced Fluid | 215.50 Bbl | CENT WASTE TRT FAC NPDES | PA0254185 |
2014 | RICE DRILLING B LLC | Produced Fluid | 57.50 Bbl | INJECTION DISPOSAL WELL | 34-157-25511 |
2015 | RICE DRILLING B LLC | Fracing Fluid Waste | 13.75 Bbl | RESIDUAL WASTE PROC FAC (GENERAL PERMIT) | WMGR123SW005 |
2015 | RICE DRILLING B LLC | Fracing Fluid Waste | 671.88 Bbl | REUSE OTHER THAN ROAD SPREADING | |
2015 | RICE DRILLING B LLC | Produced Fluid | 8,883.38 Bbl | RESIDUAL WASTE PROC FAC (GENERAL PERMIT) | WMGR123SW005 |
2015 | RICE DRILLING B LLC | Fracturing Fluid Waste | 4.25 Tons | LANDFILL | 100592 |
2015 | RICE DRILLING B LLC | Produced Fluid | 23,593.26 Bbl | REUSE OTHER THAN ROAD SPREADING | |
2016 | RICE DRILLING B LLC | Other Oil & Gas Wastes | 263.89 Bbl | REUSE OTHER THAN ROAD SPREADING | |
2016 | RICE DRILLING B LLC | Other Oil & Gas Wastes | 8.75 Bbl | RESIDUAL WASTE PROCESSING FACILITY | WMGR123SW019 |
2016 | RICE DRILLING B LLC | Fracturing Fluid Waste | 13.75 Bbl | REUSE OTHER THAN ROAD SPREADING | |
2016 | RICE DRILLING B LLC | Produced Fluid | 184.57 Bbl | RESIDUAL WASTE PROCESSING FACILITY | WMGR123SW019 |
2016 | RICE DRILLING B LLC | Other Oil & Gas Wastes | 38.52 Bbl | RESIDUAL WASTE PROCESSING FACILITY | WMGR123SW005 |
2016 | RICE DRILLING B LLC | Produced Fluid | 408.75 Bbl | RESIDUAL WASTE PROC FAC (GENERAL PERMIT) | WMGR123SW010 |
2016 | RICE DRILLING B LLC | Produced Fluid | 6,489.92 Bbl | REUSE OTHER THAN ROAD SPREADING | |
2016 | RICE DRILLING B LLC | Produced Fluid | 295.55 Bbl | CENTRALIZED TREATMENT PLANT FOR RECYCLE | WMGR123SW019 |
2016 | RICE DRILLING B LLC | Filter Socks | 0.01 Tons | RESIDUAL WASTE PROCESSING FACILITY | 301280 |
2016 | RICE DRILLING B LLC | Waste Water Treatment Sludge | 1.96 Tons | RESIDUAL WASTE PROCESSING FACILITY | 2014-541 |
2016 | RICE DRILLING B LLC | Produced Fluid | 208.64 Bbl | RESIDUAL WASTE PROCESSING FACILITY | WMGR123SW005 |
2016 | RICE DRILLING B LLC | Produced Fluid | 317.25 Bbl | RESIDUAL WASTE PROC FAC (GENERAL PERMIT) | WMGR123SW005 |
2017 | RICE DRILLING B LLC | Other Oil & Gas Wastes | 57.41 Bbl | REUSE (AT WELL PAD) | |
2017 | RICE DRILLING B LLC | Other Oil & Gas Wastes | 58.74 Bbl | RESIDUAL WASTE PROCESSING FACILITY | WMGR123SW005 |
2017 | RICE DRILLING B LLC | Waste Water Treatment Sludge | 0.35 Tons | RESIDUAL WASTE TRANSFER FACILITY | 101532 |
2017 | RICE DRILLING B LLC | Produced Fluid | 13.76 Bbl | REUSE AT A WELL PAD OUTSIDE PENNSYLVANIA | |
2017 | RICE DRILLING B LLC | Produced Fluid | 627.56 Bbl | RESIDUAL WASTE PROCESSING FACILITY | WMGR123SW005 |
2017 | RICE DRILLING B LLC | Produced Fluid | 796.11 Bbl | REUSE (AT WELL PAD) | |
2018 | RICE DRILLING B LLC | Produced Fluid | 167.22 Bbl | RESIDUAL WASTE PROCESSING FACILITY | WMGR123SW005 |
2018 | RICE DRILLING B LLC | Produced Fluid | 2.67 Bbl | REUSE AT A WELL PAD OUTSIDE PENNSYLVANIA | |
2018 | RICE DRILLING B LLC | Soil Contaminated by Oil | 15.04 Tons | RESIDUAL WASTE PROCESSING FACILITY | 2014-541 |
2018 | RICE DRILLING B LLC | Other Oil & Gas Wastes | 164.39 Bbl | REUSE (AT WELL PAD) | |
2018 | RICE DRILLING B LLC | Other Oil & Gas Wastes | 76.25 Bbl | RESIDUAL WASTE PROCESSING FACILITY | WMGR123SW005 |
2018 | RICE DRILLING B LLC | Soil Contaminated by Oil & Gas Related Spills | 15.04 Tons | RESIDUAL WASTE PROCESSING FACILITY | 2014-541 |
2018 | RICE DRILLING B LLC | Produced Fluid | 217.91 Bbl | REUSE (AT WELL PAD) | |
2018 | RICE DRILLING B LLC | Other Oil & Gas Wastes | 23.75 Bbl | REUSE AT A WELL PAD OUTSIDE PENNSYLVANIA | |
2019 | RICE DRILLING B LLC | Other Oil & Gas Wastes | 22.50 Bbl | RESIDUAL WASTE PROCESSING FACILITY | WMGR123SW005 |
2019 | RICE DRILLING B LLC | Produced Fluid | 9.04 Bbl | SURFACE IMPOUNDMENT | 95-7-37312-19 |
2019 | RICE DRILLING B LLC | Produced Fluid | 18.59 Bbl | RESIDUAL WASTE PROCESSING FACILITY | WMGR123SW010 |
2019 | RICE DRILLING B LLC | Other Oil & Gas Wastes | 423.97 Bbl | REUSE (AT WELL PAD) | |
2019 | RICE DRILLING B LLC | Produced Fluid | 7.40 Bbl | RESIDUAL WASTE PROCESSING FACILITY | WMGR123SW005 |
2019 | RICE DRILLING B LLC | Produced Fluid | 325.21 Bbl | REUSE (AT WELL PAD) |
For data sources see[8]
Inspection ID | Inspection Category | Inspection Date | Inspection Type | Inspection Result | Inspection Comments |
---|---|---|---|---|---|
2183246 | Primary Facility | 2013-07-11 | Routine/Complete Inspection | No Violations Noted | |
2184973 | Primary Facility | 2013-07-17 | Drilling/Alteration | No Violations Noted | |
2196437 | Primary Facility | 2013-08-12 | Drilling/Alteration | No Violations Noted | |
2400948 | Primary Facility | 2015-08-21 | Complaint Inspection | No Violations Noted | 6 wells drilled and equipped for production. 2 additional cellars onsite. several upright and trailer tanks on location. |
2474068 | Primary Facility | 2016-03-21 | Routine/Complete Inspection | No Violations Noted | Well is operating and properly identified. Well is equipped with a production unit. Six 400 barrel production tanks on site. Production tanks are located in a diked area. Diked area contains no standing water. |
2493061 | Primary Facility | 2016-05-27 | Incident- Response to Accident or Event | In Compliance with Policy | On Friday May 27, 2016, I received notification of a spill that had occurred earlier in the day at the Zorro Well Site located in North Bethlehem Township, Washington County.
A dehydration unit was being flushed to remove glycol residue. Two waste tanks were staged on the well pad, each within containment, to collect and dispose of the spent fluid. Approximately 30 gallons of the freshwater, glycol and degreaser mixture was spilled to containment. It was estimated that at least half of the fluid had impacted the well pad due to a number of small breaches in the containment. Moody and Associates, Inc. were retained by Rice to complete the delineation and remediation work. Results from the confirmatory samples collected following site remediation will be forwarded to the Department upon receipt. The release was confined to a relatively small area of the pad, the vertical and horizontal extent of impact was defined and the area remediated. There were no impacts to off-site receptors or Waters of the Com |
2682444 | Primary Facility | 2018-01-10 | Routine/Complete Inspection | No Violations Noted | Today I conducted a routine inspection at the Zorro well pad and the following was observed.
Proper signs were displayed identifying the site. The site was stabilized with thick vegetation no erosion observed outside of the LOD. The well heads were maintained, no leaks or fluids around well head. The production tanks were in good condition no leaks , rust or defects observed. Secondary containment for the site was intact and maintained. |
2714415 | Primary Facility | 2018-04-04 | Routine/Complete Inspection | No Violations Noted | This well has been completed and is producing. Well site and equipment appears to be well maintained. |
For data sources see[9]