X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

37-125-27065

Well Details

Well ID: 37-125-27065
Loading map...
Country: United States
State: Pennsylvania
County: Washington
Municipality: Amwell Township
Operator Name: EQT PROD CO
Well Pad ID: 145547
Farm/Lease Name: GALLAGHER 592058
License Status: Active
Spud Date: 2013-08-02
Permit Date: 2013-08-09
Well Type: GAS
Unconventional Well: Y
Configuration: Horizontal Well
Conservation: No
Latitude: 40.010747
Longitude: -80.217142

For data sources see[1][2][3]

Well History

Date Event
2013-08-09 New Permit Application
2013-08-15 Performed Spud Operation
2013-11-06 Drilling Completion
2013-12-13 Performed Stage 1 of Stimulation
2013-12-14 Perforation
2013-12-14 Performed Stage 1 of Stimulation
2013-12-14 Performed Stage 2 of Stimulation
2013-12-14 Performed Stage 3 of Stimulation
2013-12-14 Performed Stage 4 of Stimulation
2013-12-15 Perforation
2013-12-15 Performed Stage 5 of Stimulation
2013-12-15 Performed Stage 6 of Stimulation
2013-12-15 Performed Stage 7 of Stimulation
2013-12-15 Performed Stage 8 of Stimulation
2013-12-16 Perforation
2013-12-16 Performed Stage 10 of Stimulation
2013-12-16 Performed Stage 11 of Stimulation
2013-12-16 Performed Stage 9 of Stimulation
2013-12-17 Perforation
2013-12-17 Performed Stage 12 of Stimulation
2013-12-18 Perforation
2013-12-18 Performed Stage 13 of Stimulation
2013-12-18 Performed Stage 14 of Stimulation
2013-12-18 Performed Stage 15 of Stimulation
2013-12-18 Performed Stage 16 of Stimulation
2016-12-16 Perforation
2018-06-04 Deviated

For data sources see[4]

Fracking Activities

Fracking Jobs

Job Number Job Start Date Job End Date True Vertical Depth (ft) Total Water Volume (gal) Total Non-Water Volume (gal)
1 2013-12-14 2013-12-19 7,540 8,057,160 379,181

Fluid Composition Data

Job Number Trade Name Supplier Purpose Ingredient Name CAS Number Additive Percentage by Mass Job Percentage by Mass Mass Used (lb)
1 LGC-36 Halliburton Adds viscosity to fluid Naptha, hydrotreated heavy 67742-48-9 30 0.00001000 0
Guar Gum 9000-30-0 30 0.00001000 0
SP Breaker Halliburton Reduces viscosity of the fluid Sodium Persulfate 7775-27-1 100 0.00004000 0
BA-40L Halliburton Adjusts pH of the fluid Potassium carbonate 584-08-7 60 0.00465 0
Sand Halliburton Proppant Crystalline Silica 14808-60-7 100 10.6219 0
MX-5 Halliburton Eliminates bacteria in water sources Sodium Nitrate 7631-99-4 60 0.05752 0
FR-66 Halliburton Reduces friction between pipe and fluid fluidHydrotreated light petroleum
distillate (non-diesel, BTEX free)
64742-47-8 30 0.02483 0
HAI-OS Halliburton Protects casing Methanol 67-56-1 10 0.00002000 0
Propargyl Alcohol 107-19-7 60 0.00011 0
LP-65 Halliburton Prevents scale deposits Ammonium Chloride 12125-02-9 10 0.00252 0
Water Halliburton Carrier Water 7732-18-5 100 89.1481 0
28% HCl Halliburton Dissolves cement & minerals in perforations Hydrochloric Acid 7647-01-0 28 0.01514 0

For data sources see[5]

Stimulation Data

Stimulation Date Phase Number Chemical Agent Volume (gal) Treating Pressure (psi) Breakdown Pressure (psi)
2013-12-13 1 3,755,934 8,823 9,823
2013-12-14 2 Sand 3,755,934 8,503 8,724
2013-12-14 3 Sand 3,755,934 8,088 8,877
2013-12-14 4 Sand 3,755,934 8,435 9,251
2013-12-15 5 Sand 3,755,934 8,203 9,251
2013-12-15 6 Sand 3,755,934 8,604 8,949
2013-12-15 7 Sand 3,755,934 8,723 9,072
2013-12-15 8 Sand 3,755,934 8,579 8,857
2013-12-16 9 Sand 3,755,934 8,103 9,082
2013-12-16 10 Sand 3,755,934 8,114 8,425
2013-12-16 11 Sand 3,755,934 7,984 8,511
2013-12-17 12 Sand 3,755,934 8,190 9,541
2013-12-18 13 Sand 3,755,934 7,845 8,131
2013-12-18 14 Sand 3,755,934 7,776 8,101
2013-12-18 15 Sand 3,755,934 7,733 7,884
2013-12-18 16 Sand 3,755,934 7,836 8,704

For data sources see[6]

Production Data

Period Operator Name Gas Quantity (mcf) Gas Production Days Oil Quantity (bbl) Oil Production Days Water Quantity (bbl) Water Production Days
2013 EQT PROD CO 0.00 0 0.00 0 0.00 0
2014 EQT PROD CO 1,227,716.00 215 0.00 0 0.00 0
2015 EQT PROD CO 1,912,594.00 364 0.00 0 0.00 0
2016 EQT PROD CO 1,062,586.00 366 0.00 0 0.00 0
2017 EQT PROD CO 822,085.00 365 0.00 0 0.00 0
2018 EQT PROD CO 657,515.00 365 0.00 0 0.00 0
2019 EQT PROD CO 472,258.00 364 0.00 0 0.00 0

For data sources see[7]

Waste Data

Period Operator Waste Type Quantity Disposal Method Waste Facility ID
2013 EQT PROD CO Drilling Fluid Waste 5,175.00 Bbl REUSE OTHER THAN ROAD SPREADING
2013 EQT PROD CO Fracing Fluid Waste 4,465.00 Bbl REUSE OTHER THAN ROAD SPREADING
2014 EQT PROD CO Produced Fluid 456.00 Bbl INJECTION DISPOSAL WELL 34-059-24202
2014 EQT PROD CO Fracing Fluid Waste 5,327.00 Bbl REUSE OTHER THAN ROAD SPREADING
2014 EQT PROD CO Produced Fluid 2,192.00 Bbl INJECTION DISPOSAL WELL 34-157-25511
2014 EQT PROD CO Produced Fluid 24,320.00 Bbl REUSE OTHER THAN ROAD SPREADING
2014 EQT PROD CO Fracturing Fluid Waste 36.66 Tons LANDFILL SWF 1032-WV0109
2014 EQT PROD CO Produced Fluid 110.00 Bbl INJECTION DISPOSAL WELL 34-083-24137
2014 EQT PROD CO Produced Fluid 3,394.00 Bbl INJECTION DISPOSAL WELL 34-031-27177
2014 EQT PROD CO Fracturing Fluid Waste 18.36 Tons LANDFILL 100419
2015 EQT PROD CO Produced Fluid 540.00 Bbl INJECTION DISPOSAL WELL 34-157-25511
2015 EQT PROD CO Produced Fluid 100.00 Bbl INJECTION DISPOSAL WELL 34-031-27177
2015 EQT PROD CO Produced Fluid 110.00 Bbl RESIDUAL WASTE PROC FAC (GENERAL PERMIT) WMGR123SW005
2015 EQT PROD CO Produced Fluid 11,472.00 Bbl REUSE OTHER THAN ROAD SPREADING
2015 EQT PROD CO Produced Fluid 400.00 Bbl INJECTION DISPOSAL WELL 34-059-24202
2016 EQT PROD CO Produced Fluid 165.00 Bbl RESIDUAL WASTE PROC FAC (GENERAL PERMIT) WMGR123SW005
2016 EQT PROD CO Produced Fluid 220.00 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123SW005
2016 EQT PROD CO Produced Fluid 11,734.00 Bbl REUSE OTHER THAN ROAD SPREADING
2017 EQT PROD CO Other Oil & Gas Wastes 110.00 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123SW005
2017 EQT PROD CO Produced Fluid 437.65 Bbl RESIDUAL WASTE PROCESSING FACILITY
2017 EQT PROD CO Produced Fluid 2,978.70 Bbl REUSE (AT WELL PAD)
2017 EQT PROD CO Produced Fluid 315.00 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123SW005
2018 EQT PROD CO Other Oil & Gas Wastes 31.27 Bbl REUSE (AT WELL PAD)
2018 EQT PROD CO Produced Fluid 545.34 Bbl REUSE (AT WELL PAD)
2018 EQT PROD CO Produced Fluid 160.05 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123SW005
2018 EQT PROD CO Produced Fluid 11.08 Bbl INJECTION DISPOSAL WELL 34-009-23823
2019 EQT PROD CO Produced Fluid 10.31 Bbl SURFACE IMPOUNDMENT 95-7-37312-19
2019 EQT PROD CO Other Oil & Gas Wastes 6.88 Bbl REUSE AT A WELL PAD OUTSIDE PENNSYLVANIA
2019 EQT PROD CO Produced Fluid 20.91 Bbl REUSE AT A WELL PAD OUTSIDE PENNSYLVANIA
2019 EQT PROD CO Other Oil & Gas Wastes 6.88 Bbl INJECTION DISPOSAL WELL 34-105-23619
2019 EQT PROD CO Other Oil & Gas Wastes 191.54 Bbl REUSE (AT WELL PAD)
2019 EQT PROD CO Other Oil & Gas Wastes 6.88 Bbl INJECTION DISPOSAL WELL 34-167-29543
2019 EQT PROD CO Produced Fluid 569.97 Bbl REUSE (AT WELL PAD)
2019 EQT PROD CO Produced Fluid 73.18 Bbl INJECTION DISPOSAL WELL 34-105-23619
2019 EQT PROD CO Produced Fluid 26.27 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123SW010

For data sources see[8]

Inspection Data

Inspections Performed

Inspection ID Inspection Category Inspection Date Inspection Type Inspection Result Inspection Comments
2199738 Primary Facility 2013-08-01 Routine/Complete Inspection No Violations Noted On August 1, 2013 I stopped at EQT’s Gallagher site for a perimeter BMP inspection; I met with Rex Nelson the Construction Supervisor.
2201559 Primary Facility 2013-09-04 Drilling/Alteration No Violations Noted
2286977 Primary Facility 2014-05-19 Routine/Complete Inspection No Violations Noted
2562949 Primary Facility 2017-02-10 Routine/Complete Inspection No Violations Noted Routine/complete inspection

For data sources see[9]

References