X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

37-125-27071

Well Details

Well ID: 37-125-27071
Loading map...
Country: United States
State: Pennsylvania
County: Washington
Municipality: East Finley Township
Operator Name: HG ENERGY II APPALACHIA LLC
Well Pad ID: 149891
Farm/Lease Name: CONSOL
License Status: Active
Spud Date: 2014-03-23
Permit Date: 2013-11-05
Well Type: GAS
Unconventional Well: Y
Configuration: Horizontal Well
Conservation: No
Latitude: 40.074517
Longitude: -80.346478

For data sources see[1][2][3]

Well History

Date Event
2013-11-05 New Permit Application
2013-11-12 Performed Spud Operation
2014-03-24 New Permit Application

For data sources see[4]

Fracking Activities

Fracking Jobs

Job Number Job Start Date Job End Date True Vertical Depth (ft) Total Water Volume (gal) Total Non-Water Volume (gal)
1 2015-03-04 2015-03-12 7,192 7,499,210 0

Fluid Composition Data

Job Number Trade Name Supplier Purpose Ingredient Name CAS Number Additive Percentage by Mass Job Percentage by Mass Mass Used (lb)
1 Water Customer & CWS Base Fluid & Mix Water Water 7732-18-5 100 87.1836 62,596,400.0
Sand (Proppant), DAP-903, DWP-614,
BioClear 2000, DWP-NE1, Spearhead Acid
CWS Propping Agent, Scale Inhibitor, Viscosifier, Biocide, Non-Emulsifier, Clean Perforations Poly(oxyethylene)nonylphenol ether 9016-45-9 5 0.00501 3597.81
Crystalline silica (Quartz) 14808-60-7 100 12.4928 8,969,620.0
Fatty acids, tall-oil 61790-12-3 0.1 0.00049 355.39
Formaldehyde 50-00-0 0.1 0.00003000 23.69
Hydrochloric acid 7647-01-0 35 0.1155 82925.3
Modified thiourea polymer 68527-49-1 0.1 0.00049 355.39
Biotite 1302-27-8 0.1 0.00577 4144.93
2,2-Dibromo-3-Nitrilopropionamide 10222-01-2 20 0.0131 9405.69
Goethite 1310-14-1 0.1 0.00728 5227.97
Distillates (petroleum), hydrotreated middle 64742-46-7 30 0.03007 21586.9
Diallyldimethylammonium chloride 7398-69-8 5 0.00192 1378.85
2-Propenoic acid, polymer with 2-propenamide, sodium salt 25987-30-8 40 0.04009 28782.5
Illite 12173-60-3 1 0.01355 9729.18
2-Propenoic acid, polymer with sodium phosphonate 71050-62-9 60 0.0069 4956.86
Alcohols, C14-15, ethoxylated 68951-67-7 0.1 0.00049 355.39
Dimethylcocoamine, bis(chloroethyl)
ether, diquaternary ammonium salt
68607-28-3 40 0.01536 11030.8
Isopropanol 67-63-0 40 0.01536 11030.8
Apatite 64476-38-6 0.1 0.00577 4144.93
Polyethylene glycol mixture 25322-68-3 70 0.0131 9405.69
Sorbitan monooleate 1338-43-8 5 0.00501 3597.81
Sodium chloride 7647-14-5 0.1 0.00002000 11.85
Propargyl Alcohol 107-19-7 0.1 0.00016 118.46
Alkenes, C>10 a- 64743-02-8 0.1 0.00049 355.39
Calcite 471-34-1 1 0.01584 11372
Methanol 67-56-1 15 0.00675 4847.34
Ilmenite 98072-94-7 0.1 0.00502 3603.4

For data sources see[5]

Production Data

Period Operator Name Gas Quantity (mcf) Gas Production Days Oil Quantity (bbl) Oil Production Days Water Quantity (bbl) Water Production Days
2013 CNX GAS CO LLC 0.00 0 0.00 0 0.00 0
2014 CNX GAS CO LLC 0.00 0 0.00 0 0.00 0
2015 CNX GAS CO LLC 963,288.52 245 0.00 0 653.26 153
2016 NOBLE ENERGY INC 1,834,372.95 345 0.00 0 1,611.13 347
2017 HG ENERGY II APPALACHIA LLC 1,424,797.25 365 0.00 0 1,210.35 335
2018 HG ENERGY II APPALACHIA LLC 1,182,273.00 365 0.00 0 8.48 212
2019 HG ENERGY II APPALACHIA LLC 990,876.00 365 0.00 0 60.00 212

For data sources see[6]

Waste Data

Period Operator Waste Type Quantity Disposal Method Waste Facility ID
2013 CNX GAS CO LLC Drilling Fluid Waste 22.57 Bbl RESIDUAL WASTE TRANSFER FACILITY 301071
2014 CNX GAS CO LLC Drill Cuttings 208.67 Tons LANDFILL PAD059087072
2014 CNX GAS CO LLC Drilling Fluid Waste 881.72 Bbl RESIDUAL WASTE TRANSFER FACILITY 301071
2014 CNX GAS CO LLC Drilling Fluid Waste 108.70 Bbl LANDFILL 06-08438
2014 CNX GAS CO LLC Drilling Fluid Waste 222.00 Bbl REUSE OTHER THAN ROAD SPREADING
2014 CNX GAS CO LLC Drill Cuttings 327.58 Tons RESIDUAL WASTE TRANSFER FACILITY 301071
2014 CNX GAS CO LLC Drilling Fluid Waste 267.07 Bbl LANDFILL PAD059087072
2015 CNX GAS CO LLC Fracturing Fluid Waste 35.45 Tons LANDFILL 100172
2015 CNX GAS CO LLC Fracing Fluid Waste 13,412.75 Bbl REUSE OTHER THAN ROAD SPREADING
2015 CNX GAS CO LLC Produced Fluid 15,912.93 Bbl REUSE OTHER THAN ROAD SPREADING
2016 CNX GAS CO LLC Produced Fluid 144.00 Bbl INJECTION DISPOSAL WELL 34-157-25511
2016 CNX GAS CO LLC Produced Fluid 138.17 Bbl INJECTION DISPOSAL WELL 34-119-28780
2016 CNX GAS CO LLC Produced Fluid 828.50 Bbl INJECTION DISPOSAL WELL 34-119-28803
2016 CNX GAS CO LLC Produced Fluid 711.74 Bbl INJECTION DISPOSAL WELL 34-013-20609
2016 CNX GAS CO LLC Produced Fluid 18,485.79 Bbl REUSE OTHER THAN ROAD SPREADING
2017 NOBLE ENERGY INC Produced Fluid 6,126.96 Bbl REUSE AT A WELL PAD OUTSIDE PENNSYLVANIA
2017 NOBLE ENERGY INC Produced Fluid 182.74 Bbl REUSE OTHER THAN ROAD SPREADING
2017 NOBLE ENERGY INC Produced Fluid 2,585.00 Bbl INJECTION DISPOSAL WELL 34-119-28803
2018 HG ENERGY II APPALACHIA LLC Produced Fluid 1,676.00 Bbl INJECTION DISPOSAL WELL 34-119-28803
2018 HG ENERGY II APPALACHIA LLC Produced Fluid 1,939.00 Bbl REUSE AT A WELL PAD OUTSIDE PENNSYLVANIA
2019 HG ENERGY II APPALACHIA LLC Produced Fluid 2,929.00 Bbl SURFACE IMPOUNDMENT 95-7-37312-19
2019 HG ENERGY II APPALACHIA LLC Produced Fluid 3,136.00 Bbl INJECTION DISPOSAL WELL 34-119-28803
2019 HG ENERGY II APPALACHIA LLC Produced Fluid 282.00 Bbl REUSE AT A WELL PAD OUTSIDE PENNSYLVANIA

For data sources see[7]

Inspection Data

Inspections Performed

Inspection ID Inspection Category Inspection Date Inspection Type Inspection Result Inspection Comments
2235529 Primary Facility 2014-01-06 Drilling/Alteration No Violations Noted
2291478 Primary Facility 2014-07-31 Drilling/Alteration No Violations Noted Patterson Rig 324
2312130 Primary Facility 2014-10-10 Routine/Complete Inspection No Violations Noted
2317276 Primary Facility 2014-06-04 Routine/Complete Inspection No Violations Noted Temporary minor modification to access road for rig entry.
2339149 Primary Facility 2015-01-23 Drilling/Alteration No Violations Noted On site fracing job in progress. Followed up on third party call about excess traffic on Twp roads. Discussed better traffic control with Completions engineer and WSM. (Marcellus Shale).
2406848 Primary Facility 2015-05-07 Routine/Complete Inspection No Violations Noted Well has been drilled, hydraulically fractured, and is in flow back operations.
2584790 Primary Facility 2017-04-11 Routine/Complete Inspection No Violations Noted On 4/11/2017, the Department performed an inspection of the Noble Energy, NV60 site. The site is located in East Finley, Twp., Washington Co. The inspection was a routine inspection of the site post restoration and before termination of the ESCGP2 permit.

The site was recently transferred from CNX to Noble Energy. CNX had applied for a restoration extension for the site which has expired. CNX had restored the site and installed PCSM structures (Infiltration Berms). The PCSM structures are not functioning and are failing causing accelerated erosion. Several areas, recently restored on the well pad and well pad slopes have poor vegetative cover. Kim Walker (Noble Energy) was contacted and she stated that Noble is discussing reconstructing the PCSM structured or possibly modifying the approved ESCGP2 permit for the installation of different PCSM structures. Noble plans to revisit the site in the near future to address the deficiencies.

9 wells have been drilled to completion, are in good condition,and are

2631112 Primary Facility 2017-07-26 Routine/Complete Inspection No Violations Noted On July 26, 2017, the Department performed an inspection of the HG Energy NV60 well pad site. Present at time of inspection was Jared Stemple (HG). The site is located in East Finley Twp., Washington County. The inspection was related to a request by the operator to meet on site to discuss start rehabilitation of the PCSM structures and interim restoration of the site.

The operator has contracted with Burns Construction to rehabilitate the failing infiltration berms on the northeast corner of the site. ARM group will be overseeing the construction activity in the field for the operator.

9 wells have been drilled to completion and are equipped for production.

2643098 Primary Facility 2017-09-07 Routine/Complete Inspection No Violations Noted Today I conducted a routine inspection at the NV60HS well pad and the following was observed.

Proper signs were displayed identifying the site. The site was stabilized with thick vegetation no erosion observed outside of the LOD. The well heads were maintained, no leaks or fluids around well head. The production tanks were in good condition no leaks , rust or defects observed. Secondary containment for the site was intact and maintained.

2651207 Primary Facility 2017-10-04 Site Restoration No Violations Noted On October 4, 2017, the Department performed an inspection of the Noble/HG Energy NV60 well pad. The site is located in East Finley Twp., Washington Co. The inspection was related a well restoration report for the wells drilled on site by CNX prior to the sale of the site to Noble and then HG.

The well pad access road and well pad are in good condition.

The site has been restored and PCSMs (Infiltration berms) have been installed. The two infiltration berms on the northeast corner of the well pad are not functioning and have failed. The well pad has been reduced in size and vegetated. HG Energy has met with the Department and discussed repair of the infiltration berms.

9 wells have been drilled to completion and are equipped for production on site. The GPUs on site are not in secondary containment. The operator will need to place the GPUs into containment in the future.

For data sources see[8]

References