If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 37-125-27081 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":40.074597,"lon":-80.346744,"icon":""}]} |
Country: United States | |
State: Pennsylvania | |
County: Washington | |
Municipality: East Finley Township | |
Operator Name: HG ENERGY II APPALACHIA LLC | |
Well Pad ID: 149891 | |
Farm/Lease Name: CONSOL | |
License Status: | |
Spud Date: 2013-11-06 | |
Permit Date: 2013-09-04 | |
Well Type: GAS | |
Unconventional Well: Y | |
Configuration: Horizontal Well | |
Conservation: No | |
Latitude: 40.074597 | |
Longitude: -80.346744 |
Date | Event |
---|---|
2013-09-04 | New Permit Application |
2013-11-02 | Performed Spud Operation |
2014-03-24 | New Permit Application |
For data sources see[4]
Job Number | Job Start Date | Job End Date | True Vertical Depth (ft) | Total Water Volume (gal) | Total Non-Water Volume (gal) |
---|---|---|---|---|---|
1 | 2014-01-29 | 2015-02-12 | 7,200 | 10,531,400 | 0 |
Job Number | Trade Name | Supplier | Purpose | Ingredient Name | CAS Number | Additive Percentage by Mass | Job Percentage by Mass | Mass Used (lb) |
---|---|---|---|---|---|---|---|---|
1 | Water | Customer & CWS | Base Fluid & Mix Water | Water | 7732-18-5 | 100 | 88.9053 | 87,901,400.0 |
Sand (Proppant), DAP-903, DWP-111, DWP-614, DWP-901, BioClear 2000, DWP-NE1, Spearhead Acid |
CWS | Propping Agent, Scale Inhibitor, Gel Slurry, Viscosifier, Breaker, Biocide, Non-Emulsifier, Clean Perforations | 2-Propenoic acid, polymer with sodium phosphonate | 71050-62-9 | 60 | 0.00683 | 6757 | |
Poly(oxyethylene)nonylphenol ether | 9016-45-9 | 5 | 0.00477 | 4713.89 | ||||
Modified thiourea polymer | 68527-49-1 | 0.1 | 0.0008 | 793.29 | ||||
Illite | 12173-60-3 | 1 | 0.00934 | 9230.9 | ||||
Diallyldimethylammonium chloride | 7398-69-8 | 5 | 0.0017 | 1685.1 | ||||
Crystalline silica (Quartz) | 14808-60-7 | 100 | 10.7112 | 10,590,300.0 | ||||
Ammonium Persulfate | 7727-54-0 | 100 | 0.00002000 | 22 | ||||
Hydrochloric acid | 7647-01-0 | 35 | 0.18722 | 185101 | ||||
Polyethylene glycol mixture | 25322-68-3 | 70 | 0.01313 | 12983.9 | ||||
Calcite | 471-34-1 | 1 | 0.01534 | 15168.2 | ||||
Isopropanol | 67-63-0 | 40 | 0.01363 | 13480.8 | ||||
Calcium chloride | 10043-52-4 | 100 | 0.00531 | 5250 | ||||
Guar gum | 9000-30-0 | 60 | 0.00007000 | 68.56 | ||||
2,2-Dibromo-3-Nitrilopropionamide | 10222-01-2 | 20 | 0.01313 | 12983.9 | ||||
Biotite | 1302-27-8 | 0.1 | 0.00419 | 4141.15 | ||||
Methanol | 67-56-1 | 15 | 0.00672 | 6641.87 | ||||
Fatty acids, tall-oil | 61790-12-3 | 0.1 | 0.0008 | 793.29 | ||||
Oxirane, 2-methyl-, polymer with oxirane, monodecyl ether | 37251-67-5 | 1.5 | 0 | 1.71 | ||||
Sodium chloride | 7647-14-5 | 0.1 | 0.00003000 | 26.44 | ||||
Apatite | 64476-38-6 | 0.1 | 0.00419 | 4141.15 | ||||
Dimethylcocoamine, bis(chloroethyl) ether, diquaternary ammonium salt |
68607-28-3 | 40 | 0.01363 | 13480.8 | ||||
Formaldehyde | 50-00-0 | 0.1 | 0.00005000 | 52.89 | ||||
2-Propenoic acid, polymer with 2-propenamide, sodium salt | 25987-30-8 | 40 | 0.03814 | 37711.1 | ||||
Sorbitan monooleate | 1338-43-8 | 5 | 0.00477 | 4713.89 | ||||
Propargyl Alcohol | 107-19-7 | 0.1 | 0.00027 | 264.43 | ||||
Goethite | 1310-14-1 | 0.1 | 0.00565 | 5585.74 | ||||
Distillates (petroleum), hydrotreated middle | 64742-46-7 | 60 | 0.02868 | 28351.9 | ||||
Alkenes, C>10 a- | 64743-02-8 | 0.1 | 0.0008 | 793.29 | ||||
Ilmenite | 98072-94-7 | 0.1 | 0.00346 | 3418.85 | ||||
Alcohols, C14-15, ethoxylated | 68951-67-7 | 0.1 | 0.0008 | 793.29 | ||||
Quaternary ammonium compounds, bis(hydrogenated tallow alkyl)dimethyl, salts with bentonite |
68953-58-2 | 5 | 0.00001000 | 5.71 |
For data sources see[5]
Period | Operator Name | Gas Quantity (mcf) | Gas Production Days | Oil Quantity (bbl) | Oil Production Days | Water Quantity (bbl) | Water Production Days |
---|---|---|---|---|---|---|---|
2013 | CNX GAS CO LLC | 0.00 | 0 | 0.00 | 0 | 0.00 | 0 |
2014 | CNX GAS CO LLC | 0.00 | 0 | 0.00 | 0 | 0.00 | 0 |
2015 | CNX GAS CO LLC | 1,011,842.17 | 245 | 0.00 | 0 | 1,410.85 | 153 |
2016 | NOBLE ENERGY INC | 2,104,149.79 | 345 | 0.00 | 0 | 1,653.04 | 347 |
2017 | HG ENERGY II APPALACHIA LLC | 1,517,038.64 | 365 | 0.00 | 0 | 212.00 | 213 |
2018 | HG ENERGY II APPALACHIA LLC | 1,260,868.00 | 365 | 0.00 | 0 | 2.31 | 89 |
2019 | HG ENERGY II APPALACHIA LLC | 1,027,554.00 | 365 | 0.00 | 0 | 54.00 | 120 |
For data sources see[6]
Period | Operator | Waste Type | Quantity | Disposal Method | Waste Facility ID |
---|---|---|---|---|---|
2013 | CNX GAS CO LLC | Drill Cuttings | 6.21 Tons | RESIDUAL WASTE TRANSFER FACILITY | 301071 |
2014 | CNX GAS CO LLC | Drill Cuttings | 621.33 Tons | LANDFILL | PAD059087072 |
2014 | CNX GAS CO LLC | Drilling Fluid Waste | 0.77 Bbl | RESIDUAL WASTE TRANSFER FACILITY | 301071 |
2014 | CNX GAS CO LLC | Drilling Fluid Waste | 222.00 Bbl | REUSE OTHER THAN ROAD SPREADING | |
2014 | CNX GAS CO LLC | Drilling Fluid Waste | 782.44 Bbl | LANDFILL | 301071 |
2014 | CNX GAS CO LLC | Drilling Fluid Waste | 244.75 Bbl | LANDFILL | PAD059087072 |
2014 | CNX GAS CO LLC | Drill Cuttings | 390.98 Tons | RESIDUAL WASTE TRANSFER FACILITY | 301071 |
2015 | CNX GAS CO LLC | Fracturing Fluid Waste | 35.45 Tons | LANDFILL | 100172 |
2015 | CNX GAS CO LLC | Fracing Fluid Waste | 13,412.75 Bbl | REUSE OTHER THAN ROAD SPREADING | |
2015 | CNX GAS CO LLC | Produced Fluid | 15,912.93 Bbl | REUSE OTHER THAN ROAD SPREADING | |
2016 | CNX GAS CO LLC | Produced Fluid | 144.00 Bbl | INJECTION DISPOSAL WELL | 34-157-25511 |
2016 | CNX GAS CO LLC | Produced Fluid | 138.17 Bbl | INJECTION DISPOSAL WELL | 34-119-28780 |
2016 | CNX GAS CO LLC | Produced Fluid | 828.50 Bbl | INJECTION DISPOSAL WELL | 34-119-28803 |
2016 | CNX GAS CO LLC | Produced Fluid | 711.74 Bbl | INJECTION DISPOSAL WELL | 34-013-20609 |
2016 | CNX GAS CO LLC | Produced Fluid | 17,782.37 Bbl | REUSE OTHER THAN ROAD SPREADING | |
2017 | NOBLE ENERGY INC | Produced Fluid | 5,037.45 Bbl | REUSE AT A WELL PAD OUTSIDE PENNSYLVANIA | |
2017 | NOBLE ENERGY INC | Produced Fluid | 39.46 Bbl | REUSE OTHER THAN ROAD SPREADING | |
2017 | NOBLE ENERGY INC | Produced Fluid | 3,291.00 Bbl | INJECTION DISPOSAL WELL | 34-119-28803 |
2018 | HG ENERGY II APPALACHIA LLC | Produced Fluid | 953.00 Bbl | REUSE AT A WELL PAD OUTSIDE PENNSYLVANIA | |
2019 | HG ENERGY II APPALACHIA LLC | Produced Fluid | 3,006.00 Bbl | SURFACE IMPOUNDMENT | 95-7-37312-19 |
2019 | HG ENERGY II APPALACHIA LLC | Produced Fluid | 2,392.00 Bbl | INJECTION DISPOSAL WELL | 34-119-28803 |
2019 | HG ENERGY II APPALACHIA LLC | Produced Fluid | 762.00 Bbl | REUSE AT A WELL PAD OUTSIDE PENNSYLVANIA |
For data sources see[7]
Inspection ID | Inspection Category | Inspection Date | Inspection Type | Inspection Result | Inspection Comments |
---|---|---|---|---|---|
2235646 | Primary Facility | 2013-01-06 | Drilling/Alteration | No Violations Noted | |
2243999 | Primary Facility | 2014-02-05 | Drilling/Alteration | No Violations Noted | |
2244018 | Primary Facility | 2014-02-06 | Drilling/Alteration | No Violations Noted | Yost drilling for CNX using closed loop system and flare stack. On 2/5/2014 a call came in at 10:10pm that Allied was having trouble with the cement job. Pumped 200bbls or fresh water and 35bbls of gel, then 10bbls of fresh water. Next they started pumpling cement. At 95bbls of cement pumped, the pressure spiked to 2500psi while pumping at 4.5 bbls/min. Decided to bleed off pressure and try again. Pumpled 1.4 to 1.5 bbls/min. and pressure began to build again. CNX terminated cement job. 02/06/2014 CNX decided to grout casing to surface.using a 1" pour string. On 2/7/2014, 84bbls of cement was pumped throught pour string and got 1bbl to returns. |
2312140 | Primary Facility | 2014-10-10 | Routine/Complete Inspection | No Violations Noted | |
2317283 | Primary Facility | 2014-06-04 | Routine/Complete Inspection | No Violations Noted | Temporary minor modification to access road for rig entry. |
2339171 | Primary Facility | 2015-01-23 | Drilling/Alteration | No Violations Noted | On site fracing job in progress. Followed up on third party call about excess traffic on Twp roads. Discussed better traffic control with Completions engineer and WSM. (Marcellus Shale). |
2406843 | Primary Facility | 2015-05-07 | Routine/Complete Inspection | No Violations Noted | Well has been drilled, hydraulically fractured, and is in flow back operations. |
2584798 | Primary Facility | 2017-04-11 | Routine/Complete Inspection | No Violations Noted | On 4/11/2017, the Department performed an inspection of the Noble Energy, NV60 site. The site is located in East Finley, Twp., Washington Co. The inspection was a routine inspection of the site post restoration and before termination of the ESCGP2 permit.
The site was recently transferred from CNX to Noble Energy. CNX had applied for a restoration extension for the site which has expired. CNX had restored the site and installed PCSM structures (Infiltration Berms). The PCSM structures are not functioning and are failing causing accelerated erosion. Several areas, recently restored on the well pad and well pad slopes have poor vegetative cover. Kim Walker (Noble Energy) was contacted and she stated that Noble is discussing reconstructing the PCSM structured or possibly modifying the approved ESCGP2 permit for the installation of different PCSM structures. Noble plans to revisit the site in the near future to address the deficiencies. 9 wells have been drilled to completion, are in good condition,and are |
2631128 | Primary Facility | 2017-07-26 | Routine/Complete Inspection | No Violations Noted | On July 26, 2017, the Department performed an inspection of the HG Energy NV60 well pad site. Present at time of inspection was Jared Stemple (HG). The site is located in East Finley Twp., Washington County. The inspection was related to a request by the operator to meet on site to discuss start rehabilitation of the PCSM structures and interim restoration of the site.
The operator has contracted with Burns Construction to rehabilitate the failing infiltration berms on the northeast corner of the site. ARM group will be overseeing the construction activity in the field for the operator. 9 wells have been drilled to completion and are equipped for production. |
2643112 | Primary Facility | 2017-09-07 | Routine/Complete Inspection | No Violations Noted | Today I conducted a routine inspection at the NV60HS well pad and the following was observed.
Proper signs were displayed identifying the site. The site was stabilized with thick vegetation no erosion observed outside of the LOD. The well heads were maintained, no leaks or fluids around well head. The production tanks were in good condition no leaks , rust or defects observed. Secondary containment for the site was intact and maintained. |
2651223 | Primary Facility | 2017-10-04 | Site Restoration | No Violations Noted | On October 4, 2017, the Department performed an inspection of the Noble/HG Energy NV60 well pad. The site is located in East Finley Twp., Washington Co. The inspection was related a well restoration report for the wells drilled on site by CNX prior to the sale of the site to Noble and then HG.
The well pad access road and well pad are in good condition. The site has been restored and PCSMs (Infiltration berms) have been installed. The two infiltration berms on the northeast corner of the well pad are not functioning and have failed. The well pad has been reduced in size and vegetated. HG Energy has met with the Department and discussed repair of the infiltration berms. 9 wells have been drilled to completion and are equipped for production on site. The GPUs on site are not in secondary containment. The operator will need to place the GPUs into containment in the future. |
For data sources see[8]