If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 37-125-27229 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":40.116706,"lon":-80.074714,"icon":""}]} |
Country: United States | |
State: Pennsylvania | |
County: Washington | |
Municipality: Somerset Township | |
Operator Name: RICE DRILLING B LLC | |
Well Pad ID: 145010 | |
Farm/Lease Name: BIG DADDY SHAW | |
License Status: Active | |
Spud Date: 2014-01-15 | |
Permit Date: 2013-12-30 | |
Well Type: GAS | |
Unconventional Well: Y | |
Configuration: Horizontal Well | |
Conservation: Yes | |
Latitude: 40.116706 | |
Longitude: -80.074714 |
Date | Event |
---|---|
2013-12-30 | New Permit Application |
2014-01-13 | Performed Spud Operation |
2014-02-08 | Drilling Completion |
2014-04-19 | Drilling Completion |
2014-06-29 | Perforation |
2014-08-04 | Perforation |
2014-08-11 | Performed Stage 1 of Stimulation |
2014-08-12 | Perforation |
2014-08-12 | Performed Stage 2 of Stimulation |
2014-08-12 | Performed Stage 3 of Stimulation |
2014-08-12 | Performed Stage 4 of Stimulation |
2014-08-13 | Performed Stage 5 of Stimulation |
2014-08-25 | Perforation |
2014-08-25 | Performed Stage 6 of Stimulation |
2014-08-26 | Perforation |
2014-08-26 | Performed Stage 7 of Stimulation |
2014-08-27 | Perforation |
2014-08-27 | Performed Stage 10 of Stimulation |
2014-08-27 | Performed Stage 8 of Stimulation |
2014-08-27 | Performed Stage 9 of Stimulation |
2014-08-28 | Perforation |
2014-08-28 | Performed Stage 11 of Stimulation |
2014-08-28 | Performed Stage 12 of Stimulation |
2014-08-29 | Perforation |
2014-08-29 | Performed Stage 13 of Stimulation |
2014-08-29 | Performed Stage 14 of Stimulation |
2014-08-29 | Performed Stage 15 of Stimulation |
2014-08-29 | Performed Stage 16 of Stimulation |
2014-08-29 | Performed Stage 17 of Stimulation |
2014-08-30 | Perforation |
2014-08-30 | Performed Stage 18 of Stimulation |
2014-08-30 | Performed Stage 19 of Stimulation |
2014-08-30 | Performed Stage 20 of Stimulation |
2014-08-31 | Perforation |
2014-08-31 | Performed Stage 21 of Stimulation |
2014-08-31 | Performed Stage 22 of Stimulation |
2014-08-31 | Performed Stage 23 of Stimulation |
2014-09-01 | Perforation |
2014-09-01 | Performed Stage 24 of Stimulation |
2014-09-03 | Perforation |
2014-09-03 | Performed Stage 25 of Stimulation |
2014-09-04 | Perforation |
2014-09-04 | Performed Stage 26 of Stimulation |
2014-09-05 | Perforation |
2014-09-05 | Performed Stage 27 of Stimulation |
2014-09-06 | Perforation |
2014-09-06 | Performed Stage 28 of Stimulation |
2014-09-07 | Perforation |
2014-09-07 | Performed Stage 29 of Stimulation |
2014-09-07 | Performed Stage 30 of Stimulation |
2014-09-07 | Performed Stage 31 of Stimulation |
2014-09-07 | Performed Stage 32 of Stimulation |
2014-09-08 | Perforation |
2014-09-08 | Performed Stage 33 of Stimulation |
2014-09-08 | Performed Stage 34 of Stimulation |
2014-09-27 | Perforation |
2014-09-27 | Performed Stage 35 of Stimulation |
2014-09-28 | Perforation |
2014-09-28 | Performed Stage 36 of Stimulation |
2014-09-28 | Performed Stage 37 of Stimulation |
2014-09-28 | Performed Stage 38 of Stimulation |
2014-09-28 | Performed Stage 39 of Stimulation |
2018-07-05 | Deviated |
2018-07-05 | Newly Drilled |
For data sources see[4]
Stimulation Date | Phase Number | Chemical Agent | Volume (gal) | Treating Pressure (psi) | Breakdown Pressure (psi) |
---|---|---|---|---|---|
2014-08-11 | 1 | Silica Sand | 62,823 | 8,682 | 8,919 |
2014-08-12 | 2 | Silica Sand | 62,823 | 8,787 | 9,024 |
2014-08-12 | 3 | Silica Sand | 62,823 | 8,551 | 9,049 |
2014-08-12 | 4 | Silica Sand | 62,823 | 8,674 | 9,046 |
2014-08-13 | 5 | Silica Sand | 62,823 | 8,679 | 8,714 |
2014-08-25 | 6 | Silica Sand | 62,823 | 8,923 | 9,268 |
2014-08-26 | 7 | Silica Sand | 62,823 | 8,872 | 9,358 |
2014-08-27 | 8 | Silica Sand | 62,823 | 9,015 | 9,261 |
2014-08-27 | 9 | Silica Sand | 62,823 | 8,760 | 9,200 |
2014-08-27 | 10 | Silica Sand | 62,823 | 8,809 | 9,213 |
2014-08-28 | 11 | Silica Sand | 62,823 | 8,460 | 9,427 |
2014-08-28 | 12 | Silica Sand | 62,823 | 8,353 | 8,824 |
2014-08-29 | 13 | Silica Sand | 62,823 | 8,759 | 9,090 |
2014-08-29 | 14 | Silica Sand | 62,823 | 8,418 | 9,309 |
2014-08-29 | 15 | Silica Sand | 62,823 | 8,465 | 9,333 |
2014-08-29 | 16 | Silica Sand | 62,823 | 8,388 | 8,918 |
2014-08-29 | 17 | Silica Sand | 62,823 | 8,427 | 9,280 |
2014-08-30 | 18 | Silica Sand | 62,823 | 8,720 | 9,020 |
2014-08-30 | 19 | Silica Sand | 62,823 | 8,548 | 8,936 |
2014-08-30 | 20 | Silica Sand | 62,823 | 8,222 | 8,421 |
2014-08-31 | 21 | Silica Sand | 62,823 | 8,439 | 8,953 |
2014-08-31 | 22 | Silica Sand | 62,823 | 8,587 | 9,011 |
2014-08-31 | 23 | Silica Sand | 62,823 | 8,487 | 9,499 |
2014-09-01 | 24 | Silica Sand | 62,823 | 8,151 | 8,978 |
2014-09-03 | 25 | Silica Sand | 62,823 | 8,275 | 8,651 |
2014-09-04 | 26 | Silica Sand | 62,823 | 8,275 | 8,985 |
2014-09-05 | 27 | Silica Sand | 62,823 | 8,562 | 8,913 |
2014-09-06 | 28 | Silica Sand | 62,823 | 8,470 | 8,805 |
2014-09-07 | 29 | Silica Sand | 62,823 | 8,134 | 8,611 |
2014-09-07 | 30 | Silica Sand | 62,823 | 8,086 | 8,798 |
2014-09-07 | 31 | Silica Sand | 62,823 | 7,856 | 8,414 |
2014-09-07 | 32 | Silica Sand | 62,823 | 8,165 | 8,750 |
2014-09-08 | 33 | Silica Sand | 62,823 | 7,724 | 9,184 |
2014-09-08 | 34 | Silica Sand | 62,823 | 7,972 | 8,534 |
2014-09-27 | 35 | Silica Sand | 62,823 | 7,859 | 8,791 |
2014-09-28 | 36 | Silica Sand | 62,823 | 7,345 | 9,103 |
2014-09-28 | 37 | Silica Sand | 62,823 | 7,847 | 8,733 |
2014-09-28 | 38 | Silica Sand | 62,823 | 7,563 | 9,120 |
2014-09-28 | 39 | Silica Sand | 62,823 | 7,520 | 8,440 |
For data sources see[5]
Period | Operator Name | Gas Quantity (mcf) | Gas Production Days | Oil Quantity (bbl) | Oil Production Days | Water Quantity (bbl) | Water Production Days |
---|---|---|---|---|---|---|---|
2014 | RICE DRILLING B LLC | 765,577.00 | 70 | 0.00 | 0 | 0.00 | 0 |
2015 | RICE DRILLING B LLC | 2,215,467.00 | 364 | 0.00 | 0 | 0.00 | 0 |
2016 | RICE DRILLING B LLC | 931,675.48 | 337 | 0.00 | 0 | 0.00 | 0 |
2017 | RICE DRILLING B LLC | 755,587.11 | 332 | 0.00 | 0 | 0.00 | 0 |
2018 | RICE DRILLING B LLC | 616,591.00 | 365 | 0.00 | 0 | 0.00 | 0 |
2019 | RICE DRILLING B LLC | 612,567.00 | 363 | 0.00 | 0 | 0.00 | 0 |
For data sources see[6]
Period | Operator | Waste Type | Quantity | Disposal Method | Waste Facility ID |
---|---|---|---|---|---|
2014 | RICE DRILLING B LLC | Fracturing Fluid Waste | 37.82 Tons | LANDFILL | 100172 |
2014 | RICE DRILLING B LLC | Produced Fluid | 18.57 Bbl | RESIDUAL WASTE PROC FAC (GENERAL PERMIT) | WMGR123SW010 |
2014 | RICE DRILLING B LLC | Drill Cuttings | 94.28 Tons | LANDFILL | 100277 |
2014 | RICE DRILLING B LLC | Produced Fluid | 1,951.43 Bbl | INJECTION DISPOSAL WELL | 34-157-25511 |
2014 | RICE DRILLING B LLC | Produced Fluid | 6,986.29 Bbl | CENT WASTE TRT FAC NPDES | PA0254185 |
2014 | RICE DRILLING B LLC | Drill Cuttings | 630.53 Tons | LANDFILL | 100172 |
2014 | RICE DRILLING B LLC | Produced Fluid | 6,986.29 Bbl | CENT WASTE TRT FAC NPDES DISCHARGE | PA0254185 |
2015 | RICE DRILLING B LLC | Fracturing Fluid Waste | 2.85 Tons | LANDFILL | 100172 |
2015 | RICE DRILLING B LLC | Produced Fluid | 122.57 Bbl | INJECTION DISPOSAL WELL | 34-157-25511 |
2015 | RICE DRILLING B LLC | Drilling Fluid Waste | 68.05 Bbl | LANDFILL | 100592 |
2015 | RICE DRILLING B LLC | Produced Fluid | 157.14 Bbl | RESIDUAL WASTE PROC FAC (GENERAL PERMIT) | WMGR123SW010 |
2015 | RICE DRILLING B LLC | Fracturing Fluid Waste | 2.36 Tons | RESIDUAL WASTE PROCESSING FACILITY | 2014-541 |
2015 | RICE DRILLING B LLC | Produced Fluid | 15.71 Bbl | INJECTION DISPOSAL WELL | 34-013-20609 |
2015 | RICE DRILLING B LLC | Produced Fluid | 4,360.71 Bbl | RESIDUAL WASTE PROC FAC (GENERAL PERMIT) | WMGR123SW005 |
2015 | RICE DRILLING B LLC | Fracturing Fluid Waste | 2.00 Tons | INJECTION DISPOSAL WELL | 42-003-38495 |
2015 | RICE DRILLING B LLC | Fracturing Fluid Waste | 5.53 Tons | LANDFILL | 100592 |
2015 | RICE DRILLING B LLC | Produced Fluid | 12,327.76 Bbl | REUSE OTHER THAN ROAD SPREADING | |
2016 | RICE DRILLING B LLC | Other Oil & Gas Wastes | 9.14 Bbl | RESIDUAL WASTE PROCESSING FACILITY | WMGR123SW019 |
2016 | RICE DRILLING B LLC | Produced Fluid | 178.57 Bbl | RESIDUAL WASTE PROC FAC (GENERAL PERMIT) | WMGR123SW005 |
2016 | RICE DRILLING B LLC | Produced Fluid | 1.07 Bbl | RESIDUAL WASTE PROCESSING FACILITY | 2014-541 |
2016 | RICE DRILLING B LLC | Other Oil & Gas Wastes | 305.86 Bbl | REUSE OTHER THAN ROAD SPREADING | |
2016 | RICE DRILLING B LLC | Produced Fluid | 173.19 Bbl | RESIDUAL WASTE PROCESSING FACILITY | WMGR123SW019 |
2016 | RICE DRILLING B LLC | Filter Socks | 0.02 Tons | RESIDUAL WASTE PROCESSING FACILITY | 301280 |
2016 | RICE DRILLING B LLC | Waste Water Treatment Sludge | 2.88 Tons | RESIDUAL WASTE PROCESSING FACILITY | 2014-541 |
2016 | RICE DRILLING B LLC | Other Oil & Gas Wastes | 9.57 Bbl | RESIDUAL WASTE PROCESSING FACILITY | WMGR123SW005 |
2016 | RICE DRILLING B LLC | Produced Fluid | 496.44 Bbl | CENTRALIZED TREATMENT PLANT FOR RECYCLE | WMGR123SW019 |
2016 | RICE DRILLING B LLC | Produced Fluid | 123.60 Bbl | RESIDUAL WASTE PROCESSING FACILITY | WMGR123SW005 |
2016 | RICE DRILLING B LLC | Produced Fluid | 4,876.88 Bbl | REUSE OTHER THAN ROAD SPREADING | |
2017 | RICE DRILLING B LLC | Other Oil & Gas Wastes | 115.32 Bbl | REUSE (AT WELL PAD) | |
2017 | RICE DRILLING B LLC | Other Oil & Gas Wastes | 44.12 Bbl | RESIDUAL WASTE PROCESSING FACILITY | WMGR123SW005 |
2017 | RICE DRILLING B LLC | Other Oil & Gas Wastes | 15.71 Bbl | RESIDUAL WASTE PROCESSING FACILITY | WMGR123SW019 |
2017 | RICE DRILLING B LLC | Produced Fluid | 425.50 Bbl | RESIDUAL WASTE PROCESSING FACILITY | WMGR123SW005 |
2017 | RICE DRILLING B LLC | Filter Socks | 0.04 Tons | RESIDUAL WASTE PROCESSING FACILITY | 301280 |
2017 | RICE DRILLING B LLC | Produced Fluid | 609.88 Bbl | REUSE (AT WELL PAD) | |
2018 | RICE DRILLING B LLC | Other Oil & Gas Wastes | 38.56 Bbl | REUSE (AT WELL PAD) | |
2018 | RICE DRILLING B LLC | Produced Fluid | 354.75 Bbl | REUSE (AT WELL PAD) | |
2018 | RICE DRILLING B LLC | Other Oil & Gas Wastes | 12.86 Bbl | RESIDUAL WASTE PROCESSING FACILITY | WMGR123SW005 |
2018 | RICE DRILLING B LLC | Produced Fluid | 36.27 Bbl | REUSE AT A WELL PAD OUTSIDE PENNSYLVANIA | |
2018 | RICE DRILLING B LLC | Produced Fluid | 110.43 Bbl | RESIDUAL WASTE PROCESSING FACILITY | WMGR123SW005 |
2019 | RICE DRILLING B LLC | Produced Fluid | 675.32 Bbl | REUSE (AT WELL PAD) | |
2019 | RICE DRILLING B LLC | Other Oil & Gas Wastes | 43.69 Bbl | RESIDUAL WASTE PROCESSING FACILITY | WMGR123SW005 |
2019 | RICE DRILLING B LLC | Other Oil & Gas Wastes | 100.53 Bbl | REUSE (AT WELL PAD) |
For data sources see[7]
Inspection ID | Inspection Category | Inspection Date | Inspection Type | Inspection Result | Inspection Comments |
---|---|---|---|---|---|
2238545 | Primary Facility | 2014-01-15 | Drilling/Alteration | No Violations Noted | |
2255840 | Primary Facility | 2014-03-13 | Drilling/Alteration | No Violations Noted | |
2264310 | Primary Facility | 2014-04-16 | Drilling/Alteration | No Violations Noted | Patterson UTI drilling for Rice Energy using closed loop system and flare stack. Currently drilling ahead @8364ft. BOP tested good at nipple up. Containment under rig and support equipment in good condition. |
2768825 | Primary Facility | 2018-08-29 | Routine/Complete Inspection | No Violations Noted | Well appears to be maintained and producing. Water in cellar. |
2824369 | Primary Facility | 2019-01-09 | Routine/Complete Inspection | No Violations Noted | On 1/9/19 a routine complete inspection of the Big Daddy Shaw Well Pad was conducted in response to an operator request. The following was observed:
>>The operator representative reported plans to revisit the site to drill further wells. >>A minor modification to place a raised berm around the perimeter of the pad was requested and denied due to substantial changes in flow patterns around the pad necessitating engineer review. >>The site was in generally good condition with no noted violations or concerns. |
2837719 | Primary Facility | 2019-02-08 | Routine/Complete Inspection | No Violations Noted | Well appears to be well maintained and producing.
Cellar Tech/NOV auger rig on location to spud 7 new wells. |
2838443 | Primary Facility | 2019-02-07 | Routine/Complete Inspection | No Violations Noted | Well drilled and equipped for production. Well tag present. |
For data sources see[8]