X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

37-125-27257

Well Details

Well ID: 37-125-27257
Loading map...
Country: United States
State: Pennsylvania
County: Washington
Municipality: East Finley Township
Operator Name: HG ENERGY II APPALACHIA LLC
Well Pad ID: 149891
Farm/Lease Name: CONSOL NV60NHSB
License Status:
Spud Date:
Permit Date: 2013-12-20
Well Type: GAS
Unconventional Well: Y
Configuration: Horizontal Well
Conservation: No
Latitude: 40.074569
Longitude: -80.346453

For data sources see[1][2][3]

Well History

Date Event
2013-12-20 New Permit Application
2013-12-23 Performed Spud Operation
2014-03-12 New Permit Application
2014-04-19 Drilling Completion
2014-08-14 Drilling Completion
2014-12-29 Perforation
2015-01-11 Performed Stimulation
2016-06-30 DEVIATED
2016-06-30 NEWLY DRILLED

For data sources see[4]

Fracking Activities

Fracking Jobs

Job Number Job Start Date Job End Date True Vertical Depth (ft) Total Water Volume (gal) Total Non-Water Volume (gal)
1 2015-01-11 2015-01-25 6,956 8,867,160 0

Fluid Composition Data

Job Number Trade Name Supplier Purpose Ingredient Name CAS Number Additive Percentage by Mass Job Percentage by Mass Mass Used (lb)
1 Water Customer & CWS Base Fluid & Mix Water Water 7732-18-5 100 86.0768 74,008,400.0
Sand (Proppant), DAP-903, DWP-111,
DWP-614, DWP-901, BioClear
2000, DWP-NE1, Spearhead Acid
CWS Propping Agent, Scale Inhibitor, Gel Slurry, Viscosifier, Breaker, Biocide, Non-Emulsifier, Clean Perforations Sodium chloride 7647-14-5 0.1 0.00002000 21.37
Fatty acids, tall-oil 61790-12-3 0.1 0.00075 640.98
Alkenes, C>10 a- 64743-02-8 0.1 0.00075 640.98
Distillates (petroleum), hydrotreated middle 64742-46-7 60 0.03021 25975.6
Diallyldimethylammonium chloride 7398-69-8 5 0.00151 1298.91
Hydrochloric acid 7647-01-0 35 0.17395 149562
Alcohols, C14-15, ethoxylated 68951-67-7 0.1 0.00075 640.98
2,2-Dibromo-3-Nitrilopropionamide 10222-01-2 20 0.01338 11505
Biotite 1302-27-8 0.1 0.00626 5381.36
Apatite 64476-38-6 0.1 0.00626 5381.36
Propargyl Alcohol 107-19-7 0.1 0.00025 213.66
Quaternary ammonium compounds,
bis(hydrogenated tallow alkyl)dimethyl,
salts with bentonite
68953-58-2 5 0.00031 263.71
Polyethylene glycol mixture 25322-68-3 70 0.01338 11505
Calcite 471-34-1 1 0.01717 14764.5
Methanol 67-56-1 15 0.00602 5178.7
Sorbitan monooleate 1338-43-8 5 0.00442 3801.85
Illite 12173-60-3 1 0.01469 12631.4
Ilmenite 98072-94-7 0.1 0.00544 4678.29
Formaldehyde 50-00-0 0.1 0.00005000 42.73
Goethite 1310-14-1 0.1 0.00789 6787.51
Poly(oxyethylene)nonylphenol ether 9016-45-9 5 0.00442 3801.85
Oxirane, 2-methyl-, polymer with oxirane, monodecyl ether 37251-67-5 1.5 0.00009000 79.11
Modified thiourea polymer 68527-49-1 0.1 0.00075 640.98
Dimethylcocoamine, bis(chloroethyl)
ether, diquaternary ammonium salt
68607-28-3 40 0.01209 10391.3
2-Propenoic acid, polymer with 2-propenamide, sodium salt 25987-30-8 40 0.03537 30414.8
Isopropanol 67-63-0 40 0.01209 10391.3
Guar gum 9000-30-0 60 0.00368 3164.53
Ammonium Persulfate 7727-54-0 100 0.00012 105
2-Propenoic acid, polymer with sodium phosphonate 71050-62-9 60 0.00644 5533.94
Crystalline silica (Quartz) 14808-60-7 100 13.5447 11,645,600.0

For data sources see[5]

Stimulation Data

Stimulation Date Phase Number Chemical Agent Volume (gal) Treating Pressure (psi) Breakdown Pressure (psi)
2015-01-11 0 0 0

For data sources see[6]

Production Data

Period Operator Name Gas Quantity (mcf) Gas Production Days Oil Quantity (bbl) Oil Production Days Water Quantity (bbl) Water Production Days
2013 CNX GAS CO LLC 0.00 0 0.00 0 0.00 0
2014 CNX GAS CO LLC 0.00 0 0.00 0 0.00 0
2015 CNX GAS CO LLC 377,353.72 214 0.00 0 1,701.73 123
2016 NOBLE ENERGY INC 918,014.83 347 0.00 0 3,248.66 347
2017 HG ENERGY II APPALACHIA LLC 756,707.27 365 0.00 0 2,216.86 365
2018 HG ENERGY II APPALACHIA LLC 593,440.00 365 0.00 0 1,345.01 365
2019 HG ENERGY II APPALACHIA LLC 478,115.00 365 0.00 0 489.00 212

For data sources see[7]

Waste Data

Period Operator Waste Type Quantity Disposal Method Waste Facility ID
2013 CNX GAS CO LLC Drill Cuttings 48.17 Tons RESIDUAL WASTE TRANSFER FACILITY 301071
2014 CNX GAS CO LLC Drill Cuttings 258.56 Tons LANDFILL PAD059087072
2014 CNX GAS CO LLC Drilling Fluid Waste 222.00 Bbl REUSE OTHER THAN ROAD SPREADING
2014 CNX GAS CO LLC Drilling Fluid Waste 1,520.04 Bbl RESIDUAL WASTE TRANSFER FACILITY 301071
2014 CNX GAS CO LLC Drilling Fluid Waste 121.58 Bbl LANDFILL 06-08438
2014 CNX GAS CO LLC Drill Cuttings 153.36 Tons LANDFILL 06-08438
2015 CNX GAS CO LLC Fracturing Fluid Waste 35.45 Tons LANDFILL 100172
2015 CNX GAS CO LLC Fracing Fluid Waste 13,412.75 Bbl REUSE OTHER THAN ROAD SPREADING
2015 CNX GAS CO LLC Produced Fluid 15,912.93 Bbl REUSE OTHER THAN ROAD SPREADING
2016 CNX GAS CO LLC Produced Fluid 138.17 Bbl INJECTION DISPOSAL WELL 34-119-28780
2016 CNX GAS CO LLC Produced Fluid 828.50 Bbl INJECTION DISPOSAL WELL 34-119-28803
2016 CNX GAS CO LLC Produced Fluid 711.74 Bbl INJECTION DISPOSAL WELL 34-013-20609
2016 CNX GAS CO LLC Produced Fluid 17,729.63 Bbl REUSE OTHER THAN ROAD SPREADING
2017 NOBLE ENERGY INC Produced Fluid 2,352.70 Bbl REUSE AT A WELL PAD OUTSIDE PENNSYLVANIA
2017 NOBLE ENERGY INC Produced Fluid 36.22 Bbl REUSE OTHER THAN ROAD SPREADING
2017 NOBLE ENERGY INC Produced Fluid 2,578.00 Bbl INJECTION DISPOSAL WELL 34-119-28803
2018 HG ENERGY II APPALACHIA LLC Produced Fluid 242.00 Bbl INJECTION DISPOSAL WELL 34-119-28803
2019 HG ENERGY II APPALACHIA LLC Produced Fluid 1,048.00 Bbl SURFACE IMPOUNDMENT 95-7-37312-19
2019 HG ENERGY II APPALACHIA LLC Produced Fluid 393.00 Bbl SURFACE IMPOUNDMENT 95-7-37312-21
2019 HG ENERGY II APPALACHIA LLC Produced Fluid 1,445.00 Bbl INJECTION DISPOSAL WELL 34-119-28803

For data sources see[8]

Inspection Data

Inspections Performed

Inspection ID Inspection Category Inspection Date Inspection Type Inspection Result Inspection Comments
2235681 Primary Facility 2014-01-06 Drilling/Alteration No Violations Noted
2264336 Primary Facility 2014-04-17 Drilling/Alteration No Violations Noted Yost drilling for CNX using closed loop system and flare stack. Currently changing over to directional bit. CD is 3605 and KOP is 3605. Containment under rig and support equipment in good condition. BOP tested good at nipple up.
2312149 Primary Facility 2014-10-10 Routine/Complete Inspection No Violations Noted
2317289 Primary Facility 2014-06-04 Routine/Complete Inspection No Violations Noted Temporary minor modification to access road for rig entry.
2339135 Primary Facility 2015-01-23 Drilling/Alteration No Violations Noted On site fracing job in progress. Followed up on third party call about excess traffic on Twp roads. Discussed better traffic control with Completions engineer and WSM. (Burkett Shale).
2406849 Primary Facility 2015-05-07 Routine/Complete Inspection No Violations Noted Well has been drilled, hydraulically fractured, and is in flow back operations.
2584806 Primary Facility 2017-04-11 Routine/Complete Inspection No Violations Noted On 4/11/2017, the Department performed an inspection of the Noble Energy, NV60 site. The site is located in East Finley, Twp., Washington Co. The inspection was a routine inspection of the site post restoration and before termination of the ESCGP2 permit.

The site was recently transferred from CNX to Noble Energy. CNX had applied for a restoration extension for the site which has expired. CNX had restored the site and installed PCSM structures (Infiltration Berms). The PCSM structures are not functioning and are failing causing accelerated erosion. Several areas, recently restored on the well pad and well pad slopes have poor vegetative cover. Kim Walker (Noble Energy) was contacted and she stated that Noble is discussing reconstructing the PCSM structured or possibly modifying the approved ESCGP2 permit for the installation of different PCSM structures. Noble plans to revisit the site in the near future to address the deficiencies.

9 wells have been drilled to completion, are in good condition,and are

2631140 Primary Facility 2017-07-26 Routine/Complete Inspection No Violations Noted On July 26, 2017, the Department performed an inspection of the HG Energy NV60 well pad site. Present at time of inspection was Jared Stemple (HG). The site is located in East Finley Twp., Washington County. The inspection was related to a request by the operator to meet on site to discuss start rehabilitation of the PCSM structures and interim restoration of the site.

The operator has contracted with Burns Construction to rehabilitate the failing infiltration berms on the northeast corner of the site. ARM group will be overseeing the construction activity in the field for the operator.

9 wells have been drilled to completion and are equipped for production.

2651237 Primary Facility 2017-10-04 Site Restoration No Violations Noted On October 4, 2017, the Department performed an inspection of the Noble/HG Energy NV60 well pad. The site is located in East Finley Twp., Washington Co. The inspection was related a well restoration report for the wells drilled on site by CNX prior to the sale of the site to Noble and then HG.

The well pad access road and well pad are in good condition.

The site has been restored and PCSMs (Infiltration berms) have been installed. The two infiltration berms on the northeast corner of the well pad are not functioning and have failed. The well pad has been reduced in size and vegetated. HG Energy has met with the Department and discussed repair of the infiltration berms.

9 wells have been drilled to completion and are equipped for production on site. The GPUs on site are not in secondary containment. The operator will need to place the GPUs into containment in the future.

For data sources see[9]

References