If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 37-125-27280 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":40.116586,"lon":-80.074564,"icon":""}]} |
Country: United States | |
State: Pennsylvania | |
County: Washington | |
Municipality: Somerset Township | |
Operator Name: RICE DRILLING B LLC | |
Well Pad ID: 145010 | |
Farm/Lease Name: BIG DADDY SHAW | |
License Status: Active | |
Spud Date: 2014-03-13 | |
Permit Date: 2014-01-29 | |
Well Type: GAS | |
Unconventional Well: Y | |
Configuration: Horizontal Well | |
Conservation: Yes | |
Latitude: 40.116586 | |
Longitude: -80.074564 |
Date | Event |
---|---|
2014-01-29 | New Permit Application |
2014-02-11 | Performed Spud Operation |
2014-03-24 | Drilling Completion |
2014-05-12 | Drilling Completion |
2014-08-04 | Perforation |
2014-08-13 | Perforation |
2014-08-13 | Performed Stage 1 of Stimulation |
2014-08-13 | Performed Stage 2 of Stimulation |
2014-08-14 | Perforation |
2014-08-14 | Performed Stage 3 of Stimulation |
2014-08-14 | Performed Stage 4 of Stimulation |
2014-08-14 | Performed Stage 5 of Stimulation |
2014-08-15 | Performed Stage 6 of Stimulation |
2014-08-26 | Perforation |
2014-08-26 | Performed Stage 7 of Stimulation |
2014-09-03 | Perforation |
2014-09-03 | Performed Stage 8 of Stimulation |
2014-09-04 | Perforation |
2014-09-04 | Performed Stage 10 of Stimulation |
2014-09-04 | Performed Stage 9 of Stimulation |
2014-09-05 | Perforation |
2014-09-05 | Performed Stage 11 of Stimulation |
2014-09-10 | Perforation |
2014-09-10 | Performed Stage 12 of Stimulation |
2014-09-10 | Performed Stage 13 of Stimulation |
2014-09-11 | Perforation |
2014-09-11 | Performed Stage 14 of Stimulation |
2014-09-11 | Performed Stage 15 of Stimulation |
2014-09-12 | Perforation |
2014-09-12 | Performed Stage 16 of Stimulation |
2014-09-13 | Perforation |
2014-09-13 | Performed Stage 17 of Stimulation |
2014-09-13 | Performed Stage 18 of Stimulation |
2014-09-13 | Performed Stage 19 of Stimulation |
2014-09-13 | Performed Stage 20 of Stimulation |
2014-09-14 | Perforation |
2014-09-14 | Performed Stage 21 of Stimulation |
2014-09-14 | Performed Stage 22 of Stimulation |
2018-07-09 | Deviated |
2018-07-09 | Newly Drilled |
For data sources see[4]
Stimulation Date | Phase Number | Chemical Agent | Volume (gal) | Treating Pressure (psi) | Breakdown Pressure (psi) |
---|---|---|---|---|---|
2014-08-13 | 1 | Silica Sand | 35,483 | 8,203 | 8,779 |
2014-08-13 | 2 | Silica Sand | 35,483 | 8,460 | 8,844 |
2014-08-14 | 3 | Silica Sand | 35,483 | 8,377 | 8,406 |
2014-08-14 | 4 | Silica Sand | 35,483 | 7,963 | 8,612 |
2014-08-14 | 5 | Silica Sand | 35,483 | 8,214 | 9,050 |
2014-08-15 | 6 | Silica Sand | 35,483 | 8,283 | 9,004 |
2014-08-26 | 7 | Silica Sand | 35,483 | 8,422 | 9,314 |
2014-09-03 | 8 | Silica Sand | 35,483 | 7,513 | 9,122 |
2014-09-04 | 9 | Silica Sand | 35,483 | 7,772 | 8,540 |
2014-09-04 | 10 | Silica Sand | 35,483 | 8,030 | 9,404 |
2014-09-05 | 11 | Silica Sand | 35,483 | 8,037 | 9,335 |
2014-09-10 | 12 | Silica Sand | 35,483 | 7,771 | 9,331 |
2014-09-10 | 13 | Silica Sand | 35,483 | 8,174 | 9,116 |
2014-09-11 | 14 | Silica Sand | 35,483 | 7,688 | 8,955 |
2014-09-11 | 15 | Silica Sand | 35,483 | 7,358 | 9,235 |
2014-09-12 | 16 | Silica Sand | 35,483 | 7,535 | 8,683 |
2014-09-13 | 17 | Silica Sand | 35,483 | 7,558 | 8,527 |
2014-09-13 | 18 | Silica Sand | 35,483 | 7,243 | 8,934 |
2014-09-13 | 19 | Silica Sand | 35,483 | 7,107 | 8,933 |
2014-09-13 | 20 | Silica Sand | 35,483 | 7,395 | 8,963 |
2014-09-14 | 21 | Silica Sand | 35,483 | 6,911 | 7,445 |
2014-09-14 | 22 | Silica Sand | 35,483 | 6,563 | 8,279 |
For data sources see[5]
Period | Operator Name | Gas Quantity (mcf) | Gas Production Days | Oil Quantity (bbl) | Oil Production Days | Water Quantity (bbl) | Water Production Days |
---|---|---|---|---|---|---|---|
2014 | RICE DRILLING B LLC | 689,410.00 | 70 | 0.00 | 0 | 0.00 | 0 |
2015 | RICE DRILLING B LLC | 1,964,921.00 | 364 | 0.00 | 0 | 0.00 | 0 |
2016 | RICE DRILLING B LLC | 953,018.18 | 360 | 0.00 | 0 | 0.00 | 0 |
2017 | RICE DRILLING B LLC | 734,623.57 | 333 | 0.00 | 0 | 0.00 | 0 |
2018 | RICE DRILLING B LLC | 577,130.00 | 365 | 0.00 | 0 | 0.00 | 0 |
2019 | RICE DRILLING B LLC | 664,396.00 | 360 | 0.00 | 0 | 0.00 | 0 |
For data sources see[6]
Period | Operator | Waste Type | Quantity | Disposal Method | Waste Facility ID |
---|---|---|---|---|---|
2014 | RICE DRILLING B LLC | Fracturing Fluid Waste | 27.85 Tons | LANDFILL | 100172 |
2014 | RICE DRILLING B LLC | Drill Cuttings | 149.01 Tons | LANDFILL | 301071 |
2014 | RICE DRILLING B LLC | Produced Fluid | 18.57 Bbl | RESIDUAL WASTE PROC FAC (GENERAL PERMIT) | WMGR123SW010 |
2014 | RICE DRILLING B LLC | Produced Fluid | 1,951.43 Bbl | INJECTION DISPOSAL WELL | 34-157-25511 |
2014 | RICE DRILLING B LLC | Produced Fluid | 6,986.29 Bbl | CENT WASTE TRT FAC NPDES | PA0254185 |
2014 | RICE DRILLING B LLC | Drill Cuttings | 222.84 Tons | LANDFILL | 100172 |
2014 | RICE DRILLING B LLC | Produced Fluid | 6,986.29 Bbl | CENT WASTE TRT FAC NPDES DISCHARGE | PA0254185 |
2015 | RICE DRILLING B LLC | Fracturing Fluid Waste | 2.85 Tons | LANDFILL | 100172 |
2015 | RICE DRILLING B LLC | Produced Fluid | 122.57 Bbl | INJECTION DISPOSAL WELL | 34-157-25511 |
2015 | RICE DRILLING B LLC | Drilling Fluid Waste | 68.05 Bbl | LANDFILL | 100592 |
2015 | RICE DRILLING B LLC | Produced Fluid | 157.14 Bbl | RESIDUAL WASTE PROC FAC (GENERAL PERMIT) | WMGR123SW010 |
2015 | RICE DRILLING B LLC | Fracturing Fluid Waste | 2.36 Tons | RESIDUAL WASTE PROCESSING FACILITY | 2014-541 |
2015 | RICE DRILLING B LLC | Produced Fluid | 15.71 Bbl | INJECTION DISPOSAL WELL | 34-013-20609 |
2015 | RICE DRILLING B LLC | Produced Fluid | 4,360.71 Bbl | RESIDUAL WASTE PROC FAC (GENERAL PERMIT) | WMGR123SW005 |
2015 | RICE DRILLING B LLC | Fracturing Fluid Waste | 2.00 Tons | INJECTION DISPOSAL WELL | 42-003-38495 |
2015 | RICE DRILLING B LLC | Fracturing Fluid Waste | 5.53 Tons | LANDFILL | 100592 |
2015 | RICE DRILLING B LLC | Produced Fluid | 12,327.76 Bbl | REUSE OTHER THAN ROAD SPREADING | |
2016 | RICE DRILLING B LLC | Other Oil & Gas Wastes | 9.14 Bbl | RESIDUAL WASTE PROCESSING FACILITY | WMGR123SW019 |
2016 | RICE DRILLING B LLC | Produced Fluid | 178.57 Bbl | RESIDUAL WASTE PROC FAC (GENERAL PERMIT) | WMGR123SW005 |
2016 | RICE DRILLING B LLC | Produced Fluid | 1.07 Bbl | RESIDUAL WASTE PROCESSING FACILITY | 2014-541 |
2016 | RICE DRILLING B LLC | Other Oil & Gas Wastes | 305.86 Bbl | REUSE OTHER THAN ROAD SPREADING | |
2016 | RICE DRILLING B LLC | Produced Fluid | 173.19 Bbl | RESIDUAL WASTE PROCESSING FACILITY | WMGR123SW019 |
2016 | RICE DRILLING B LLC | Filter Socks | 0.02 Tons | RESIDUAL WASTE PROCESSING FACILITY | 301280 |
2016 | RICE DRILLING B LLC | Waste Water Treatment Sludge | 2.88 Tons | RESIDUAL WASTE PROCESSING FACILITY | 2014-541 |
2016 | RICE DRILLING B LLC | Other Oil & Gas Wastes | 9.57 Bbl | RESIDUAL WASTE PROCESSING FACILITY | WMGR123SW005 |
2016 | RICE DRILLING B LLC | Produced Fluid | 496.44 Bbl | CENTRALIZED TREATMENT PLANT FOR RECYCLE | WMGR123SW019 |
2016 | RICE DRILLING B LLC | Produced Fluid | 123.60 Bbl | RESIDUAL WASTE PROCESSING FACILITY | WMGR123SW005 |
2016 | RICE DRILLING B LLC | Produced Fluid | 4,876.88 Bbl | REUSE OTHER THAN ROAD SPREADING | |
2017 | RICE DRILLING B LLC | Other Oil & Gas Wastes | 115.32 Bbl | REUSE (AT WELL PAD) | |
2017 | RICE DRILLING B LLC | Other Oil & Gas Wastes | 44.12 Bbl | RESIDUAL WASTE PROCESSING FACILITY | WMGR123SW005 |
2017 | RICE DRILLING B LLC | Other Oil & Gas Wastes | 15.71 Bbl | RESIDUAL WASTE PROCESSING FACILITY | WMGR123SW019 |
2017 | RICE DRILLING B LLC | Produced Fluid | 425.50 Bbl | RESIDUAL WASTE PROCESSING FACILITY | WMGR123SW005 |
2017 | RICE DRILLING B LLC | Filter Socks | 0.04 Tons | RESIDUAL WASTE PROCESSING FACILITY | 301280 |
2017 | RICE DRILLING B LLC | Produced Fluid | 822.53 Bbl | REUSE (AT WELL PAD) | |
2018 | RICE DRILLING B LLC | Other Oil & Gas Wastes | 38.56 Bbl | REUSE (AT WELL PAD) | |
2018 | RICE DRILLING B LLC | Produced Fluid | 322.35 Bbl | REUSE (AT WELL PAD) | |
2018 | RICE DRILLING B LLC | Other Oil & Gas Wastes | 12.86 Bbl | RESIDUAL WASTE PROCESSING FACILITY | WMGR123SW005 |
2018 | RICE DRILLING B LLC | Produced Fluid | 34.14 Bbl | REUSE AT A WELL PAD OUTSIDE PENNSYLVANIA | |
2018 | RICE DRILLING B LLC | Produced Fluid | 103.67 Bbl | RESIDUAL WASTE PROCESSING FACILITY | WMGR123SW005 |
2019 | RICE DRILLING B LLC | Produced Fluid | 839.35 Bbl | REUSE (AT WELL PAD) | |
2019 | RICE DRILLING B LLC | Other Oil & Gas Wastes | 32.86 Bbl | RESIDUAL WASTE PROCESSING FACILITY | WMGR123SW005 |
2019 | RICE DRILLING B LLC | Other Oil & Gas Wastes | 116.95 Bbl | REUSE (AT WELL PAD) | |
2019 | RICE DRILLING B LLC | Produced Fluid | 19.98 Bbl | RESIDUAL WASTE PROCESSING FACILITY | WMGR123SW010 |
For data sources see[7]
Inspection ID | Inspection Category | Inspection Date | Inspection Type | Inspection Result | Inspection Comments |
---|---|---|---|---|---|
2255837 | Primary Facility | 2014-03-13 | Drilling/Alteration | No Violations Noted | |
2271144 | Primary Facility | 2014-05-14 | Drilling/Alteration | No Violations Noted | Patterson Rig 349 |
2768893 | Primary Facility | 2018-08-29 | Routine/Complete Inspection | No Violations Noted | Well appears to be maintained and producing. Water in cellar. |
2824375 | Primary Facility | 2019-01-09 | Routine/Complete Inspection | No Violations Noted | On 1/9/19 a routine complete inspection of the Big Daddy Shaw Well Pad was conducted in response to an operator request. The following was observed:
>>The operator representative reported plans to revisit the site to drill further wells. >>A minor modification to place a raised berm around the perimeter of the pad was requested and denied due to substantial changes in flow patterns around the pad necessitating engineer review. >>The site was in generally good condition with no noted violations or concerns. |
2837707 | Primary Facility | 2019-02-08 | Routine/Complete Inspection | No Violations Noted | Well appears to be well maintained and producing.
Cellar Tech/NOV auger rig on location to spud 7 new wells. |
2838449 | Primary Facility | 2019-02-07 | Routine/Complete Inspection | No Violations Noted | Well drilled and equipped for production. Well tag present. |
For data sources see[8]