If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 37-125-27282 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":40.116667,"lon":-80.074664,"icon":""}]} |
Country: United States | |
State: Pennsylvania | |
County: Washington | |
Municipality: Somerset Township | |
Operator Name: RICE DRILLING B LLC | |
Well Pad ID: 145010 | |
Farm/Lease Name: BIG DADDY SHAW | |
License Status: Active | |
Spud Date: 2014-02-11 | |
Permit Date: 2014-01-29 | |
Well Type: GAS | |
Unconventional Well: Y | |
Configuration: Horizontal Well | |
Conservation: Yes | |
Latitude: 40.116667 | |
Longitude: -80.074664 |
Date | Event |
---|---|
2014-01-29 | New Permit Application |
2014-02-11 | Performed Spud Operation |
2014-02-24 | Drilling Completion |
2014-04-29 | Drilling Completion |
2014-08-04 | Perforation |
2014-08-31 | Performed Stage 1 of Stimulation |
2014-09-02 | Perforation |
2014-09-02 | Performed Stage 2 of Stimulation |
2014-09-02 | Performed Stage 3 of Stimulation |
2014-09-03 | Perforation |
2014-09-03 | Performed Stage 4 of Stimulation |
2014-09-04 | Perforation |
2014-09-04 | Performed Stage 5 of Stimulation |
2014-09-05 | Perforation |
2014-09-05 | Performed Stage 6 of Stimulation |
2014-09-05 | Performed Stage 7 of Stimulation |
2014-09-06 | Perforation |
2014-09-06 | Performed Stage 8 of Stimulation |
2014-09-07 | Perforation |
2014-09-07 | Performed Stage 10 of Stimulation |
2014-09-07 | Performed Stage 11 of Stimulation |
2014-09-07 | Performed Stage 9 of Stimulation |
2014-09-08 | Perforation |
2014-09-08 | Performed Stage 12 of Stimulation |
2014-09-08 | Performed Stage 13 of Stimulation |
2014-09-08 | Performed Stage 14 of Stimulation |
2014-09-09 | Perforation |
2014-09-09 | Performed Stage 15 of Stimulation |
2014-09-09 | Performed Stage 16 of Stimulation |
2014-09-09 | Performed Stage 17 of Stimulation |
2014-09-10 | Perforation |
2014-09-10 | Performed Stage 18 of Stimulation |
2018-07-10 | Deviated |
2018-07-10 | Newly Drilled |
For data sources see[4]
Stimulation Date | Phase Number | Chemical Agent | Volume (gal) | Treating Pressure (psi) | Breakdown Pressure (psi) |
---|---|---|---|---|---|
2014-08-31 | 1 | Silica Sand | 30,698 | 8,367 | 9,054 |
2014-09-02 | 2 | Silica Sand | 30,698 | 8,103 | 9,058 |
2014-09-02 | 3 | Silica Sand | 30,698 | 8,426 | 8,939 |
2014-09-03 | 4 | Silica Sand | 30,698 | 8,126 | 8,737 |
2014-09-04 | 5 | Silica Sand | 30,698 | 7,800 | 8,933 |
2014-09-05 | 6 | Silica Sand | 30,698 | 8,487 | 9,407 |
2014-09-05 | 7 | Silica Sand | 30,698 | 7,976 | 8,995 |
2014-09-06 | 8 | Silica Sand | 30,698 | 7,895 | 8,901 |
2014-09-07 | 9 | Silica Sand | 30,698 | 8,012 | 8,644 |
2014-09-07 | 10 | Silica Sand | 30,698 | 7,651 | 9,275 |
2014-09-07 | 11 | Silica Sand | 30,698 | 7,941 | 8,675 |
2014-09-08 | 12 | Silica Sand | 30,698 | 7,259 | 8,940 |
2014-09-08 | 13 | Silica Sand | 30,698 | 7,100 | 10,164 |
2014-09-08 | 14 | Silica Sand | 30,698 | 7,365 | 7,970 |
2014-09-09 | 15 | Silica Sand | 30,698 | 7,305 | 8,282 |
2014-09-09 | 16 | Silica Sand | 30,698 | 7,046 | 8,015 |
2014-09-09 | 17 | Silica Sand | 30,698 | 7,097 | 8,601 |
2014-09-10 | 18 | Silica Sand | 30,698 | 6,640 | 8,776 |
For data sources see[5]
Period | Operator Name | Gas Quantity (mcf) | Gas Production Days | Oil Quantity (bbl) | Oil Production Days | Water Quantity (bbl) | Water Production Days |
---|---|---|---|---|---|---|---|
2014 | RICE DRILLING B LLC | 704,159.00 | 70 | 0.00 | 0 | 0.00 | 0 |
2015 | RICE DRILLING B LLC | 1,829,255.00 | 364 | 0.00 | 0 | 0.00 | 0 |
2016 | RICE DRILLING B LLC | 1,033,192.44 | 365 | 0.00 | 0 | 0.00 | 0 |
2017 | RICE DRILLING B LLC | 609,239.04 | 343 | 0.00 | 0 | 0.00 | 0 |
2018 | RICE DRILLING B LLC | 259,855.00 | 359 | 0.00 | 0 | 0.00 | 0 |
2019 | RICE DRILLING B LLC | 216,581.00 | 288 | 0.00 | 0 | 0.00 | 0 |
For data sources see[6]
Period | Operator | Waste Type | Quantity | Disposal Method | Waste Facility ID |
---|---|---|---|---|---|
2014 | RICE DRILLING B LLC | Produced Fluid | 18.57 Bbl | RESIDUAL WASTE PROC FAC (GENERAL PERMIT) | WMGR123SW010 |
2014 | RICE DRILLING B LLC | Drill Cuttings | 527.16 Tons | LANDFILL | 100172 |
2014 | RICE DRILLING B LLC | Produced Fluid | 6,986.29 Bbl | CENT WASTE TRT FAC NPDES DISCHARGE | PA0254185 |
2014 | RICE DRILLING B LLC | Fracturing Fluid Waste | 27.85 Tons | LANDFILL | 100172 |
2014 | RICE DRILLING B LLC | Drill Cuttings | 124.77 Tons | LANDFILL | 100277 |
2014 | RICE DRILLING B LLC | Produced Fluid | 6,986.29 Bbl | CENT WASTE TRT FAC NPDES | PA0254185 |
2014 | RICE DRILLING B LLC | Produced Fluid | 1,951.43 Bbl | INJECTION DISPOSAL WELL | 34-157-25511 |
2015 | RICE DRILLING B LLC | Fracturing Fluid Waste | 2.36 Tons | RESIDUAL WASTE PROCESSING FACILITY | 2014-541 |
2015 | RICE DRILLING B LLC | Fracturing Fluid Waste | 2.85 Tons | LANDFILL | 100172 |
2015 | RICE DRILLING B LLC | Produced Fluid | 157.14 Bbl | RESIDUAL WASTE PROC FAC (GENERAL PERMIT) | WMGR123SW010 |
2015 | RICE DRILLING B LLC | Produced Fluid | 15.71 Bbl | INJECTION DISPOSAL WELL | 34-013-20609 |
2015 | RICE DRILLING B LLC | Produced Fluid | 122.57 Bbl | INJECTION DISPOSAL WELL | 34-157-25511 |
2015 | RICE DRILLING B LLC | Drilling Fluid Waste | 68.05 Bbl | LANDFILL | 100592 |
2015 | RICE DRILLING B LLC | Produced Fluid | 4,360.71 Bbl | RESIDUAL WASTE PROC FAC (GENERAL PERMIT) | WMGR123SW005 |
2015 | RICE DRILLING B LLC | Fracturing Fluid Waste | 2.00 Tons | INJECTION DISPOSAL WELL | 42-003-38495 |
2015 | RICE DRILLING B LLC | Fracturing Fluid Waste | 5.53 Tons | LANDFILL | 100592 |
2015 | RICE DRILLING B LLC | Produced Fluid | 12,327.76 Bbl | REUSE OTHER THAN ROAD SPREADING | |
2016 | RICE DRILLING B LLC | Other Oil & Gas Wastes | 305.86 Bbl | REUSE OTHER THAN ROAD SPREADING | |
2016 | RICE DRILLING B LLC | Other Oil & Gas Wastes | 9.14 Bbl | RESIDUAL WASTE PROCESSING FACILITY | WMGR123SW019 |
2016 | RICE DRILLING B LLC | Produced Fluid | 173.19 Bbl | RESIDUAL WASTE PROCESSING FACILITY | WMGR123SW019 |
2016 | RICE DRILLING B LLC | Other Oil & Gas Wastes | 9.57 Bbl | RESIDUAL WASTE PROCESSING FACILITY | WMGR123SW005 |
2016 | RICE DRILLING B LLC | Produced Fluid | 496.44 Bbl | CENTRALIZED TREATMENT PLANT FOR RECYCLE | WMGR123SW019 |
2016 | RICE DRILLING B LLC | Produced Fluid | 4,876.88 Bbl | REUSE OTHER THAN ROAD SPREADING | |
2016 | RICE DRILLING B LLC | Filter Socks | 0.02 Tons | RESIDUAL WASTE PROCESSING FACILITY | 301280 |
2016 | RICE DRILLING B LLC | Waste Water Treatment Sludge | 2.88 Tons | RESIDUAL WASTE PROCESSING FACILITY | 2014-541 |
2016 | RICE DRILLING B LLC | Produced Fluid | 123.60 Bbl | RESIDUAL WASTE PROCESSING FACILITY | WMGR123SW005 |
2016 | RICE DRILLING B LLC | Produced Fluid | 178.57 Bbl | RESIDUAL WASTE PROC FAC (GENERAL PERMIT) | WMGR123SW005 |
2016 | RICE DRILLING B LLC | Produced Fluid | 1.07 Bbl | RESIDUAL WASTE PROCESSING FACILITY | 2014-541 |
2017 | RICE DRILLING B LLC | Filter Socks | 0.04 Tons | RESIDUAL WASTE PROCESSING FACILITY | 301280 |
2017 | RICE DRILLING B LLC | Other Oil & Gas Wastes | 115.32 Bbl | REUSE (AT WELL PAD) | |
2017 | RICE DRILLING B LLC | Other Oil & Gas Wastes | 15.71 Bbl | RESIDUAL WASTE PROCESSING FACILITY | WMGR123SW019 |
2017 | RICE DRILLING B LLC | Produced Fluid | 609.88 Bbl | REUSE (AT WELL PAD) | |
2017 | RICE DRILLING B LLC | Other Oil & Gas Wastes | 44.12 Bbl | RESIDUAL WASTE PROCESSING FACILITY | WMGR123SW005 |
2017 | RICE DRILLING B LLC | Produced Fluid | 425.50 Bbl | RESIDUAL WASTE PROCESSING FACILITY | WMGR123SW005 |
2018 | RICE DRILLING B LLC | Produced Fluid | 41.15 Bbl | RESIDUAL WASTE PROCESSING FACILITY | WMGR123SW005 |
2018 | RICE DRILLING B LLC | Produced Fluid | 13.58 Bbl | REUSE AT A WELL PAD OUTSIDE PENNSYLVANIA | |
2018 | RICE DRILLING B LLC | Other Oil & Gas Wastes | 48.56 Bbl | REUSE (AT WELL PAD) | |
2018 | RICE DRILLING B LLC | Other Oil & Gas Wastes | 12.86 Bbl | RESIDUAL WASTE PROCESSING FACILITY | WMGR123SW005 |
2018 | RICE DRILLING B LLC | Produced Fluid | 133.72 Bbl | REUSE (AT WELL PAD) | |
2018 | RICE DRILLING B LLC | Produced Fluid | 0.49 Tons | LANDFILL | CID: 29084 |
2019 | RICE DRILLING B LLC | Other Oil & Gas Wastes | 32.86 Bbl | RESIDUAL WASTE PROCESSING FACILITY | WMGR123SW005 |
2019 | RICE DRILLING B LLC | Produced Fluid | 266.62 Bbl | REUSE (AT WELL PAD) | |
2019 | RICE DRILLING B LLC | Other Oil & Gas Wastes | 100.53 Bbl | REUSE (AT WELL PAD) | |
2019 | RICE DRILLING B LLC | Other Oil & Gas Wastes | 10.83 Bbl | RESIDUAL WASTE PROCESSING FACILITY | WMGR123SW010 |
2019 | RICE DRILLING B LLC | Produced Fluid | 2.20 Bbl | RESIDUAL WASTE PROCESSING FACILITY | WMGR123SW019 |
For data sources see[7]
Inspection ID | Inspection Category | Inspection Date | Inspection Type | Inspection Result | Inspection Comments |
---|---|---|---|---|---|
2251981 | Primary Facility | 2014-02-20 | Drilling/Alteration | No Violations Noted | |
2267427 | Primary Facility | 2014-04-30 | Drilling/Alteration | No Violations Noted | Patterson Rig 349 |
2271526 | Primary Facility | 2014-04-28 | Drilling/Alteration | No Violations Noted | Patterson #349 drilling for Rice Energy using closed loop system and flare stack Currently circulating while rig is being maintenanced. Current depth is 14,699. Containment and decking under rig and support equipment in good condition. |
2768908 | Primary Facility | 2018-08-29 | Routine/Complete Inspection | No Violations Noted | Well appears to be maintained and producing. Water in cellar. |
2824379 | Primary Facility | 2019-01-09 | Routine/Complete Inspection | No Violations Noted | On 1/9/19 a routine complete inspection of the Big Daddy Shaw Well Pad was conducted in response to an operator request. The following was observed:
>>The operator representative reported plans to revisit the site to drill further wells. >>A minor modification to place a raised berm around the perimeter of the pad was requested and denied due to substantial changes in flow patterns around the pad necessitating engineer review. >>The site was in generally good condition with no noted violations or concerns. |
2837715 | Primary Facility | 2019-02-08 | Routine/Complete Inspection | No Violations Noted | Well appears to be well maintained and producing.
Cellar Tech/NOV auger rig on location to spud 7 new wells. |
2838447 | Primary Facility | 2019-02-07 | Routine/Complete Inspection | No Violations Noted | Well drilled and equipped for production. Well tag present. |
For data sources see[8]