If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 37-125-27318 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":40.147567,"lon":-80.113403,"icon":""}]} |
Country: United States | |
State: Pennsylvania | |
County: Washington | |
Municipality: Somerset Township | |
Operator Name: RICE DRILLING B LLC | |
Well Pad ID: 150953 | |
Farm/Lease Name: POLLOCK 1H | |
License Status: | |
Spud Date: | |
Permit Date: 2014-03-05 | |
Well Type: GAS | |
Unconventional Well: Y | |
Configuration: Horizontal Well | |
Conservation: No | |
Latitude: 40.147567 | |
Longitude: -80.113403 |
Date | Event |
---|---|
2014-03-05 | New Permit Application |
2014-04-07 | Performed Spud Operation |
2014-05-04 | Drilling Completion |
2014-08-16 | Drilling Completion |
2014-10-14 | Perforation |
2014-10-16 | Performed Stimulation |
2016-03-28 | DEVIATED |
2016-03-28 | NEWLY DRILLED |
For data sources see[4]
Stimulation Date | Phase Number | Chemical Agent | Volume (gal) | Treating Pressure (psi) | Breakdown Pressure (psi) |
---|---|---|---|---|---|
2014-10-16 | 0 | 0 | 0 |
For data sources see[5]
Period | Operator Name | Gas Quantity (mcf) | Gas Production Days | Oil Quantity (bbl) | Oil Production Days | Water Quantity (bbl) | Water Production Days |
---|---|---|---|---|---|---|---|
2014 | RICE DRILLING B LLC | 0.00 | 0 | 0.00 | 0 | 0.00 | 0 |
2015 | RICE DRILLING B LLC | 1,413,346.00 | 268 | 0.00 | 0 | 0.00 | 0 |
2016 | RICE DRILLING B LLC | 1,099,652.07 | 363 | 0.00 | 0 | 0.00 | 0 |
2017 | RICE DRILLING B LLC | 616,998.79 | 333 | 0.00 | 0 | 0.00 | 0 |
2018 | RICE DRILLING B LLC | 334,652.00 | 348 | 0.00 | 0 | 0.00 | 0 |
2019 | RICE DRILLING B LLC | 323,233.00 | 351 | 0.00 | 0 | 0.00 | 0 |
For data sources see[6]
Period | Operator | Waste Type | Quantity | Disposal Method | Waste Facility ID |
---|---|---|---|---|---|
2014 | RICE DRILLING B LLC | Fracturing Fluid Waste | 18.96 Tons | LANDFILL | 100592 |
2014 | RICE DRILLING B LLC | Drill Cuttings | 62.76 Tons | LANDFILL | PAD059087072 |
2014 | RICE DRILLING B LLC | Fracturing Fluid Waste | 15.62 Tons | LANDFILL | 100172 |
2014 | RICE DRILLING B LLC | Drill Cuttings | 129.83 Tons | LANDFILL | 301071 |
2014 | RICE DRILLING B LLC | Drill Cuttings | 129.83 Tons | LANDFILL | 100277 |
2014 | RICE DRILLING B LLC | Produced Fluid | 192.50 Bbl | INJECTION DISPOSAL WELL | 34-157-25511 |
2014 | RICE DRILLING B LLC | Produced Fluid | 5.00 Bbl | RESIDUAL WASTE PROC FAC (GENERAL PERMIT) | WMGR123SW010 |
2014 | RICE DRILLING B LLC | Produced Fluid | 1,737.55 Bbl | CENT WASTE TRT FAC NPDES | PA0254185 |
2014 | RICE DRILLING B LLC | Drill Cuttings | 578.89 Tons | LANDFILL | 100172 |
2014 | RICE DRILLING B LLC | Produced Fluid | 1,737.55 Bbl | CENT WASTE TRT FAC NPDES DISCHARGE | PA0254185 |
2015 | RICE DRILLING B LLC | Fracturing Fluid Waste | 3.48 Tons | LANDFILL | 100172 |
2015 | RICE DRILLING B LLC | Produced Fluid | 88.00 Bbl | INJECTION DISPOSAL WELL | 34-157-25511 |
2015 | RICE DRILLING B LLC | Fracturing Fluid Waste | 3.60 Tons | RESIDUAL WASTE PROCESSING FACILITY | 2014-541 |
2015 | RICE DRILLING B LLC | Produced Fluid | 100.25 Bbl | INJECTION DISPOSAL WELL | 34-013-20609 |
2015 | RICE DRILLING B LLC | Produced Fluid | 3,035.50 Bbl | RESIDUAL WASTE PROC FAC (GENERAL PERMIT) | WMGR123SW005 |
2015 | RICE DRILLING B LLC | Fracturing Fluid Waste | 3.50 Tons | INJECTION DISPOSAL WELL | 42-003-38495 |
2015 | RICE DRILLING B LLC | Fracturing Fluid Waste | 3.52 Tons | LANDFILL | 100592 |
2015 | RICE DRILLING B LLC | Produced Fluid | 9,955.50 Bbl | REUSE OTHER THAN ROAD SPREADING | |
2016 | RICE DRILLING B LLC | Other Oil & Gas Wastes | 4.45 Bbl | RESIDUAL WASTE PROCESSING FACILITY | WMGR123SW019 |
2016 | RICE DRILLING B LLC | Produced Fluid | 120.00 Bbl | RESIDUAL WASTE PROC FAC (GENERAL PERMIT) | WMGR123SW005 |
2016 | RICE DRILLING B LLC | Other Oil & Gas Wastes | 403.61 Bbl | REUSE OTHER THAN ROAD SPREADING | |
2016 | RICE DRILLING B LLC | Produced Fluid | 93.35 Bbl | RESIDUAL WASTE PROCESSING FACILITY | WMGR123SW019 |
2016 | RICE DRILLING B LLC | Filter Socks | 0.07 Tons | RESIDUAL WASTE PROCESSING FACILITY | 301280 |
2016 | RICE DRILLING B LLC | Fracturing Fluid Waste | 27.50 Bbl | RESIDUAL WASTE PROCESSING FACILITY | WMGR123SW005 |
2016 | RICE DRILLING B LLC | Produced Fluid | 166.04 Bbl | CENTRALIZED TREATMENT PLANT FOR RECYCLE | WMGR123SW019 |
2016 | RICE DRILLING B LLC | Produced Fluid | 119.92 Bbl | RESIDUAL WASTE PROCESSING FACILITY | WMGR123SW005 |
2016 | RICE DRILLING B LLC | Produced Fluid | 3,211.91 Bbl | REUSE OTHER THAN ROAD SPREADING | |
2017 | RICE DRILLING B LLC | Other Oil & Gas Wastes | 177.50 Bbl | REUSE (AT WELL PAD) | |
2017 | RICE DRILLING B LLC | Other Oil & Gas Wastes | 40.00 Bbl | RESIDUAL WASTE PROCESSING FACILITY | WMGR123SW005 |
2017 | RICE DRILLING B LLC | Produced Fluid | 216.60 Bbl | RESIDUAL WASTE PROCESSING FACILITY | WMGR123SW005 |
2017 | RICE DRILLING B LLC | Filter Socks | 0.03 Tons | RESIDUAL WASTE PROCESSING FACILITY | 301280 |
2017 | RICE DRILLING B LLC | Produced Fluid | 514.31 Bbl | REUSE (AT WELL PAD) | |
2018 | RICE DRILLING B LLC | Other Oil & Gas Wastes | 137.50 Bbl | REUSE (AT WELL PAD) | |
2018 | RICE DRILLING B LLC | Produced Fluid | 427.02 Bbl | REUSE (AT WELL PAD) | |
2018 | RICE DRILLING B LLC | Other Oil & Gas Wastes | 110.00 Bbl | RESIDUAL WASTE PROCESSING FACILITY | WMGR123SW005 |
2018 | RICE DRILLING B LLC | Produced Fluid | 41.74 Bbl | REUSE AT A WELL PAD OUTSIDE PENNSYLVANIA | |
2018 | RICE DRILLING B LLC | Produced Fluid | 79.69 Bbl | RESIDUAL WASTE PROCESSING FACILITY | WMGR123SW005 |
2019 | RICE DRILLING B LLC | Other Oil & Gas Wastes | 15.00 Bbl | RESIDUAL WASTE PROCESSING FACILITY | WMGR123SW005 |
2019 | RICE DRILLING B LLC | Other Oil & Gas Wastes | 55.00 Bbl | RESIDUAL WASTE PROCESSING FACILITY | |
2019 | RICE DRILLING B LLC | Other Oil & Gas Wastes | 134.75 Bbl | REUSE (AT WELL PAD) | |
2019 | RICE DRILLING B LLC | Produced Fluid | 394.89 Bbl | REUSE (AT WELL PAD) | |
2019 | RICE DRILLING B LLC | Produced Fluid | 10.00 Bbl | RESIDUAL WASTE PROCESSING FACILITY | WMGR123SW010 |
For data sources see[7]
Inspection ID | Inspection Category | Inspection Date | Inspection Type | Inspection Result | Inspection Comments |
---|---|---|---|---|---|
2261642 | Primary Facility | 2014-04-08 | Drilling/Alteration | No Violations Noted | Cellar set and cemented in place. 26" conductor set and cemented to surface. Containment and decking under rig and support equipment in good condition. |
2263221 | Primary Facility | 2014-04-16 | Drilling/Alteration | No Violations Noted | Falcon Drilling Rig 23 |
2263224 | Primary Facility | 2014-04-16 | Drilling/Alteration | No Violations Noted | Well Services Group (WSG) Rig 1 |
2264418 | Primary Facility | 2014-04-21 | Drilling/Alteration | No Violations Noted | Falcon Drilling Rig 23 |
2266647 | Primary Facility | 2014-04-29 | Drilling/Alteration | No Violations Noted | Falcon Drilling Rig 23 |
2296863 | Primary Facility | 2014-08-20 | Drilling/Alteration | No Violations Noted | Patterson-UTI Rig #312 |
2326160 | Primary Facility | 2014-11-24 | Complaint Inspection | No Violations Noted |
For data sources see[8]