If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 37-125-27491 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":40.229156,"lon":-80.031914,"icon":""}]} |
Country: United States | |
State: Pennsylvania | |
County: Washington | |
Municipality: Nottingham Township | |
Operator Name: EQT PROD CO | |
Well Pad ID: 149501 | |
Farm/Lease Name: HARBISON 592590 | |
License Status: Active | |
Spud Date: 2015-04-08 | |
Permit Date: 2014-10-17 | |
Well Type: GAS | |
Unconventional Well: Y | |
Configuration: Horizontal Well | |
Conservation: No | |
Latitude: 40.229156 | |
Longitude: -80.031914 |
Date | Event |
---|---|
2014-10-17 | New Permit Application |
2015-04-08 | Performed Spud Operation |
2015-07-11 | Drilling Completion |
2015-10-01 | Perforation |
2015-10-01 | Performed Stage 1 of Stimulation |
2015-10-01 | Performed Stage 2 of Stimulation |
2015-10-02 | Perforation |
2015-10-02 | Performed Stage 3 of Stimulation |
2015-10-02 | Performed Stage 4 of Stimulation |
2015-10-02 | Performed Stage 5 of Stimulation |
2015-10-02 | Performed Stage 6 of Stimulation |
2015-10-03 | Perforation |
2015-10-03 | Performed Stage 10 of Stimulation |
2015-10-03 | Performed Stage 7 of Stimulation |
2015-10-03 | Performed Stage 8 of Stimulation |
2015-10-03 | Performed Stage 9 of Stimulation |
2015-10-04 | Perforation |
2015-10-04 | Performed Stage 11 of Stimulation |
2015-10-04 | Performed Stage 12 of Stimulation |
2015-10-04 | Performed Stage 13 of Stimulation |
2015-10-04 | Performed Stage 14 of Stimulation |
2015-10-04 | Performed Stage 15 of Stimulation |
2015-10-04 | Performed Stage 16 of Stimulation |
2015-10-05 | Perforation |
2015-10-05 | Performed Stage 17 of Stimulation |
2015-10-05 | Performed Stage 18 of Stimulation |
2015-10-05 | Performed Stage 19 of Stimulation |
2015-10-05 | Performed Stage 20 of Stimulation |
2015-10-06 | Perforation |
2015-10-06 | Performed Stage 21 of Stimulation |
2015-10-06 | Performed Stage 22 of Stimulation |
2015-10-06 | Performed Stage 23 of Stimulation |
2015-10-06 | Performed Stage 24 of Stimulation |
2015-10-06 | Performed Stage 25 of Stimulation |
2015-10-06 | Performed Stage 26 of Stimulation |
2015-10-06 | Performed Stage 27 of Stimulation |
2015-10-07 | Perforation |
2015-10-07 | Performed Stage 28 of Stimulation |
2015-10-07 | Performed Stage 29 of Stimulation |
2015-10-07 | Performed Stage 30 of Stimulation |
2015-10-07 | Performed Stage 31 of Stimulation |
2015-10-07 | Performed Stage 32 of Stimulation |
2015-10-07 | Performed Stage 33 of Stimulation |
2015-10-07 | Performed Stage 34 of Stimulation |
2015-10-08 | Perforation |
2015-10-08 | Performed Stage 35 of Stimulation |
2015-10-08 | Performed Stage 36 of Stimulation |
2015-10-08 | Performed Stage 37 of Stimulation |
2015-10-08 | Performed Stage 38 of Stimulation |
2015-10-08 | Performed Stage 39 of Stimulation |
2015-10-08 | Performed Stage 40 of Stimulation |
2015-10-08 | Performed Stage 41 of Stimulation |
2015-10-09 | Perforation |
2015-10-09 | Performed Stage 42 of Stimulation |
2018-06-05 | Deviated |
For data sources see[4]
Job Number | Job Start Date | Job End Date | True Vertical Depth (ft) | Total Water Volume (gal) | Total Non-Water Volume (gal) |
---|---|---|---|---|---|
1 | 2015-09-30 | 2015-10-09 | 7,309 | 9,500,900 | 0 |
Job Number | Trade Name | Supplier | Purpose | Ingredient Name | CAS Number | Additive Percentage by Mass | Job Percentage by Mass | Mass Used (lb) |
---|---|---|---|---|---|---|---|---|
1 | APB-1 | FTS International | Gel Breaker | Ammonium Persulfate | 7727-54-0 | 95 | 0.00000323 | 2.85 |
CI-150 | FTS International | Acid corrosion inhibitor | Dimethylformamide | 68-12-2 | 10 | 0.00005903 | 52.048 | |
Aromatic aldehyde | Proprietary | 10 | 0.00005903 | 52.048 | ||||
Quaternary ammonium compound | Proprietary | 10 | 0.00005903 | 52.048 | ||||
Isopropanol | 67-63-0 | 30 | 0.000177103 | 156.143 | ||||
Organic amine resin salt | Proprietary | 30 | 0.000177103 | 156.143 | ||||
Ethylene glycol | 107-21-1 | 30 | 0.000177103 | 156.143 | ||||
Sand (Proppant) | FTS International | Proppant | Silica Substrate | 14808-60-7 | 100 | 9.57108 | 8,438,390.0 | |
CS-500-SI | FTS International | Scale inhibitor | Ethylene glycol | 107-21-1 | 10 | 0.00250349 | 2207.21 | |
NE-100 | FTS International | Non-emulsifier | 2-Butoxyethanol | 111-76-2 | 10 | 0.00004873 | 42.96 | |
Dodecylbenzenesulfonic acid | 27176-87-0 | 5 | 0.00002436 | 21.48 | ||||
2-Propanol | 67-63-0 | 10 | 0.00004873 | 42.96 | ||||
HVG-1 4.0 | FTS International | Water gelling agent | Isotridecanol, ethoxylated | 9043-30-5 | 2 | 0.00000494 | 4.352 | |
Quartz | 14808-60-7 | 4 | 0.00000987 | 8.704 | ||||
Raffinates, sorption process | 64741-85-1 | 55 | 0.000135742 | 119.678 | ||||
Guar gum | 9000-30-0 | 50 | 0.000123402 | 108.798 | ||||
FRW-900 | FTS International | Friction reducer | Oxyalkylated alcohol A | Proprietary | 5 | 0.00294924 | 2600.22 | |
Alkyl alcohol | Proprietary | 10 | 0.00589849 | 5200.43 | ||||
Hydrotreated light distillate | 64742-47-8 | 30 | 0.0176955 | 15601.3 | ||||
Water | FTS International | Carrier/Base Fluid | Water | 7732-18-5 | 100 | 89.9276 | 79,285,000.0 | |
MC MX 437-5 | Multi-Chem Group LLC | Calcium nitrate solution | Calcium nitrate | 10124-37-5 | 60 | 0.0570381 | 50287.9 | |
Hydrochloric Acid (15%) | FTS International | Acidizing | Hydrochloric Acid | 7647-01-0 | 15 | 0.0478535 | 42190.2 | |
FE-100L | FTS International | Iron control | Citric acid | 77-92-9 | 55 | 0.00105965 | 934.244 |
For data sources see[5]
Stimulation Date | Phase Number | Chemical Agent | Volume (gal) | Treating Pressure (psi) | Breakdown Pressure (psi) |
---|---|---|---|---|---|
2015-10-01 | 1 | Sand | 6,763,680 | 8,687 | 9,014 |
2015-10-01 | 2 | Sand | 6,763,680 | 8,389 | 9,212 |
2015-10-02 | 3 | Sand | 6,763,680 | 8,253 | 8,898 |
2015-10-02 | 4 | Sand | 6,763,680 | 8,154 | 8,230 |
2015-10-02 | 5 | Sand | 6,763,680 | 8,517 | 8,910 |
2015-10-02 | 6 | Sand | 6,763,680 | 7,932 | 8,258 |
2015-10-03 | 7 | Sand | 6,763,680 | 8,077 | 8,799 |
2015-10-03 | 8 | Sand | 6,763,680 | 7,740 | 8,883 |
2015-10-03 | 9 | Sand | 6,763,680 | 8,585 | 9,327 |
2015-10-03 | 10 | Sand | 6,763,680 | 8,182 | 8,811 |
2015-10-04 | 11 | Sand | 6,763,680 | 8,470 | 9,177 |
2015-10-04 | 12 | Sand | 6,763,680 | 8,504 | 9,278 |
2015-10-04 | 13 | Sand | 6,763,680 | 9,163 | 8,986 |
2015-10-04 | 14 | Sand | 6,763,680 | 8,035 | 8,730 |
2015-10-04 | 15 | Sand | 6,763,680 | 8,489 | 8,839 |
2015-10-04 | 16 | Sand | 6,763,680 | 8,455 | 9,234 |
2015-10-05 | 17 | Sand | 6,763,680 | 7,912 | 9,135 |
2015-10-05 | 18 | Sand | 6,763,680 | 7,903 | 8,107 |
2015-10-05 | 19 | Sand | 6,763,680 | 7,680 | 8,952 |
2015-10-05 | 20 | Sand | 6,763,680 | 8,755 | 9,290 |
2015-10-06 | 21 | Sand | 6,763,680 | 8,557 | 9,082 |
2015-10-06 | 22 | Sand | 6,763,680 | 8,003 | 8,730 |
2015-10-06 | 23 | Sand | 6,763,680 | 7,859 | 8,751 |
2015-10-06 | 24 | Sand | 6,763,680 | 7,692 | 8,223 |
2015-10-06 | 25 | Sand | 6,763,680 | 7,692 | 7,931 |
2015-10-06 | 26 | Sand | 6,763,680 | 7,656 | 8,509 |
2015-10-06 | 27 | Sand | 6,763,680 | 7,653 | 8,306 |
2015-10-07 | 28 | Sand | 6,763,680 | 7,756 | 7,956 |
2015-10-07 | 29 | Sand | 6,763,680 | 7,468 | 7,998 |
2015-10-07 | 30 | Sand | 6,763,680 | 8,094 | 9,156 |
2015-10-07 | 31 | Sand | 6,763,680 | 8,589 | 9,070 |
2015-10-07 | 32 | Sand | 6,763,680 | 7,551 | 8,462 |
2015-10-07 | 33 | Sand | 6,763,680 | 7,743 | 8,252 |
2015-10-07 | 34 | Sand | 6,763,680 | 7,401 | 8,003 |
2015-10-08 | 35 | Sand | 6,763,680 | 7,638 | 8,570 |
2015-10-08 | 36 | Sand | 6,763,680 | 7,660 | 9,131 |
2015-10-08 | 37 | Sand | 6,763,680 | 7,628 | 9,248 |
2015-10-08 | 38 | Sand | 6,763,680 | 7,941 | 9,148 |
2015-10-08 | 39 | Sand | 6,763,680 | 7,906 | 9,168 |
2015-10-08 | 40 | Sand | 6,763,680 | 8,279 | 8,881 |
2015-10-08 | 41 | Sand | 6,763,680 | 8,047 | 8,938 |
2015-10-09 | 42 | Sand | 6,763,680 | 7,553 | 8,864 |
For data sources see[6]
Period | Operator Name | Gas Quantity (mcf) | Gas Production Days | Oil Quantity (bbl) | Oil Production Days | Water Quantity (bbl) | Water Production Days |
---|---|---|---|---|---|---|---|
2015 | EQT PROD CO | 0.00 | 0 | 0.00 | 0 | 0.00 | 0 |
2016 | EQT PROD CO | 1,173,069.00 | 144 | 0.00 | 0 | 0.00 | 0 |
2017 | EQT PROD CO | 1,362,977.00 | 362 | 0.00 | 0 | 0.00 | 0 |
2018 | EQT PROD CO | 955,298.00 | 361 | 0.00 | 0 | 0.00 | 0 |
2019 | EQT PROD CO | 789,206.00 | 355 | 0.00 | 0 | 0.00 | 0 |
For data sources see[7]
Period | Operator | Waste Type | Quantity | Disposal Method | Waste Facility ID |
---|---|---|---|---|---|
2015 | EQT PROD CO | Drilling Fluid Waste | 407.00 Bbl | REUSE OTHER THAN ROAD SPREADING | |
2015 | EQT PROD CO | Drill Cuttings | 23.78 Tons | LANDFILL | 100592 |
2015 | EQT PROD CO | Fracturing Fluid Waste | 23.14 Tons | LANDFILL | 100277 |
2015 | EQT PROD CO | Drill Cuttings | 526.64 Tons | LANDFILL | 100663 |
2015 | EQT PROD CO | Fracing Fluid Waste | 770.00 Bbl | REUSE OTHER THAN ROAD SPREADING | |
2015 | EQT PROD CO | Drill Cuttings | 129.57 Tons | LANDFILL | 100172 |
2016 | EQT PROD CO | Produced Fluid | 1,022.00 Bbl | RESIDUAL WASTE PROCESSING FACILITY | WMGR123SW005 |
2016 | EQT PROD CO | Fracturing Fluid Waste | 910.00 Bbl | REUSE OTHER THAN ROAD SPREADING | |
2016 | EQT PROD CO | Produced Fluid | 130.00 Bbl | RESIDUAL WASTE PROCESSING FACILITY | WMGR123SW019 |
2016 | EQT PROD CO | Produced Fluid | 130.00 Bbl | RESIDUAL WASTE PROCESSING FACILITY | WMGR123NW005 |
2016 | EQT PROD CO | Produced Fluid | 19,722.00 Bbl | REUSE OTHER THAN ROAD SPREADING | |
2017 | EQT PROD CO | Produced Fluid | 760.00 Bbl | RESIDUAL WASTE PROCESSING FACILITY | WMGR123SW005 |
2017 | EQT PROD CO | Other Oil & Gas Wastes | 550.00 Bbl | REUSE (AT WELL PAD) | |
2017 | EQT PROD CO | Drilling Fluid Waste | 110.00 Bbl | REUSE (AT WELL PAD) | |
2017 | EQT PROD CO | Produced Fluid | 2,960.00 Bbl | REUSE (AT WELL PAD) | |
2018 | EQT PROD CO | Other Oil & Gas Wastes | 615.05 Bbl | REUSE (AT WELL PAD) | |
2018 | EQT PROD CO | Produced Fluid | 6.42 Bbl | INJECTION DISPOSAL WELL | 34-157-25511 |
2018 | EQT PROD CO | Produced Fluid | 188.96 Bbl | REUSE (AT WELL PAD) | |
2018 | EQT PROD CO | Other Oil & Gas Wastes | 110.75 Bbl | RESIDUAL WASTE PROCESSING FACILITY | WMGR123SW005 |
2018 | EQT PROD CO | Produced Fluid | 549.65 Bbl | RESIDUAL WASTE PROCESSING FACILITY | WMGR123SW019 |
2018 | EQT PROD CO | Produced Fluid | 258.93 Bbl | REUSE AT A WELL PAD OUTSIDE PENNSYLVANIA | |
2018 | EQT PROD CO | Produced Fluid | 200.97 Bbl | RESIDUAL WASTE PROCESSING FACILITY | WMGR123SW005 |
2018 | EQT PROD CO | Other Oil & Gas Wastes | 11.00 Bbl | RESIDUAL WASTE PROCESSING FACILITY | WMGR123NW009 |
2018 | EQT PROD CO | Produced Fluid | 26.17 Bbl | RESIDUAL WASTE PROCESSING FACILITY | WMGR123NW009 |
2019 | EQT PROD CO | Produced Fluid | 37.53 Bbl | SURFACE IMPOUNDMENT | 95-7-37312-19 |
2019 | EQT PROD CO | Produced Fluid | 3.40 Bbl | INJECTION DISPOSAL WELL | 34-119-28776 |
2019 | EQT PROD CO | Other Oil & Gas Wastes | 5.50 Bbl | REUSE AT A WELL PAD OUTSIDE PENNSYLVANIA | |
2019 | EQT PROD CO | Produced Fluid | 11.91 Bbl | RESIDUAL WASTE PROCESSING FACILITY | WMGR123SW005 |
2019 | EQT PROD CO | Other Oil & Gas Wastes | 124.22 Bbl | REUSE (AT WELL PAD) | |
2019 | EQT PROD CO | Produced Fluid | 5.62 Bbl | INJECTION DISPOSAL WELL | 34-059-24202 |
2019 | EQT PROD CO | Produced Fluid | 1,184.43 Bbl | REUSE (AT WELL PAD) | |
2019 | EQT PROD CO | Other Oil & Gas Wastes | 16.50 Bbl | RESIDUAL WASTE PROCESSING FACILITY | WMGR123SW005 |
2019 | EQT PROD CO | Produced Fluid | 37.62 Bbl | REUSE AT A WELL PAD OUTSIDE PENNSYLVANIA | |
2019 | EQT PROD CO | Produced Fluid | 66.33 Bbl | RESIDUAL WASTE PROCESSING FACILITY | WMGR123SW010 |
For data sources see[8]
Inspection ID | Inspection Category | Inspection Date | Inspection Type | Inspection Result | Inspection Comments |
---|---|---|---|---|---|
2361224 | Primary Facility | 2015-04-14 | Drilling/Alteration | No Violations Noted | Alpha Hunter Drilling Rig #4 |
2390231 | Primary Facility | 2015-07-14 | Drilling/Alteration | No Violations Noted | Orion Drilling Rig #17 |
2410193 | Primary Facility | 2015-08-28 | Routine/Complete Inspection | No Violations Noted | On 8/28/15, I performed a routine inspection on the Vivian Harbison site and made the following observations: |
2602682 | Primary Facility | 2017-06-07 | Routine/Complete Inspection | No Violations Noted | |
2685504 | Primary Facility | 2018-01-10 | Administrative/File Review | No Violations Noted | Operator servicing well and preparing containment. |
2700219 | Primary Facility | 2018-02-26 | Routine/Complete Inspection | No Violations Noted | This well has been completed and is now producing. |
2720040 | Primary Facility | 2018-04-19 | Incident- Response to Accident or Event | In Compliance with Policy | On 4/19/18 an incident inspection of the Vivian Harbison Well Site was conducted in response to CTS ID: 333587. The following was observed:
>>On 4/13/18 EQT's Mike Cromley reported a ten gallon spill with cleanup beginning immediately as a vacc truck was present on site at the time of the spill. >>Further communication with operator personnel indicated a spill of 10 gallons of produced water near the offloading point near the production tanks and that the spill cleanup was completed the same day. >>Site inspection found no visible evidence of contamination, cleanup appears to have been fully completed in compliance with policy. |
For data sources see[9]