X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

37-125-27612

Well Details

Well ID: 37-125-27612
Loading map...
Country: United States
State: Pennsylvania
County: Washington
Municipality: North Bethlehem Township
Operator Name: RICE DRILLING B LLC
Well Pad ID:
Farm/Lease Name: CAPTAIN USA 2G
License Status:
Spud Date:
Permit Date: 2015-02-04
Well Type: GAS
Unconventional Well: Y
Configuration: Horizontal Well
Conservation: No
Latitude: 40.096817
Longitude: -80.099203

For data sources see[1][2][3]

Well History

Date Event
2015-02-04 New Permit Application

For data sources see[4]



Inspection Data

Inspections Performed

Inspection ID Inspection Category Inspection Date Inspection Type Inspection Result Inspection Comments
2365944 Primary Facility 2015-04-30 Routine/Complete Inspection No Violations Noted On April 30, 2015, Water Quality Specialist Supervisor John Carson and I inspected the Captain USA site and made the following observations:
2424347 Primary Facility 2015-10-30 Routine/Complete Inspection No Violations Noted
2454231 Primary Facility 2015-11-09 Routine/Complete Inspection No Violations Noted On 11/9/15, I performed a routine complete inspection of the Captain USA well site and made the following observations:
2454520 Primary Facility 2015-11-13 Follow-up Inspection No Violations Noted On 11/13/15, I performed a follow up inspection of the Captain USA well site in response to issues noted in an 11/9/15 inspection of the same site and made the following observations:
2454853 Primary Facility 2015-11-18 Follow-up Inspection No Violations Noted On 11/18/15, I performed a follow up inspection for the Captain USA site and made the following observations:
2473429 Primary Facility 2015-11-04 Complaint Inspection No Violations Noted On 11/4/2015, I performed a complaint response inspection at the Captain USA site in response to reports of increased erosion and sedimentation impacting the waters of the commonwealth as well as possible petroleum contamination.
2476803 Primary Facility 2015-11-10 Complaint Inspection No Violations Noted On 11/10/15, I performed a complaint response inspection of the Captain USA well site accompanied by WQS Bryon Miller and Environmental Trainee John Parry in response to reports of increased erosion and sedimentation impacting the waters of the commonwealth, water samples were taken for UVIR analysis.
2477327 Primary Facility 2015-11-12 Complaint Inspection No Violations Noted On 11/12/15, I performed a complaint response inspection of the Captain USA well site in response to reports of increased erosion and sedimentation affecting the waters of the commonwealth.
2477606 Primary Facility 2015-11-25 Routine/Complete Inspection No Violations Noted On 11/25/15, I performed a routine complete inspection accompanied by Rice representative Jovan Rohena of the Captain USA Well Site in response to a request from the operator for a pre-operation inspection and made the following observations:

-operation inspection could not be completed for the site as the perimeter controls near the entrance including a large diversion ditch were under construction at the time of inspection. No violation. Pre-operation inspection not completed, site not ready for drilling.

    -40 05 32.154N; 80 06 01.818W
     -40 05 30.066N; 80 06 03.768W
     -40 05 44.916N; 80 05 57.714W


2478232 Primary Facility 2015-12-02 Preoperation Inspection No Violations Noted On 12/2/15, I completed a pre-operation inspection for the Captain USA Well Site in response to an operator request and made the following observations:

-operations inspection to be completed.

    -Clay sediments observed in rock lined diversion channel may indicate insufficient lining thickness.  No violation, inspection and remediation recommended.

-accumulating immediately beyond perimeter controls on the northwest side of the area and may be causing accelerated erosion.

    -Samples taken from water pooled on site and from runoff taken for MBAS analysis due to significant observed foaming in the stream channel and in water pooling at site controls.

Conclusion:

2478540 Primary Facility 2015-12-17 Complaint Inspection No Violations Noted On 12/17/15, I performed a complaint response inspection of the Captain USA well site in response to reports of increased erosion and sedimentation.
2478893 Primary Facility 2015-12-22 Complaint Inspection No Violations Noted On 12/22/15, I performed a complaint response inspection of the Captain USA well site in response to reports of increased erosion and sedimentation.
2479422 Primary Facility 2015-12-24 Complaint Inspection No Violations Noted On 12/24/15, I performed a complaint response inspection of the Captain USA well site in response to reports of increased erosion and sedimentation.
2480380 Primary Facility 2015-12-31 Complaint Inspection No Violations Noted On 12/31/15, I performed a complaint response inspection of the Captain USA well site in response to reports of oily material running off of the site and made the following observations:


2481408 Primary Facility 2016-01-21 Follow-up Inspection No Violations Noted On 1/21/16, I performed a follow up inspection of the Captain USA well site accompanied by DEP Engineer Emmanuel Nwaobilo in response to previously observed issues with increased erosion and sedimentation and potential undelineated streams. Snow cover in the area of concerned prevented effective inspection of the site.
2483816 Primary Facility 2016-03-08 Follow-up Inspection No Violations Noted On 3/8/16, I performed a follow up inspection with DEP engineer Emmanuel Nwaobilo for the Captain USA site in response to an ongoing issue with site E&S controls and made the following observations:

•Along the access road, where it crosses the last saddle before the pad, E&S controls have been heavily reinforced partially in response to department recommendations. •Inspection of the area below the reinforced controls found multiple streams and waterways not shown in the site plans or in the original streams and wetlands report for the site. Due to this the site is not in compliance with §102.4(b)(4)(ii),(iv), §102.8(b)(2),(3),(5), and (8), §102.4(b)(5)(v) and §102.5(m)(2)(ii). •Many of the stream channels in the area adjacent to the site appear to be undergoing increased erosion and sedimentation. This is a violation of §102.2(a), (b); §102.11(a)(1),(2) and 35 P.S. § 691.401 •The site was also noted to be in in the drilling/PCSM phase at the time of inspection and primary site construction was completed t

2499185 Primary Facility 2016-06-14 Routine/Partial Inspection No Violations Noted A routine/partial inspection of the well site was conducted.
2530285 Primary Facility 2016-10-05 Incident- Response to Accident or Event In Compliance with Policy Incident response conducted as a result of an operator notification.