X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

37-125-27663

Well Details

Well ID: 37-125-27663
Loading map...
Country: United States
State: Pennsylvania
County: Washington
Municipality: Somerset Township
Operator Name: RICE DRILLING B LLC
Well Pad ID: 152510
Farm/Lease Name: RUMPELSTILTSKIN
License Status: Active
Spud Date: 2015-07-29
Permit Date: 2015-05-05
Well Type: GAS
Unconventional Well: Y
Configuration: Horizontal Well
Conservation: No
Latitude: 40.081944
Longitude: -80.043867

For data sources see[1][2][3]

Well History

Date Event
2015-05-05 New Permit Application
2015-05-07 Performed Spud Operation
2015-08-25 Drilling Completion
2015-09-08 Drilling Completion
2015-12-31 Perforation
2016-01-01 Perforation
2016-01-01 Performed Stage 1 of Stimulation
2016-01-01 Performed Stage 2 of Stimulation
2016-01-01 Performed Stage 3 of Stimulation
2016-01-02 Perforation
2016-01-02 Performed Stage 4 of Stimulation
2016-01-02 Performed Stage 5 of Stimulation
2016-01-02 Performed Stage 6 of Stimulation
2016-01-02 Performed Stage 7 of Stimulation
2016-01-03 Perforation
2016-01-03 Performed Stage 10 of Stimulation
2016-01-03 Performed Stage 8 of Stimulation
2016-01-03 Performed Stage 9 of Stimulation
2016-01-04 Perforation
2016-01-04 Performed Stage 11 of Stimulation
2016-01-04 Performed Stage 12 of Stimulation
2016-01-04 Performed Stage 13 of Stimulation
2016-01-05 Perforation
2016-01-05 Performed Stage 14 of Stimulation
2016-01-05 Performed Stage 15 of Stimulation
2016-01-06 Perforation
2016-01-06 Performed Stage 16 of Stimulation
2016-01-06 Performed Stage 17 of Stimulation
2016-01-06 Performed Stage 18 of Stimulation
2016-01-07 Perforation
2016-01-07 Performed Stage 19 of Stimulation
2016-01-07 Performed Stage 20 of Stimulation
2016-01-07 Performed Stage 21 of Stimulation
2016-01-07 Performed Stage 22 of Stimulation
2016-01-08 Perforation
2016-01-08 Performed Stage 23 of Stimulation
2016-01-08 Performed Stage 24 of Stimulation
2016-01-08 Performed Stage 25 of Stimulation
2016-01-08 Performed Stage 26 of Stimulation
2016-01-08 Performed Stage 27 of Stimulation
2016-01-09 Perforation
2016-01-09 Performed Stage 28 of Stimulation
2016-01-09 Performed Stage 29 of Stimulation
2016-01-09 Performed Stage 30 of Stimulation
2016-01-09 Performed Stage 31 of Stimulation
2016-01-10 Perforation
2016-01-10 Performed Stage 32 of Stimulation
2016-01-10 Performed Stage 33 of Stimulation
2016-01-10 Performed Stage 34 of Stimulation
2016-01-10 Performed Stage 35 of Stimulation
2016-01-11 Perforation
2016-01-11 Performed Stage 36 of Stimulation
2016-01-11 Performed Stage 37 of Stimulation
2016-01-11 Performed Stage 38 of Stimulation
2016-01-11 Performed Stage 39 of Stimulation
2016-01-12 Perforation
2016-01-12 Performed Stage 40 of Stimulation
2016-01-12 Performed Stage 41 of Stimulation
2016-01-12 Performed Stage 42 of Stimulation
2016-01-12 Performed Stage 43 of Stimulation
2016-01-13 Perforation
2016-01-13 Performed Stage 44 of Stimulation
2016-01-13 Performed Stage 45 of Stimulation
2018-07-11 Deviated
2018-07-11 Newly Drilled

For data sources see[4]

Fracking Activities

Fracking Jobs

Job Number Job Start Date Job End Date True Vertical Depth (ft) Total Water Volume (gal) Total Non-Water Volume (gal)
1 2016-01-01 2016-01-13 7,874 16,765,100 0

Fluid Composition Data

Job Number Trade Name Supplier Purpose Ingredient Name CAS Number Additive Percentage by Mass Job Percentage by Mass Mass Used (lb)
1 15% HCL WFT Acid Hydrochloric Acid 7647-01-0 15 0.0363926 57763.1
WIC-641L WFT Iron Control Citric acid 77-92-9 60 0.0017094 2713.19
WFR-66LC WFT Friction Reducers Petroleum distillates, hydrotreated light 64742-47-8 40 0.0218998 34759.8
Sodium Chloride 7647-14-5 20 0.0109499 17379.9
40/70 Premium WFT Proppant Crystalline Silica in the form of Quartz 14808-60-7 100 2.27118 3,604,860.0
Bio- WFT Bactericide 2,2-dibromo-3-nitriloproppionamide 10222-01-2 5 0.000879157 1395.42
Polyethylene Glycol 25322-68-3 65 0.011429 18140.4
Dibromoacetonitrile 3252-43-5 0.5 0.00008792 139.542
Sodium Bromide 7647-15-6 1.5 0.000263747 418.625
100 Mesh WFT Proppant Crystalline Silica in the form of Quartz 14808-60-7 100 9.20871 14,616,300.0
Other Chemicals Acetaldehyde 75-07-0 0 0 0
Cationic Polyacrylamide copolymer Proprietary 0 0 0
Ethylene Oxide 75-21-8 0 0 0
Dioxane 123-91-1 0 0 0
Cinnamaldehyde 104-55-2 0 0 0
Alcohol Ethoxylate Surfactants Proprietary 0 0 0
WSI-648L WFT Inhibitor Ammonia 7664-41-7 25 0.0127028 20162.1
Phosphonic Acid Proprietary 50 0.0254055 40324.2
Ammonium Chloride 12125-02-9 20 0.0101622 16129.7
Methanol 67-56-1 3 0.00152433 2419.45
Aqucar DB 5 WFT Biocide Polyethylene glycol 25322-68-3 75 0.00494597 7850.35
2,2-Dibromo-3-nitrilopropionamide 10222-01-2 5 0.000329731 523.357
Sodium Bromide 7647-15-6 1.5 0.00009892 157.007
Dibromoacetonitrile 3252-43-5 0.5 0.00003297 52.336
Water Rice Energy Carrier / Base Fluid Carrier / Base Fluid - Water 7732-18-5 100 88.1444 139,905,000.0
WAI-251LC WFT Inhibitor Tar bases, quinoline derivs, benzyl chloride-quaternized 72480-70-7 10 0.00004894 77.684
2-Butoxyethanol 111-76-2 10 0.00004894 77.684
1-Octanol 111-87-5 5 0.00002447 38.842
1-Decanol 112-30-1 5 0.00002447 38.842
Triethylphosphate 78-40-0 5 0.00002447 38.842
Isopropyl Alcohol 67-63-0 5 0.00002447 38.842
N,N-Dimethylformamide 68-12-2 20 0.00009789 155.367
Ethoxylated Nonylphenol 68412-54-4 5 0.00002447 38.842
Ethylene Glycol 111-76-2 40 0.000195772 310.734

For data sources see[5]

Stimulation Data

Stimulation Date Phase Number Chemical Agent Volume (gal) Treating Pressure (psi) Breakdown Pressure (psi)
2016-01-01 1 Silica Sand 14,423,850 9,270 9,448
2016-01-01 2 Silica Sand 14,423,850 9,182 9,323
2016-01-01 3 Silica Sand 14,423,850 9,193 9,337
2016-01-02 4 Silica Sand 14,423,850 9,227 9,359
2016-01-02 5 Silica Sand 14,423,850 9,249 9,370
2016-01-02 6 Silica Sand 14,423,850 9,143 9,319
2016-01-02 7 Silica Sand 14,423,850 9,231 9,330
2016-01-03 8 Silica Sand 14,423,850 9,169 9,370
2016-01-03 9 Silica Sand 14,423,850 9,202 9,323
2016-01-03 10 Silica Sand 14,423,850 9,238 9,386
2016-01-04 11 Silica Sand 14,423,850 9,232 9,447
2016-01-04 12 Silica Sand 14,423,850 9,063 9,336
2016-01-04 13 Silica Sand 14,423,850 8,445 9,291
2016-01-05 14 Silica Sand 14,423,850 9,141 9,259
2016-01-05 15 Silica Sand 14,423,850 9,216 9,416
2016-01-06 16 Silica Sand 14,423,850 9,118 9,384
2016-01-06 17 Silica Sand 14,423,850 8,841 9,366
2016-01-06 18 Silica Sand 14,423,850 9,134 9,380
2016-01-07 19 Silica Sand 14,423,850 9,148 9,412
2016-01-07 20 Silica Sand 14,423,850 8,640 9,387
2016-01-07 21 Silica Sand 14,423,850 9,109 9,391
2016-01-07 22 Silica Sand 14,423,850 9,267 9,391
2016-01-08 23 Silica Sand 14,423,850 9,174 9,366
2016-01-08 24 Silica Sand 14,423,850 8,707 9,362
2016-01-08 25 Silica Sand 14,423,850 9,123 9,387
2016-01-08 26 Silica Sand 14,423,850 8,791 9,381
2016-01-08 27 Silica Sand 14,423,850 9,121 9,377
2016-01-09 28 Silica Sand 14,423,850 8,784 9,380
2016-01-09 29 Silica Sand 14,423,850 8,688 9,326
2016-01-09 30 Silica Sand 14,423,850 9,192 9,376
2016-01-09 31 Silica Sand 14,423,850 9,168 9,366
2016-01-10 32 Silica Sand 14,423,850 8,886 9,355
2016-01-10 33 Silica Sand 14,423,850 8,588 9,380
2016-01-10 34 Silica Sand 14,423,850 9,108 9,330
2016-01-10 35 Silica Sand 14,423,850 8,999 9,398
2016-01-11 36 Silica Sand 14,423,850 8,865 9,323
2016-01-11 37 Silica Sand 14,423,850 8,901 9,359
2016-01-11 38 Silica Sand 14,423,850 7,974 8,111
2016-01-11 39 Silica Sand 14,423,850 8,789 9,294
2016-01-12 40 Silica Sand 14,423,850 8,219 9,123
2016-01-12 41 Silica Sand 14,423,850 8,777 9,190
2016-01-12 42 Silica Sand 14,423,850 8,070 9,068
2016-01-12 43 Silica Sand 14,423,850 8,260 8,539
2016-01-13 44 Silica Sand 14,423,850 8,596 9,089
2016-01-13 45 Silica Sand 14,423,850 8,038 9,254

For data sources see[6]

Production Data

Period Operator Name Gas Quantity (mcf) Gas Production Days Oil Quantity (bbl) Oil Production Days Water Quantity (bbl) Water Production Days
2015 RICE DRILLING B LLC 0.00 0 0.00 0 0.00 0
2016 RICE DRILLING B LLC 2,859,256.79 305 0.00 0 0.00 0
2017 RICE DRILLING B LLC 1,701,828.41 365 0.00 0 0.00 0
2018 RICE DRILLING B LLC 1,084,107.00 365 0.00 0 0.00 0
2019 RICE DRILLING B LLC 1,162,388.00 364 0.00 0 0.00 0

For data sources see[7]

Waste Data

Period Operator Waste Type Quantity Disposal Method Waste Facility ID
2015 RICE DRILLING B LLC Drill Cuttings 121.67 Tons LANDFILL PAD059087072
2015 RICE DRILLING B LLC Drilling Fluid Waste 43.75 Bbl REUSE OTHER THAN ROAD SPREADING
2015 RICE DRILLING B LLC Drilling Fluid Waste 1,569.00 Bbl RESIDUAL WASTE PROC FAC (GENERAL PERMIT) WMGR123SW005
2015 RICE DRILLING B LLC Produced Fluid 2,143.00 Bbl RESIDUAL WASTE PROC FAC (GENERAL PERMIT) WMGR123SW005
2015 RICE DRILLING B LLC Drill Cuttings 1,146.10 Tons RESIDUAL WASTE TRANSFER FACILITY 301071
2015 RICE DRILLING B LLC Drill Cuttings 62.29 Tons LANDFILL 100663
2015 RICE DRILLING B LLC Produced Fluid 1,094.50 Bbl REUSE OTHER THAN ROAD SPREADING
2015 RICE DRILLING B LLC Drill Cuttings 473.28 Tons LANDFILL 100172
2016 RICE DRILLING B LLC Fracturing Fluid Waste 16.11 Tons RESIDUAL WASTE PROCESSING FACILITY 2014-541
2016 RICE DRILLING B LLC Other Oil & Gas Wastes 46.62 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123SW019
2016 RICE DRILLING B LLC Produced Fluid 288.90 Bbl CENTRALIZED TREATMENT PLANT FOR RECYCLE WMGR123SW019
2016 RICE DRILLING B LLC Produced Fluid 3,496.83 Bbl RESIDUAL WASTE PROC FAC (GENERAL PERMIT) WMGR123SW005
2016 RICE DRILLING B LLC Fracturing Fluid Waste 27,050.75 Bbl REUSE OTHER THAN ROAD SPREADING
2016 RICE DRILLING B LLC Produced Fluid 742.32 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123SW019
2016 RICE DRILLING B LLC Other Oil & Gas Wastes 433.75 Bbl REUSE OTHER THAN ROAD SPREADING
2016 RICE DRILLING B LLC Fracturing Fluid Waste 432.38 Bbl RESIDUAL WASTE PROC FAC (GENERAL PERMIT) WMGR123SW005
2016 RICE DRILLING B LLC Filter Socks 0.04 Tons RESIDUAL WASTE PROCESSING FACILITY 301280
2016 RICE DRILLING B LLC Synthetic Liner Materials 14.30 Tons LANDFILL 100663
2016 RICE DRILLING B LLC Fracturing Fluid Waste 479.50 Bbl CENTRALIZED TREATMENT PLANT FOR RECYCLE WMGR123SW019
2016 RICE DRILLING B LLC Fracturing Fluid Waste 61.39 Tons LANDFILL 100592
2016 RICE DRILLING B LLC Waste Water Treatment Sludge 7.38 Tons RESIDUAL WASTE PROCESSING FACILITY 2014-541
2016 RICE DRILLING B LLC Other Oil & Gas Wastes 22.50 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123SW005
2016 RICE DRILLING B LLC Produced Fluid 834.02 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123SW005
2016 RICE DRILLING B LLC Produced Fluid 25,250.40 Bbl REUSE OTHER THAN ROAD SPREADING
2017 RICE DRILLING B LLC Produced Fluid 27.57 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123SW019
2017 RICE DRILLING B LLC Other Oil & Gas Wastes 75.75 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123SW005
2017 RICE DRILLING B LLC Other Oil & Gas Wastes 84.83 Bbl REUSE (AT WELL PAD)
2017 RICE DRILLING B LLC Produced Fluid 1,670.23 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123SW005
2017 RICE DRILLING B LLC Filter Socks 0.13 Tons RESIDUAL WASTE PROCESSING FACILITY 301280
2017 RICE DRILLING B LLC Waste Water Treatment Sludge 3.94 Tons RESIDUAL WASTE TRANSFER FACILITY 101532
2017 RICE DRILLING B LLC Produced Fluid 1,538.34 Bbl REUSE (AT WELL PAD)
2018 RICE DRILLING B LLC Other Oil & Gas Wastes 108.50 Bbl REUSE (AT WELL PAD)
2018 RICE DRILLING B LLC Produced Fluid 902.01 Bbl REUSE (AT WELL PAD)
2018 RICE DRILLING B LLC Other Oil & Gas Wastes 13.75 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123SW005
2018 RICE DRILLING B LLC Produced Fluid 171.76 Bbl REUSE AT A WELL PAD OUTSIDE PENNSYLVANIA
2018 RICE DRILLING B LLC Produced Fluid 293.70 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123SW005
2019 RICE DRILLING B LLC Produced Fluid 57.44 Bbl SURFACE IMPOUNDMENT 95-7-37312-19
2019 RICE DRILLING B LLC Other Oil & Gas Wastes 27.50 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123SW005
2019 RICE DRILLING B LLC Produced Fluid 24.76 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123SW019
2019 RICE DRILLING B LLC Other Oil & Gas Wastes 305.00 Bbl REUSE (AT WELL PAD)
2019 RICE DRILLING B LLC Produced Fluid 1,408.70 Bbl REUSE (AT WELL PAD)
2019 RICE DRILLING B LLC Produced Fluid 89.59 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123SW010

For data sources see[8]

Inspection Data

Inspections Performed

Inspection ID Inspection Category Inspection Date Inspection Type Inspection Result Inspection Comments
2368669 Primary Facility 2015-05-11 Drilling/Alteration No Violations Noted Butch’s Rat Hole Services auger rig
2376301 Primary Facility 2015-06-04 Drilling/Alteration No Violations Noted Falcon Drilling Rig #29
2378975 Primary Facility 2015-06-15 Routine/Complete Inspection No Violations Noted Violations linked to the site inspection #2378967
2380212 Primary Facility 2015-06-17 Drilling/Alteration No Violations Noted TTR @ 835'. Rig to set intermediate 9 5/8" to ~ 2300-2400' this Friday or Saturday and then stop drilling activities. They were asked by the department to halt all earth disturbance activities including drilling. NOVIO
2380987 Primary Facility 2015-06-22 Drilling/Alteration No Violations Noted Falcon Drilling Rig #29
2384937 Primary Facility 2015-07-02 Drilling/Alteration No Violations Noted Falcon Drilling Rig #29
2397237 Primary Facility 2015-08-07 Drilling/Alteration No Violations Noted Butch’s Rat Hole Services auger rig
2401747 Primary Facility 2015-08-25 Drilling/Alteration No Violations Noted Falcon Drilling Rig #29
2406719 Primary Facility 2015-09-04 Drilling/Alteration No Violations Noted Patterson-UTI Drilling Rig #349
2407585 Primary Facility 2015-09-15 Drilling/Alteration No Violations Noted Patterson-UTI Drilling Rig #349
2528998 Primary Facility 2016-09-07 Complaint Inspection No Violations Noted On 9/7/2016, I performed a complaint inspection at the Rumpelstiltskin site in response to complaint ID 322302 accompanied by Rice Representative Jonathon Davis and made the following observations:

•Per the Mr. Davis the PCSM construction on the site was temporarily obstructed by larger than estimated amounts of earth needing excavated and hitting bedrock in unexpected areas. Per Mr. Davis a major modification to the permit was being pursued to remediate the situation. •Multiple large areas of the site were unstabilized at the time of inspection; perimeter controls were all in place and appeared functional at the time of inspection. •Necessary site plans and permits were present in the mail box at time of inspection.

2530630 Primary Facility 2016-09-08 Complaint Inspection No Violations Noted On 9/8/16, I performed a complaint inspection associated with the Rumpelstiltskin site in response to complaint ID 322302 and made the following observations:

•I met with Moody’s Water Service at the complainant’s home to collect water samples for 946 analyses. As the complainant was already on supplied water with the well disconnected Moody’s equipment was used to collect and split samples. •Water samples were taken directly from the well after flushing for 10 minutes. •The complainant’s well is located within 1000 feet of the nearest well on site; the wells on the site have initial production reported for February or March of 2016.

2530978 Primary Facility 2016-10-18 Administrative/File Review No Violations Noted On 10/18/16, I performed an administrative inspection associated with the Rumpelstiltskin site in response to complaint ID 322302 and made the following observations:

•WQS Supervisor John Carson and I reviewed the laboratory results for the samples taken 9/8/16 as well as other situational information and found that, due to changes in water quality from predrill samples and the status of the site being within presumption both in time and distance, an impact to the complainant’s water supply is presumed. •It is noted that the operator had already provided an alternative water supply at the time of the 9/8/16 inspection at the request of the complainant.

2746793 Primary Facility 2018-06-28 Routine/Complete Inspection No Violations Noted This well has been completed and is producing. Wells and site appear to be well maintained.
2759632 Primary Facility 2018-07-31 Routine/Partial Inspection No Violations Noted On 7/31/18 a routine partial inspection of the Rumpelstiltskin site was conducted in response to an operator request. The following was observed:

>>EQT Representative Jason Tyler requested a meeting to review plans to remove multiple sections of site CFS at landowner request to allow livestock access. Site vegetation suggests that CFS should be removed independent of landowner request.

>>Site appeared in generally good condition with no noted issues.

2761056 Primary Facility 2018-03-30 Incident- Response to Accident or Event In Compliance with Policy On 3/30/18 an incident inspection was conducted of the Rumpelstiltskin Well Pad in response to a spill reported on 3/28/18 (CTS ID: 333271). The following was observed:

>>The operator reported a spill of less than 20 gallons of glycol.

>>Site inspection found that cleanup had been completed with no indication of residual impact or contamination.

>>Four wells were noted in operation at the time of inspection.

>>Site BMPs showed signs of recent maintenance and fresh stabilization. BMPs were functional but close to capacity.

2856902 Primary Facility 2019-03-21 Routine/Complete Inspection No Violations Noted Act 9 site identification sign installed. Well drilled and equipped for production. Well tag present. Well apparatus,brine tanks and gas production unit appears to be in sound condition.

For data sources see[9]

References