If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 37-125-27663 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":40.081944,"lon":-80.043867,"icon":""}]} |
Country: United States | |
State: Pennsylvania | |
County: Washington | |
Municipality: Somerset Township | |
Operator Name: RICE DRILLING B LLC | |
Well Pad ID: 152510 | |
Farm/Lease Name: RUMPELSTILTSKIN | |
License Status: Active | |
Spud Date: 2015-07-29 | |
Permit Date: 2015-05-05 | |
Well Type: GAS | |
Unconventional Well: Y | |
Configuration: Horizontal Well | |
Conservation: No | |
Latitude: 40.081944 | |
Longitude: -80.043867 |
Date | Event |
---|---|
2015-05-05 | New Permit Application |
2015-05-07 | Performed Spud Operation |
2015-08-25 | Drilling Completion |
2015-09-08 | Drilling Completion |
2015-12-31 | Perforation |
2016-01-01 | Perforation |
2016-01-01 | Performed Stage 1 of Stimulation |
2016-01-01 | Performed Stage 2 of Stimulation |
2016-01-01 | Performed Stage 3 of Stimulation |
2016-01-02 | Perforation |
2016-01-02 | Performed Stage 4 of Stimulation |
2016-01-02 | Performed Stage 5 of Stimulation |
2016-01-02 | Performed Stage 6 of Stimulation |
2016-01-02 | Performed Stage 7 of Stimulation |
2016-01-03 | Perforation |
2016-01-03 | Performed Stage 10 of Stimulation |
2016-01-03 | Performed Stage 8 of Stimulation |
2016-01-03 | Performed Stage 9 of Stimulation |
2016-01-04 | Perforation |
2016-01-04 | Performed Stage 11 of Stimulation |
2016-01-04 | Performed Stage 12 of Stimulation |
2016-01-04 | Performed Stage 13 of Stimulation |
2016-01-05 | Perforation |
2016-01-05 | Performed Stage 14 of Stimulation |
2016-01-05 | Performed Stage 15 of Stimulation |
2016-01-06 | Perforation |
2016-01-06 | Performed Stage 16 of Stimulation |
2016-01-06 | Performed Stage 17 of Stimulation |
2016-01-06 | Performed Stage 18 of Stimulation |
2016-01-07 | Perforation |
2016-01-07 | Performed Stage 19 of Stimulation |
2016-01-07 | Performed Stage 20 of Stimulation |
2016-01-07 | Performed Stage 21 of Stimulation |
2016-01-07 | Performed Stage 22 of Stimulation |
2016-01-08 | Perforation |
2016-01-08 | Performed Stage 23 of Stimulation |
2016-01-08 | Performed Stage 24 of Stimulation |
2016-01-08 | Performed Stage 25 of Stimulation |
2016-01-08 | Performed Stage 26 of Stimulation |
2016-01-08 | Performed Stage 27 of Stimulation |
2016-01-09 | Perforation |
2016-01-09 | Performed Stage 28 of Stimulation |
2016-01-09 | Performed Stage 29 of Stimulation |
2016-01-09 | Performed Stage 30 of Stimulation |
2016-01-09 | Performed Stage 31 of Stimulation |
2016-01-10 | Perforation |
2016-01-10 | Performed Stage 32 of Stimulation |
2016-01-10 | Performed Stage 33 of Stimulation |
2016-01-10 | Performed Stage 34 of Stimulation |
2016-01-10 | Performed Stage 35 of Stimulation |
2016-01-11 | Perforation |
2016-01-11 | Performed Stage 36 of Stimulation |
2016-01-11 | Performed Stage 37 of Stimulation |
2016-01-11 | Performed Stage 38 of Stimulation |
2016-01-11 | Performed Stage 39 of Stimulation |
2016-01-12 | Perforation |
2016-01-12 | Performed Stage 40 of Stimulation |
2016-01-12 | Performed Stage 41 of Stimulation |
2016-01-12 | Performed Stage 42 of Stimulation |
2016-01-12 | Performed Stage 43 of Stimulation |
2016-01-13 | Perforation |
2016-01-13 | Performed Stage 44 of Stimulation |
2016-01-13 | Performed Stage 45 of Stimulation |
2018-07-11 | Deviated |
2018-07-11 | Newly Drilled |
For data sources see[4]
Job Number | Job Start Date | Job End Date | True Vertical Depth (ft) | Total Water Volume (gal) | Total Non-Water Volume (gal) |
---|---|---|---|---|---|
1 | 2016-01-01 | 2016-01-13 | 7,874 | 16,765,100 | 0 |
Job Number | Trade Name | Supplier | Purpose | Ingredient Name | CAS Number | Additive Percentage by Mass | Job Percentage by Mass | Mass Used (lb) |
---|---|---|---|---|---|---|---|---|
1 | 15% HCL | WFT | Acid | Hydrochloric Acid | 7647-01-0 | 15 | 0.0363926 | 57763.1 |
WIC-641L | WFT | Iron Control | Citric acid | 77-92-9 | 60 | 0.0017094 | 2713.19 | |
WFR-66LC | WFT | Friction Reducers | Petroleum distillates, hydrotreated light | 64742-47-8 | 40 | 0.0218998 | 34759.8 | |
Sodium Chloride | 7647-14-5 | 20 | 0.0109499 | 17379.9 | ||||
40/70 Premium | WFT | Proppant | Crystalline Silica in the form of Quartz | 14808-60-7 | 100 | 2.27118 | 3,604,860.0 | |
Bio- | WFT | Bactericide | 2,2-dibromo-3-nitriloproppionamide | 10222-01-2 | 5 | 0.000879157 | 1395.42 | |
Polyethylene Glycol | 25322-68-3 | 65 | 0.011429 | 18140.4 | ||||
Dibromoacetonitrile | 3252-43-5 | 0.5 | 0.00008792 | 139.542 | ||||
Sodium Bromide | 7647-15-6 | 1.5 | 0.000263747 | 418.625 | ||||
100 Mesh | WFT | Proppant | Crystalline Silica in the form of Quartz | 14808-60-7 | 100 | 9.20871 | 14,616,300.0 | |
Other Chemicals | Acetaldehyde | 75-07-0 | 0 | 0 | 0 | |||
Cationic Polyacrylamide copolymer | Proprietary | 0 | 0 | 0 | ||||
Ethylene Oxide | 75-21-8 | 0 | 0 | 0 | ||||
Dioxane | 123-91-1 | 0 | 0 | 0 | ||||
Cinnamaldehyde | 104-55-2 | 0 | 0 | 0 | ||||
Alcohol Ethoxylate Surfactants | Proprietary | 0 | 0 | 0 | ||||
WSI-648L | WFT | Inhibitor | Ammonia | 7664-41-7 | 25 | 0.0127028 | 20162.1 | |
Phosphonic Acid | Proprietary | 50 | 0.0254055 | 40324.2 | ||||
Ammonium Chloride | 12125-02-9 | 20 | 0.0101622 | 16129.7 | ||||
Methanol | 67-56-1 | 3 | 0.00152433 | 2419.45 | ||||
Aqucar DB 5 | WFT | Biocide | Polyethylene glycol | 25322-68-3 | 75 | 0.00494597 | 7850.35 | |
2,2-Dibromo-3-nitrilopropionamide | 10222-01-2 | 5 | 0.000329731 | 523.357 | ||||
Sodium Bromide | 7647-15-6 | 1.5 | 0.00009892 | 157.007 | ||||
Dibromoacetonitrile | 3252-43-5 | 0.5 | 0.00003297 | 52.336 | ||||
Water | Rice Energy | Carrier / Base Fluid | Carrier / Base Fluid - Water | 7732-18-5 | 100 | 88.1444 | 139,905,000.0 | |
WAI-251LC | WFT | Inhibitor | Tar bases, quinoline derivs, benzyl chloride-quaternized | 72480-70-7 | 10 | 0.00004894 | 77.684 | |
2-Butoxyethanol | 111-76-2 | 10 | 0.00004894 | 77.684 | ||||
1-Octanol | 111-87-5 | 5 | 0.00002447 | 38.842 | ||||
1-Decanol | 112-30-1 | 5 | 0.00002447 | 38.842 | ||||
Triethylphosphate | 78-40-0 | 5 | 0.00002447 | 38.842 | ||||
Isopropyl Alcohol | 67-63-0 | 5 | 0.00002447 | 38.842 | ||||
N,N-Dimethylformamide | 68-12-2 | 20 | 0.00009789 | 155.367 | ||||
Ethoxylated Nonylphenol | 68412-54-4 | 5 | 0.00002447 | 38.842 | ||||
Ethylene Glycol | 111-76-2 | 40 | 0.000195772 | 310.734 |
For data sources see[5]
Stimulation Date | Phase Number | Chemical Agent | Volume (gal) | Treating Pressure (psi) | Breakdown Pressure (psi) |
---|---|---|---|---|---|
2016-01-01 | 1 | Silica Sand | 14,423,850 | 9,270 | 9,448 |
2016-01-01 | 2 | Silica Sand | 14,423,850 | 9,182 | 9,323 |
2016-01-01 | 3 | Silica Sand | 14,423,850 | 9,193 | 9,337 |
2016-01-02 | 4 | Silica Sand | 14,423,850 | 9,227 | 9,359 |
2016-01-02 | 5 | Silica Sand | 14,423,850 | 9,249 | 9,370 |
2016-01-02 | 6 | Silica Sand | 14,423,850 | 9,143 | 9,319 |
2016-01-02 | 7 | Silica Sand | 14,423,850 | 9,231 | 9,330 |
2016-01-03 | 8 | Silica Sand | 14,423,850 | 9,169 | 9,370 |
2016-01-03 | 9 | Silica Sand | 14,423,850 | 9,202 | 9,323 |
2016-01-03 | 10 | Silica Sand | 14,423,850 | 9,238 | 9,386 |
2016-01-04 | 11 | Silica Sand | 14,423,850 | 9,232 | 9,447 |
2016-01-04 | 12 | Silica Sand | 14,423,850 | 9,063 | 9,336 |
2016-01-04 | 13 | Silica Sand | 14,423,850 | 8,445 | 9,291 |
2016-01-05 | 14 | Silica Sand | 14,423,850 | 9,141 | 9,259 |
2016-01-05 | 15 | Silica Sand | 14,423,850 | 9,216 | 9,416 |
2016-01-06 | 16 | Silica Sand | 14,423,850 | 9,118 | 9,384 |
2016-01-06 | 17 | Silica Sand | 14,423,850 | 8,841 | 9,366 |
2016-01-06 | 18 | Silica Sand | 14,423,850 | 9,134 | 9,380 |
2016-01-07 | 19 | Silica Sand | 14,423,850 | 9,148 | 9,412 |
2016-01-07 | 20 | Silica Sand | 14,423,850 | 8,640 | 9,387 |
2016-01-07 | 21 | Silica Sand | 14,423,850 | 9,109 | 9,391 |
2016-01-07 | 22 | Silica Sand | 14,423,850 | 9,267 | 9,391 |
2016-01-08 | 23 | Silica Sand | 14,423,850 | 9,174 | 9,366 |
2016-01-08 | 24 | Silica Sand | 14,423,850 | 8,707 | 9,362 |
2016-01-08 | 25 | Silica Sand | 14,423,850 | 9,123 | 9,387 |
2016-01-08 | 26 | Silica Sand | 14,423,850 | 8,791 | 9,381 |
2016-01-08 | 27 | Silica Sand | 14,423,850 | 9,121 | 9,377 |
2016-01-09 | 28 | Silica Sand | 14,423,850 | 8,784 | 9,380 |
2016-01-09 | 29 | Silica Sand | 14,423,850 | 8,688 | 9,326 |
2016-01-09 | 30 | Silica Sand | 14,423,850 | 9,192 | 9,376 |
2016-01-09 | 31 | Silica Sand | 14,423,850 | 9,168 | 9,366 |
2016-01-10 | 32 | Silica Sand | 14,423,850 | 8,886 | 9,355 |
2016-01-10 | 33 | Silica Sand | 14,423,850 | 8,588 | 9,380 |
2016-01-10 | 34 | Silica Sand | 14,423,850 | 9,108 | 9,330 |
2016-01-10 | 35 | Silica Sand | 14,423,850 | 8,999 | 9,398 |
2016-01-11 | 36 | Silica Sand | 14,423,850 | 8,865 | 9,323 |
2016-01-11 | 37 | Silica Sand | 14,423,850 | 8,901 | 9,359 |
2016-01-11 | 38 | Silica Sand | 14,423,850 | 7,974 | 8,111 |
2016-01-11 | 39 | Silica Sand | 14,423,850 | 8,789 | 9,294 |
2016-01-12 | 40 | Silica Sand | 14,423,850 | 8,219 | 9,123 |
2016-01-12 | 41 | Silica Sand | 14,423,850 | 8,777 | 9,190 |
2016-01-12 | 42 | Silica Sand | 14,423,850 | 8,070 | 9,068 |
2016-01-12 | 43 | Silica Sand | 14,423,850 | 8,260 | 8,539 |
2016-01-13 | 44 | Silica Sand | 14,423,850 | 8,596 | 9,089 |
2016-01-13 | 45 | Silica Sand | 14,423,850 | 8,038 | 9,254 |
For data sources see[6]
Period | Operator Name | Gas Quantity (mcf) | Gas Production Days | Oil Quantity (bbl) | Oil Production Days | Water Quantity (bbl) | Water Production Days |
---|---|---|---|---|---|---|---|
2015 | RICE DRILLING B LLC | 0.00 | 0 | 0.00 | 0 | 0.00 | 0 |
2016 | RICE DRILLING B LLC | 2,859,256.79 | 305 | 0.00 | 0 | 0.00 | 0 |
2017 | RICE DRILLING B LLC | 1,701,828.41 | 365 | 0.00 | 0 | 0.00 | 0 |
2018 | RICE DRILLING B LLC | 1,084,107.00 | 365 | 0.00 | 0 | 0.00 | 0 |
2019 | RICE DRILLING B LLC | 1,162,388.00 | 364 | 0.00 | 0 | 0.00 | 0 |
For data sources see[7]
Period | Operator | Waste Type | Quantity | Disposal Method | Waste Facility ID |
---|---|---|---|---|---|
2015 | RICE DRILLING B LLC | Drill Cuttings | 121.67 Tons | LANDFILL | PAD059087072 |
2015 | RICE DRILLING B LLC | Drilling Fluid Waste | 43.75 Bbl | REUSE OTHER THAN ROAD SPREADING | |
2015 | RICE DRILLING B LLC | Drilling Fluid Waste | 1,569.00 Bbl | RESIDUAL WASTE PROC FAC (GENERAL PERMIT) | WMGR123SW005 |
2015 | RICE DRILLING B LLC | Produced Fluid | 2,143.00 Bbl | RESIDUAL WASTE PROC FAC (GENERAL PERMIT) | WMGR123SW005 |
2015 | RICE DRILLING B LLC | Drill Cuttings | 1,146.10 Tons | RESIDUAL WASTE TRANSFER FACILITY | 301071 |
2015 | RICE DRILLING B LLC | Drill Cuttings | 62.29 Tons | LANDFILL | 100663 |
2015 | RICE DRILLING B LLC | Produced Fluid | 1,094.50 Bbl | REUSE OTHER THAN ROAD SPREADING | |
2015 | RICE DRILLING B LLC | Drill Cuttings | 473.28 Tons | LANDFILL | 100172 |
2016 | RICE DRILLING B LLC | Fracturing Fluid Waste | 16.11 Tons | RESIDUAL WASTE PROCESSING FACILITY | 2014-541 |
2016 | RICE DRILLING B LLC | Other Oil & Gas Wastes | 46.62 Bbl | RESIDUAL WASTE PROCESSING FACILITY | WMGR123SW019 |
2016 | RICE DRILLING B LLC | Produced Fluid | 288.90 Bbl | CENTRALIZED TREATMENT PLANT FOR RECYCLE | WMGR123SW019 |
2016 | RICE DRILLING B LLC | Produced Fluid | 3,496.83 Bbl | RESIDUAL WASTE PROC FAC (GENERAL PERMIT) | WMGR123SW005 |
2016 | RICE DRILLING B LLC | Fracturing Fluid Waste | 27,050.75 Bbl | REUSE OTHER THAN ROAD SPREADING | |
2016 | RICE DRILLING B LLC | Produced Fluid | 742.32 Bbl | RESIDUAL WASTE PROCESSING FACILITY | WMGR123SW019 |
2016 | RICE DRILLING B LLC | Other Oil & Gas Wastes | 433.75 Bbl | REUSE OTHER THAN ROAD SPREADING | |
2016 | RICE DRILLING B LLC | Fracturing Fluid Waste | 432.38 Bbl | RESIDUAL WASTE PROC FAC (GENERAL PERMIT) | WMGR123SW005 |
2016 | RICE DRILLING B LLC | Filter Socks | 0.04 Tons | RESIDUAL WASTE PROCESSING FACILITY | 301280 |
2016 | RICE DRILLING B LLC | Synthetic Liner Materials | 14.30 Tons | LANDFILL | 100663 |
2016 | RICE DRILLING B LLC | Fracturing Fluid Waste | 479.50 Bbl | CENTRALIZED TREATMENT PLANT FOR RECYCLE | WMGR123SW019 |
2016 | RICE DRILLING B LLC | Fracturing Fluid Waste | 61.39 Tons | LANDFILL | 100592 |
2016 | RICE DRILLING B LLC | Waste Water Treatment Sludge | 7.38 Tons | RESIDUAL WASTE PROCESSING FACILITY | 2014-541 |
2016 | RICE DRILLING B LLC | Other Oil & Gas Wastes | 22.50 Bbl | RESIDUAL WASTE PROCESSING FACILITY | WMGR123SW005 |
2016 | RICE DRILLING B LLC | Produced Fluid | 834.02 Bbl | RESIDUAL WASTE PROCESSING FACILITY | WMGR123SW005 |
2016 | RICE DRILLING B LLC | Produced Fluid | 25,250.40 Bbl | REUSE OTHER THAN ROAD SPREADING | |
2017 | RICE DRILLING B LLC | Produced Fluid | 27.57 Bbl | RESIDUAL WASTE PROCESSING FACILITY | WMGR123SW019 |
2017 | RICE DRILLING B LLC | Other Oil & Gas Wastes | 75.75 Bbl | RESIDUAL WASTE PROCESSING FACILITY | WMGR123SW005 |
2017 | RICE DRILLING B LLC | Other Oil & Gas Wastes | 84.83 Bbl | REUSE (AT WELL PAD) | |
2017 | RICE DRILLING B LLC | Produced Fluid | 1,670.23 Bbl | RESIDUAL WASTE PROCESSING FACILITY | WMGR123SW005 |
2017 | RICE DRILLING B LLC | Filter Socks | 0.13 Tons | RESIDUAL WASTE PROCESSING FACILITY | 301280 |
2017 | RICE DRILLING B LLC | Waste Water Treatment Sludge | 3.94 Tons | RESIDUAL WASTE TRANSFER FACILITY | 101532 |
2017 | RICE DRILLING B LLC | Produced Fluid | 1,538.34 Bbl | REUSE (AT WELL PAD) | |
2018 | RICE DRILLING B LLC | Other Oil & Gas Wastes | 108.50 Bbl | REUSE (AT WELL PAD) | |
2018 | RICE DRILLING B LLC | Produced Fluid | 902.01 Bbl | REUSE (AT WELL PAD) | |
2018 | RICE DRILLING B LLC | Other Oil & Gas Wastes | 13.75 Bbl | RESIDUAL WASTE PROCESSING FACILITY | WMGR123SW005 |
2018 | RICE DRILLING B LLC | Produced Fluid | 171.76 Bbl | REUSE AT A WELL PAD OUTSIDE PENNSYLVANIA | |
2018 | RICE DRILLING B LLC | Produced Fluid | 293.70 Bbl | RESIDUAL WASTE PROCESSING FACILITY | WMGR123SW005 |
2019 | RICE DRILLING B LLC | Produced Fluid | 57.44 Bbl | SURFACE IMPOUNDMENT | 95-7-37312-19 |
2019 | RICE DRILLING B LLC | Other Oil & Gas Wastes | 27.50 Bbl | RESIDUAL WASTE PROCESSING FACILITY | WMGR123SW005 |
2019 | RICE DRILLING B LLC | Produced Fluid | 24.76 Bbl | RESIDUAL WASTE PROCESSING FACILITY | WMGR123SW019 |
2019 | RICE DRILLING B LLC | Other Oil & Gas Wastes | 305.00 Bbl | REUSE (AT WELL PAD) | |
2019 | RICE DRILLING B LLC | Produced Fluid | 1,408.70 Bbl | REUSE (AT WELL PAD) | |
2019 | RICE DRILLING B LLC | Produced Fluid | 89.59 Bbl | RESIDUAL WASTE PROCESSING FACILITY | WMGR123SW010 |
For data sources see[8]
Inspection ID | Inspection Category | Inspection Date | Inspection Type | Inspection Result | Inspection Comments |
---|---|---|---|---|---|
2368669 | Primary Facility | 2015-05-11 | Drilling/Alteration | No Violations Noted | Butch’s Rat Hole Services auger rig |
2376301 | Primary Facility | 2015-06-04 | Drilling/Alteration | No Violations Noted | Falcon Drilling Rig #29 |
2378975 | Primary Facility | 2015-06-15 | Routine/Complete Inspection | No Violations Noted | Violations linked to the site inspection #2378967 |
2380212 | Primary Facility | 2015-06-17 | Drilling/Alteration | No Violations Noted | TTR @ 835'. Rig to set intermediate 9 5/8" to ~ 2300-2400' this Friday or Saturday and then stop drilling activities. They were asked by the department to halt all earth disturbance activities including drilling. NOVIO |
2380987 | Primary Facility | 2015-06-22 | Drilling/Alteration | No Violations Noted | Falcon Drilling Rig #29 |
2384937 | Primary Facility | 2015-07-02 | Drilling/Alteration | No Violations Noted | Falcon Drilling Rig #29 |
2397237 | Primary Facility | 2015-08-07 | Drilling/Alteration | No Violations Noted | Butch’s Rat Hole Services auger rig |
2401747 | Primary Facility | 2015-08-25 | Drilling/Alteration | No Violations Noted | Falcon Drilling Rig #29 |
2406719 | Primary Facility | 2015-09-04 | Drilling/Alteration | No Violations Noted | Patterson-UTI Drilling Rig #349 |
2407585 | Primary Facility | 2015-09-15 | Drilling/Alteration | No Violations Noted | Patterson-UTI Drilling Rig #349 |
2528998 | Primary Facility | 2016-09-07 | Complaint Inspection | No Violations Noted | On 9/7/2016, I performed a complaint inspection at the Rumpelstiltskin site in response to complaint ID 322302 accompanied by Rice Representative Jonathon Davis and made the following observations:
•Per the Mr. Davis the PCSM construction on the site was temporarily obstructed by larger than estimated amounts of earth needing excavated and hitting bedrock in unexpected areas. Per Mr. Davis a major modification to the permit was being pursued to remediate the situation. •Multiple large areas of the site were unstabilized at the time of inspection; perimeter controls were all in place and appeared functional at the time of inspection. •Necessary site plans and permits were present in the mail box at time of inspection. |
2530630 | Primary Facility | 2016-09-08 | Complaint Inspection | No Violations Noted | On 9/8/16, I performed a complaint inspection associated with the Rumpelstiltskin site in response to complaint ID 322302 and made the following observations:
•I met with Moody’s Water Service at the complainant’s home to collect water samples for 946 analyses. As the complainant was already on supplied water with the well disconnected Moody’s equipment was used to collect and split samples. •Water samples were taken directly from the well after flushing for 10 minutes. •The complainant’s well is located within 1000 feet of the nearest well on site; the wells on the site have initial production reported for February or March of 2016. |
2530978 | Primary Facility | 2016-10-18 | Administrative/File Review | No Violations Noted | On 10/18/16, I performed an administrative inspection associated with the Rumpelstiltskin site in response to complaint ID 322302 and made the following observations:
•WQS Supervisor John Carson and I reviewed the laboratory results for the samples taken 9/8/16 as well as other situational information and found that, due to changes in water quality from predrill samples and the status of the site being within presumption both in time and distance, an impact to the complainant’s water supply is presumed. •It is noted that the operator had already provided an alternative water supply at the time of the 9/8/16 inspection at the request of the complainant. |
2746793 | Primary Facility | 2018-06-28 | Routine/Complete Inspection | No Violations Noted | This well has been completed and is producing. Wells and site appear to be well maintained. |
2759632 | Primary Facility | 2018-07-31 | Routine/Partial Inspection | No Violations Noted | On 7/31/18 a routine partial inspection of the Rumpelstiltskin site was conducted in response to an operator request. The following was observed:
>>EQT Representative Jason Tyler requested a meeting to review plans to remove multiple sections of site CFS at landowner request to allow livestock access. Site vegetation suggests that CFS should be removed independent of landowner request. >>Site appeared in generally good condition with no noted issues. |
2761056 | Primary Facility | 2018-03-30 | Incident- Response to Accident or Event | In Compliance with Policy | On 3/30/18 an incident inspection was conducted of the Rumpelstiltskin Well Pad in response to a spill reported on 3/28/18 (CTS ID: 333271). The following was observed:
>>The operator reported a spill of less than 20 gallons of glycol. >>Site inspection found that cleanup had been completed with no indication of residual impact or contamination. >>Four wells were noted in operation at the time of inspection. >>Site BMPs showed signs of recent maintenance and fresh stabilization. BMPs were functional but close to capacity. |
2856902 | Primary Facility | 2019-03-21 | Routine/Complete Inspection | No Violations Noted | Act 9 site identification sign installed. Well drilled and equipped for production. Well tag present. Well apparatus,brine tanks and gas production unit appears to be in sound condition. |
For data sources see[9]