If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 37-125-27698 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":40.19035,"lon":-80.163831,"icon":""}]} |
Country: United States | |
State: Pennsylvania | |
County: Washington | |
Municipality: North Strabane Township | |
Operator Name: RICE DRILLING B LLC | |
Well Pad ID: 152590 | |
Farm/Lease Name: HABANERO | |
License Status: | |
Spud Date: | |
Permit Date: 2015-08-04 | |
Well Type: GAS | |
Unconventional Well: Y | |
Configuration: Horizontal Well | |
Conservation: No | |
Latitude: 40.190350 | |
Longitude: -80.163831 |
Date | Event |
---|---|
2015-08-04 | New Permit Application |
2015-09-08 | Performed Spud Operation |
2015-12-08 | New Permit Application |
For data sources see[4]
Period | Operator Name | Gas Quantity (mcf) | Gas Production Days | Oil Quantity (bbl) | Oil Production Days | Water Quantity (bbl) | Water Production Days |
---|---|---|---|---|---|---|---|
2015 | RICE DRILLING B LLC | 0.00 | 0 | 0.00 | 0 | 0.00 | 0 |
2016 | RICE DRILLING B LLC | 459,856.21 | 61 | 0.00 | 0 | 0.00 | 0 |
2017 | RICE DRILLING B LLC | 2,745,265.66 | 337 | 0.00 | 0 | 0.00 | 0 |
2018 | RICE DRILLING B LLC | 858,052.00 | 168 | 0.00 | 0 | 0.00 | 0 |
2019 | RICE DRILLING B LLC | 1,513,352.00 | 299 | 0.00 | 0 | 0.00 | 0 |
For data sources see[5]
Period | Operator | Waste Type | Quantity | Disposal Method | Waste Facility ID |
---|---|---|---|---|---|
2015 | RICE DRILLING B LLC | Drilling Fluid Waste | 34.17 Bbl | REUSE OTHER THAN ROAD SPREADING | |
2015 | RICE DRILLING B LLC | Drilling Fluid Waste | 1,338.33 Bbl | RESIDUAL WASTE PROC FAC (GENERAL PERMIT) | WMGR123SW005 |
2015 | RICE DRILLING B LLC | Drill Cuttings | 516.28 Tons | LANDFILL | 06-08438 |
2015 | RICE DRILLING B LLC | Drill Cuttings | 67.77 Tons | RESIDUAL WASTE TRANSFER FACILITY | 301071 |
2015 | RICE DRILLING B LLC | Drill Cuttings | 42.59 Tons | LANDFILL | PAD059087072 |
2015 | RICE DRILLING B LLC | Produced Fluid | 260.33 Bbl | REUSE OTHER THAN ROAD SPREADING | |
2015 | RICE DRILLING B LLC | Drill Cuttings | 481.11 Tons | LANDFILL | 100172 |
2016 | RICE DRILLING B LLC | Fracturing Fluid Waste | 4.29 Tons | RESIDUAL WASTE PROCESSING FACILITY | 2014-541 |
2016 | RICE DRILLING B LLC | Other Oil & Gas Wastes | 3,485.05 Bbl | REUSE OTHER THAN ROAD SPREADING | |
2016 | RICE DRILLING B LLC | Fracturing Fluid Waste | 3,633.91 Bbl | REUSE OTHER THAN ROAD SPREADING | |
2016 | RICE DRILLING B LLC | Drilling Fluid Waste | 25.00 Bbl | RESIDUAL WASTE PROC FAC (GENERAL PERMIT) | WMGR123SW005 |
2016 | RICE DRILLING B LLC | Other Oil & Gas Wastes | 204.17 Bbl | RESIDUAL WASTE PROCESSING FACILITY | WMGR123SW005 |
2016 | RICE DRILLING B LLC | Produced Fluid | 29.17 Bbl | CENTRALIZED TREATMENT PLANT FOR RECYCLE | WMGR123SW019 |
2016 | RICE DRILLING B LLC | Produced Fluid | 10,434.04 Bbl | REUSE OTHER THAN ROAD SPREADING | |
2016 | RICE DRILLING B LLC | Fracturing Fluid Waste | 26.77 Tons | LANDFILL | 100620 |
2016 | RICE DRILLING B LLC | Fracturing Fluid Waste | 11,521.75 Bbl | RESIDUAL WASTE PROCESSING FACILITY | WMGR123SW005 |
2016 | RICE DRILLING B LLC | Waste Water Treatment Sludge | 8.85 Tons | RESIDUAL WASTE PROCESSING FACILITY | 2014-541 |
2016 | RICE DRILLING B LLC | Produced Fluid | 743.99 Bbl | RESIDUAL WASTE PROCESSING FACILITY | WMGR123SW005 |
2016 | RICE DRILLING B LLC | Servicing Fluid | 1.54 Tons | LANDFILL | 100172 |
2016 | RICE DRILLING B LLC | Synthetic Liner Materials | 9.59 Tons | LANDFILL | 100663 |
2017 | RICE DRILLING B LLC | Soil Contaminated by Oil & Gas Related Spills | 0.48 Tons | LANDFILL | 100663 |
2017 | RICE DRILLING B LLC | Soil Contaminated by Oil | 0.48 Tons | LANDFILL | 100663 |
2017 | RICE DRILLING B LLC | Other Oil & Gas Wastes | 78.50 Bbl | REUSE (AT WELL PAD) | |
2017 | RICE DRILLING B LLC | Produced Fluid | 90.89 Bbl | RESIDUAL WASTE PROCESSING FACILITY | WMGR123SW019 |
2017 | RICE DRILLING B LLC | Produced Fluid | 2,223.90 Bbl | REUSE (AT WELL PAD) | |
2017 | RICE DRILLING B LLC | Produced Fluid | 36.33 Bbl | INJECTION DISPOSAL WELL | 34-059-24202 |
2017 | RICE DRILLING B LLC | Other Oil & Gas Wastes | 34.23 Bbl | RESIDUAL WASTE PROCESSING FACILITY | WMGR123SW005 |
2017 | RICE DRILLING B LLC | Produced Fluid | 3,714.49 Bbl | RESIDUAL WASTE PROCESSING FACILITY | WMGR123SW005 |
2018 | RICE DRILLING B LLC | Servicing Fluid | 11.43 Bbl | REUSE (AT WELL PAD) | |
2018 | RICE DRILLING B LLC | Produced Fluid | 100.64 Bbl | RESIDUAL WASTE PROCESSING FACILITY | WMGR123SW005 |
2018 | RICE DRILLING B LLC | Produced Fluid | 76.69 Bbl | REUSE AT A WELL PAD OUTSIDE PENNSYLVANIA | |
2018 | RICE DRILLING B LLC | Other Oil & Gas Wastes | 84.04 Bbl | REUSE (AT WELL PAD) | |
2018 | RICE DRILLING B LLC | Other Oil & Gas Wastes | 9.17 Bbl | RESIDUAL WASTE PROCESSING FACILITY | WMGR123SW005 |
2018 | RICE DRILLING B LLC | Servicing Fluid | 15.71 Bbl | REUSE AT A WELL PAD OUTSIDE PENNSYLVANIA | |
2018 | RICE DRILLING B LLC | Produced Fluid | 295.90 Bbl | REUSE (AT WELL PAD) | |
2018 | RICE DRILLING B LLC | Other Oil & Gas Wastes | 10.83 Bbl | REUSE AT A WELL PAD OUTSIDE PENNSYLVANIA | |
2019 | RICE DRILLING B LLC | Other Oil & Gas Wastes | 41.43 Bbl | RESIDUAL WASTE PROCESSING FACILITY | WMGR123SW005 |
2019 | RICE DRILLING B LLC | Produced Fluid | 27.55 Bbl | SURFACE IMPOUNDMENT | 95-7-37312-19 |
2019 | RICE DRILLING B LLC | Other Oil & Gas Wastes | 226.14 Bbl | REUSE (AT WELL PAD) | |
2019 | RICE DRILLING B LLC | Produced Fluid | 760.67 Bbl | REUSE (AT WELL PAD) | |
2019 | RICE DRILLING B LLC | Produced Fluid | 155.74 Bbl | RESIDUAL WASTE PROCESSING FACILITY | WMGR123SW010 |
2019 | RICE DRILLING B LLC | Produced Fluid | 154.88 Bbl | RESIDUAL WASTE PROCESSING FACILITY | WMGR123SW005 |
2019 | RICE DRILLING B LLC | Other Oil & Gas Wastes | 15.71 Bbl | REUSE AT A WELL PAD OUTSIDE PENNSYLVANIA | |
2019 | RICE DRILLING B LLC | Other Oil & Gas Wastes | 192.86 Bbl | INJECTION DISPOSAL WELL | 34-059-24202 |
2019 | RICE DRILLING B LLC | Produced Fluid | 52.12 Bbl | REUSE AT A WELL PAD OUTSIDE PENNSYLVANIA |
For data sources see[6]
Inspection ID | Inspection Category | Inspection Date | Inspection Type | Inspection Result | Inspection Comments |
---|---|---|---|---|---|
2406750 | Primary Facility | 2015-09-14 | Drilling/Alteration | No Violations Noted | Butch’s Rat Hole Services auger rig |
2411445 | Primary Facility | 2015-09-30 | Preoperation Inspection | No Violations Noted | |
2414610 | Primary Facility | 2015-10-08 | Drilling/Alteration | No Violations Noted | Falcon Drilling Rig #29 |
2415580 | Primary Facility | 2015-10-14 | Drilling/Alteration | No Violations Noted | Falcon Drilling Rig #29 |
2418119 | Primary Facility | 2015-10-22 | Drilling/Alteration | No Violations Noted | Falcon Drilling Rig #29 |
2431969 | Primary Facility | 2015-12-10 | Drilling/Alteration | No Violations Noted | Patterson-UTI Drilling Rig #349 |
2518479 | Primary Facility | 2016-09-06 | Routine/Complete Inspection | No Violations Noted | |
2711922 | Primary Facility | 2018-03-29 | Routine/Complete Inspection | No Violations Noted | Today I conducted a routine inspection at the Habanero well pad and the following was observed.
Proper signs were displayed identifying the site. The site was stabilized with thick vegetation no erosion observed outside of the LOD. The well heads were maintained, no leaks or fluids around well head. The production tanks were in good condition no leaks , rust or defects observed. Secondary containment for the site was intact and maintained. |
2711924 | Primary Facility | 2018-03-29 | Routine/Complete Inspection | No Violations Noted | Today I conducted a routine inspection at the Habanero well pad and the following was observed.
Proper signs were displayed identifying the site. The site was stabilized with thick vegetation no erosion observed outside of the LOD. The well heads were maintained, no leaks or fluids around well head. The production tanks were in good condition no leaks , rust or defects observed. Secondary containment for the site was intact and maintained. |
2767777 | Primary Facility | 2018-08-27 | Routine/Complete Inspection | No Violations Noted | Well is shut in. Consolidated Wellsite Services on site and has pulled tubing. |
2816623 | Primary Facility | 2018-12-17 | Routine/Complete Inspection | No Violations Noted | This well appears to be in good condition and well maintained. Operator representative informed the Department that this well is temporarily shut in. |
For data sources see[7]