X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

37-125-27792

Well Details

Well ID: 37-125-27792
Loading map...
Country: United States
State: Pennsylvania
County: Washington
Municipality: Somerset Township
Operator Name: RICE DRILLING B LLC
Well Pad ID: 152253
Farm/Lease Name: SHOTSKI
License Status:
Spud Date: 2016-03-02
Permit Date: 2015-12-01
Well Type: GAS
Unconventional Well: Y
Configuration: Horizontal Well
Conservation: No
Latitude: 40.126078
Longitude: -80.049461

For data sources see[1][2][3]

Well History

Date Event
Deviated
Newly Drilled
2015-12-01 New Permit Application
2016-02-22 Performed Spud Operation
2016-04-11 Drilling Completion
2016-07-22 Drilling Completion

For data sources see[4]


Production Data

Period Operator Name Gas Quantity (mcf) Gas Production Days Oil Quantity (bbl) Oil Production Days Water Quantity (bbl) Water Production Days
2016 RICE DRILLING B LLC 0.00 0 0.00 0 0.00 0
2017 RICE DRILLING B LLC 2,357,512.72 258 0.00 0 0.00 0
2018 RICE DRILLING B LLC 1,953,686.00 365 0.00 0 0.00 0
2019 RICE DRILLING B LLC 1,035,356.00 285 0.00 0 0.00 0

For data sources see[5]

Waste Data

Period Operator Waste Type Quantity Disposal Method Waste Facility ID
2016 RICE DRILLING B LLC Other Oil & Gas Wastes 517.50 Bbl REUSE OTHER THAN ROAD SPREADING
2016 RICE DRILLING B LLC Other Oil & Gas Wastes 20.64 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123SW019
2016 RICE DRILLING B LLC Fracturing Fluid Waste 10.00 Bbl REUSE OTHER THAN ROAD SPREADING
2016 RICE DRILLING B LLC Drilling Fluid Waste 565.60 Bbl RESIDUAL WASTE PROC FAC (GENERAL PERMIT) WMGR123SW005
2016 RICE DRILLING B LLC Other Oil & Gas Wastes 174.20 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123SW005
2016 RICE DRILLING B LLC Drill Cuttings 762.24 Tons LANDFILL 100620
2016 RICE DRILLING B LLC Produced Fluid 29.00 Bbl CENTRALIZED TREATMENT PLANT FOR RECYCLE WMGR123SW019
2016 RICE DRILLING B LLC Produced Fluid 459.68 Bbl REUSE OTHER THAN ROAD SPREADING
2016 RICE DRILLING B LLC Drilling Fluid Waste 180.00 Bbl CENTRALIZED TREATMENT PLANT FOR RECYCLE WMGR123SW019
2016 RICE DRILLING B LLC Produced Fluid 68.00 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123SW005
2016 RICE DRILLING B LLC Drill Cuttings 111.78 Tons LANDFILL 100172
2016 RICE DRILLING B LLC Servicing Fluid 0.15 Tons LANDFILL 100592
2016 RICE DRILLING B LLC Drill Cuttings 39.50 Tons LANDFILL 100663
2016 RICE DRILLING B LLC Synthetic Liner Materials 0.81 Tons LANDFILL 100172
2016 RICE DRILLING B LLC Produced Fluid 1.80 Bbl RESIDUAL WASTE PROC FAC (GENERAL PERMIT) WMGR123SW005
2016 RICE DRILLING B LLC Synthetic Liner Materials 9.48 Tons LANDFILL 100663
2017 RICE DRILLING B LLC Synthetic Liner Materials 5.22 Tons LANDFILL 100172
2017 RICE DRILLING B LLC Produced Fluid 21.52 Tons RESIDUAL WASTE PROCESSING FACILITY 2014-541
2017 RICE DRILLING B LLC Soil Contaminated by Oil & Gas Related Spills 0.48 Tons LANDFILL CID # 28726
2017 RICE DRILLING B LLC Synthetic Liner Materials 12.96 Tons LANDFILL 100663
2017 RICE DRILLING B LLC Filter Socks 0.19 Tons RESIDUAL WASTE PROCESSING FACILITY 301280
2017 RICE DRILLING B LLC Other Oil & Gas Wastes 553.42 Bbl REUSE (AT WELL PAD)
2017 RICE DRILLING B LLC Produced Fluid 848.10 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123SW019
2017 RICE DRILLING B LLC Other Oil & Gas Wastes 21.37 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123SW019
2017 RICE DRILLING B LLC Produced Fluid 3.01 Tons RESIDUAL WASTE PROCESSING FACILITY ODNR 2015-511
2017 RICE DRILLING B LLC Drilling Fluid Waste 119.11 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123SW005
2017 RICE DRILLING B LLC Produced Fluid 1,033.56 Bbl REUSE (AT WELL PAD)
2017 RICE DRILLING B LLC Produced Fluid 44.00 Bbl INJECTION DISPOSAL WELL 34-059-24202
2017 RICE DRILLING B LLC Other Oil & Gas Wastes 304.23 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123SW005
2017 RICE DRILLING B LLC Soil Contaminated by Oil 0.07 Tons RESIDUAL WASTE PROCESSING FACILITY 301280
2017 RICE DRILLING B LLC Soil Contaminated by Oil & Gas Related Spills 0.07 Tons RESIDUAL WASTE PROCESSING FACILITY 301280
2017 RICE DRILLING B LLC Waste Water Treatment Sludge 5.87 Tons RESIDUAL WASTE TRANSFER FACILITY 101532
2017 RICE DRILLING B LLC Produced Fluid 17.21 Tons RESIDUAL WASTE TRANSFER FACILITY 101532
2017 RICE DRILLING B LLC Servicing Fluid 0.33 Tons RESIDUAL WASTE TRANSFER FACILITY 101532
2017 RICE DRILLING B LLC Produced Fluid 4,749.18 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123SW005
2017 RICE DRILLING B LLC Soil Contaminated by Oil 0.48 Tons LANDFILL CID # 28726
2018 RICE DRILLING B LLC Produced Fluid 710.07 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123SW005
2018 RICE DRILLING B LLC Produced Fluid 442.34 Bbl REUSE AT A WELL PAD OUTSIDE PENNSYLVANIA
2018 RICE DRILLING B LLC Produced Fluid 28.47 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123NW009
2018 RICE DRILLING B LLC Other Oil & Gas Wastes 42.00 Bbl REUSE (AT WELL PAD)
2018 RICE DRILLING B LLC Produced Fluid 1,203.57 Bbl REUSE (AT WELL PAD)
2019 RICE DRILLING B LLC Other Oil & Gas Wastes 235.00 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123SW005
2019 RICE DRILLING B LLC Other Oil & Gas Wastes 11.11 Bbl RESIDUAL WASTE PROCESSING FACILITY
2019 RICE DRILLING B LLC Produced Fluid 2.89 Bbl RESIDUAL WASTE PROCESSING FACILITY
2019 RICE DRILLING B LLC Other Oil & Gas Wastes 152.12 Bbl REUSE (AT WELL PAD)
2019 RICE DRILLING B LLC Produced Fluid 1,061.48 Bbl REUSE (AT WELL PAD)
2019 RICE DRILLING B LLC Produced Fluid 346.31 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123SW005
2019 RICE DRILLING B LLC Other Oil & Gas Wastes 24.44 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123SW010
2019 RICE DRILLING B LLC Other Oil & Gas Wastes 88.33 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123SW019
2019 RICE DRILLING B LLC Produced Fluid 31.46 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123SW019

For data sources see[6]

Inspection Data

Inspections Performed

Inspection ID Inspection Category Inspection Date Inspection Type Inspection Result Inspection Comments
2442136 Primary Facility 2016-01-19 Preoperation Inspection No Violations Noted Pre-operation inspection of the Shotski Well Pad resulting from an operator request.
2454787 Primary Facility 2016-03-01 Drilling/Alteration No Violations Noted Butch’s Rat Hole Service auger rig

Drilled a 36” wellbore and set 26” conductor casing at 40 ft. on 3/1/16.

2473757 Primary Facility 2016-04-08 Drilling/Alteration No Violations Noted Falcon Drilling Rig #29

Moved onto this well on 4/4/16 and resumed drilling at 52 ft. KB. The 20” casing was set at 289 ft. on 4/4/16 and cemented to surface with 15 bbls returned. The 13 3/8” casing was set at 523 ft. on 4/5/16 and cemented to surface with 34 bbls returned. Coal was found from 467 ft. to 476 ft. A basket was set at 444 ft. The 9 5/8” casing was set at 2334 ft. on 4/8/16 and cemented to surface with 51 bbls returned. Currently at 2345 ft. and waiting on cement.

2476366 Primary Facility 2016-04-19 Drilling/Alteration No Violations Noted Falcon Drilling Rig #29

KOP was at 2700 ft. TD was at 7030 ft. on 4/11/16.

2503509 Primary Facility 2016-07-20 Drilling/Alteration No Violations Noted Patterson-UTI Drilling Rig #349

Moved onto this well on 7/20/16. Currently nippling up BOP’s.

2506217 Primary Facility 2016-07-28 Drilling/Alteration No Violations Noted Patterson-UTI Drilling Rig #349

Resumed Drilling at 7041 ft. MD KB (6921 ft. TVD). KOP was at 7041 ft. EOB on the curve was at 8371 ft. MD (7612 ft. TVD). TD was at 14,345 ft. MD (7706 ft. TVD) on 7/22/16. The 5 ½” casing was set at 14,325 ft. The operator attempted to cement casing to surface but was unable to do so after pumping 110% of capacity. Estimated TOC is at 188 ft.

2590891 Primary Facility 2017-05-05 Incident- Response to Accident or Event In Compliance with Policy On 5/4/17 an INCDT inspection was conducted of the Shotski well site in response to an operator reported incident CTS ID ???. The following was observed:

>>The initial incident report indicated that 12-15 gallons of production fluids had been lost to the site access road. Communication with site personnel indicated that the spill was near the production tanks and that it had been cleaned up immediately with all impacted materials had been removed. New gravel near the loading point at the production tank corroborates the on site report.

>>Four wells were observed to be in production at the time of inspection. Eight boxes were observed on site as well.

2723188 Primary Facility 2018-03-09 Complaint Inspection No Violations Noted On 3/9/18 a complaint inspection was conducted of the Shotski well pad and an associated location in relation to a complaint (CTS ID: 333603) in which excessive water leaving the site resulting in erosion damage was reported. The following was observed:

>>The complainant reported that from roughly six weeks prior to the inspection date during multiple occurrences heavy rain overwhelmed site controls resulting in severe flooding in area streams and springs resulting in substantial property damage. Inspection of the related area found substantial erosion damage related to streams flowing from the direction of the well site.

>>Inspection of the pad and perimeter controls did not find current or historical evidence of sedimentation or erosion damage leaving the site and site controls appeared to be fully intact and functional. Water flow patterns from the site could not be observed at the time of inspection due to insufficient precipitation. No violation.

2723224 Primary Facility 2018-04-17 Incident- Response to Accident or Event In Compliance with Schedule On 4/17/18 an incident inspection of the Shotski Well Site was conducted in response to an operator reported spill. The following was observed:

>>On 4/14/18 EQT's Corey Giles reported a 10 gallon produced water spill at the Shotski Pad. No further information was provided at the time.

>>Inspection of the pad found no evidence of the spill. Contact with Corey Giles indicated that the spill was related to driver error while servicing the production tanks on site and that the spill was localized to the area around the truck transfer point near the tanks. The spill was reported as having been cleaned up at the time of inspection but clean up could not be verified. No new gravel or excavation was discernible at the time of inspection.

>>A follow up inspection will be provided for this spill when cleanup documentation and results are made available.

2735086 Primary Facility 2018-05-17 Follow-up Inspection No Violations Noted On 5/17/18 a follow up inspection of the Shotski Well Site was conducted in response to CTS ID: 332745. The following was observed:

>>No evidence was found of channeled water or erosion related sediments leaving the site. All site controls were found to be intact and appeared fully functional. No violations.

2840394 Primary Facility 2019-02-12 Routine/Complete Inspection No Violations Noted On 2/6/19 a complaint inspection of the Shotski Well Pad was conducted in response to a complainant reported incident. The following was observed:

>>The complainant reported ongoing flooding associated with the Shotski site.

>>Inspection of the complainant's location found heavy flooding causing some property damage. Flooding was endemic to the general area at the time of inspection related to heavy rain events.

>>Site inspection found that site controls all appear to be functioning with minimal overflow from the sediment pond on site. No channeled or otherwise inappropriate flow of water or sediment from the site was found. Water was visibly accumulating off site from surrounding pastureland into the channel and subsequent flood plain.

>>Immediate initial response completed to ensure public safety by inspector formerly responsible for area.

For data sources see[7]

References