If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 37-125-27845 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":40.140511,"lon":-80.044925,"icon":""}]} |
Country: United States | |
State: Pennsylvania | |
County: Washington | |
Municipality: Somerset Township | |
Operator Name: RICE DRILLING B LLC | |
Well Pad ID: 153105 | |
Farm/Lease Name: LOHR 10H | |
License Status: | |
Spud Date: | |
Permit Date: 2016-01-28 | |
Well Type: GAS | |
Unconventional Well: Y | |
Configuration: Horizontal Well | |
Conservation: No | |
Latitude: 40.140511 | |
Longitude: -80.044925 |
Date | Event |
---|---|
2016-01-28 | New Permit Application |
2016-04-18 | Performed Spud Operation |
For data sources see[4]
Period | Operator Name | Gas Quantity (mcf) | Gas Production Days | Oil Quantity (bbl) | Oil Production Days | Water Quantity (bbl) | Water Production Days |
---|---|---|---|---|---|---|---|
2016 | RICE DRILLING B LLC | 0.00 | 0 | 0.00 | 0 | 0.00 | 0 |
2017 | RICE DRILLING B LLC | 2,749,023.40 | 222 | 0.00 | 0 | 0.00 | 0 |
2018 | RICE DRILLING B LLC | 3,499,274.00 | 365 | 0.00 | 0 | 0.00 | 0 |
2019 | RICE DRILLING B LLC | 2,077,390.00 | 365 | 0.00 | 0 | 0.00 | 0 |
For data sources see[5]
Period | Operator | Waste Type | Quantity | Disposal Method | Waste Facility ID |
---|---|---|---|---|---|
2016 | RICE DRILLING B LLC | Other Oil & Gas Wastes | 502.31 Bbl | REUSE OTHER THAN ROAD SPREADING | |
2016 | RICE DRILLING B LLC | Drilling Fluid Waste | 191.66 Bbl | RESIDUAL WASTE PROC FAC (GENERAL PERMIT) | WMGR123SW005 |
2016 | RICE DRILLING B LLC | Other Oil & Gas Wastes | 240.17 Bbl | RESIDUAL WASTE PROCESSING FACILITY | WMGR123SW005 |
2016 | RICE DRILLING B LLC | Drill Cuttings | 438.37 Tons | LANDFILL | 100620 |
2016 | RICE DRILLING B LLC | Produced Fluid | 91.63 Bbl | CENTRALIZED TREATMENT PLANT FOR RECYCLE | WMGR123SW019 |
2016 | RICE DRILLING B LLC | Produced Fluid | 39.16 Bbl | REUSE OTHER THAN ROAD SPREADING | |
2016 | RICE DRILLING B LLC | Drilling Fluid Waste | 38.33 Bbl | CENTRALIZED TREATMENT PLANT FOR RECYCLE | WMGR123SW019 |
2016 | RICE DRILLING B LLC | Drill Cuttings | 79.17 Tons | LANDFILL | 100172 |
2016 | RICE DRILLING B LLC | Servicing Fluid | 0.43 Tons | LANDFILL | 100592 |
2016 | RICE DRILLING B LLC | Drill Cuttings | 642.76 Tons | LANDFILL | 100663 |
2016 | RICE DRILLING B LLC | Drilling Fluid Waste | 30.00 Bbl | RESIDUAL WASTE PROCESSING FACILITY | WMGR123SW005 |
2016 | RICE DRILLING B LLC | Synthetic Liner Materials | 5.21 Tons | LANDFILL | 100663 |
2017 | RICE DRILLING B LLC | Produced Fluid | 2.85 Tons | RESIDUAL WASTE PROCESSING FACILITY | 2014-541 |
2017 | RICE DRILLING B LLC | Soil Contaminated by Oil & Gas Related Spills | 16.02 Tons | LANDFILL | CID # 28726 |
2017 | RICE DRILLING B LLC | Synthetic Liner Materials | 7.02 Tons | LANDFILL | 100663 |
2017 | RICE DRILLING B LLC | Filter Socks | 0.18 Tons | RESIDUAL WASTE PROCESSING FACILITY | 301280 |
2017 | RICE DRILLING B LLC | Produced Fluid | 44.67 Bbl | INJECTION DISPOSAL WELL | 34-157-25511 |
2017 | RICE DRILLING B LLC | Produced Fluid | 40.86 Bbl | REUSE AT A WELL PAD OUTSIDE PENNSYLVANIA | |
2017 | RICE DRILLING B LLC | Other Oil & Gas Wastes | 1,579.46 Bbl | REUSE (AT WELL PAD) | |
2017 | RICE DRILLING B LLC | Produced Fluid | 4,566.66 Bbl | REUSE (AT WELL PAD) | |
2017 | RICE DRILLING B LLC | Drilling Fluid Waste | 137.15 Bbl | RESIDUAL WASTE PROCESSING FACILITY | WMGR123SW005 |
2017 | RICE DRILLING B LLC | Waste Water Treatment Sludge | 8.64 Tons | RESIDUAL WASTE PROCESSING FACILITY | 2014-541 |
2017 | RICE DRILLING B LLC | Other Oil & Gas Wastes | 151.46 Bbl | RESIDUAL WASTE PROCESSING FACILITY | WMGR123SW005 |
2017 | RICE DRILLING B LLC | Soil Contaminated by Oil | 0.28 Tons | RESIDUAL WASTE PROCESSING FACILITY | 301280 |
2017 | RICE DRILLING B LLC | Soil Contaminated by Oil & Gas Related Spills | 0.28 Tons | RESIDUAL WASTE PROCESSING FACILITY | 301280 |
2017 | RICE DRILLING B LLC | Produced Fluid | 74.32 Bbl | RESIDUAL WASTE PROCESSING FACILITY | WMGR123NW009 |
2017 | RICE DRILLING B LLC | Produced Fluid | 62.06 Tons | RESIDUAL WASTE TRANSFER FACILITY | 101532 |
2017 | RICE DRILLING B LLC | Drilling Fluid Waste | 431.83 Bbl | REUSE (AT WELL PAD) | |
2017 | RICE DRILLING B LLC | Other Oil & Gas Wastes | 1.39 Tons | RESIDUAL WASTE TRANSFER FACILITY | 101532 |
2017 | RICE DRILLING B LLC | Produced Fluid | 2,596.90 Bbl | RESIDUAL WASTE PROCESSING FACILITY | WMGR123SW005 |
2017 | RICE DRILLING B LLC | Produced Fluid | 64.17 Bbl | RESIDUAL WASTE PROCESSING FACILITY | WMGR123SW010 |
2017 | RICE DRILLING B LLC | Produced Fluid | 973.30 Bbl | RESIDUAL WASTE PROCESSING FACILITY | WMGR123SW019 |
2017 | RICE DRILLING B LLC | Soil Contaminated by Oil | 16.02 Tons | LANDFILL | CID # 28726 |
2018 | RICE DRILLING B LLC | Servicing Fluid | 23.26 Bbl | REUSE (AT WELL PAD) | |
2018 | RICE DRILLING B LLC | Produced Fluid | 29.03 Tons | RESIDUAL WASTE PROCESSING FACILITY | 2014-541 |
2018 | RICE DRILLING B LLC | Other Oil & Gas Wastes | 126.67 Bbl | REUSE (AT WELL PAD) | |
2018 | RICE DRILLING B LLC | Produced Fluid | 1,262.87 Bbl | RESIDUAL WASTE PROCESSING FACILITY | WMGR123SW005 |
2018 | RICE DRILLING B LLC | Produced Fluid | 44.33 Bbl | RESIDUAL WASTE PROCESSING FACILITY | WMGR123SW019 |
2018 | RICE DRILLING B LLC | Produced Fluid | 868.07 Bbl | REUSE AT A WELL PAD OUTSIDE PENNSYLVANIA | |
2018 | RICE DRILLING B LLC | Produced Fluid | 23.62 Bbl | INJECTION DISPOSAL WELL | 34-105-23619 |
2018 | RICE DRILLING B LLC | Servicing Fluid | 46.51 Bbl | RESIDUAL WASTE PROCESSING FACILITY | WMGR123SW005 |
2018 | RICE DRILLING B LLC | Servicing Fluid | 346.75 Bbl | REUSE AT A WELL PAD OUTSIDE PENNSYLVANIA | |
2018 | RICE DRILLING B LLC | Produced Fluid | 983.66 Bbl | REUSE (AT WELL PAD) | |
2019 | RICE DRILLING B LLC | Produced Fluid | 2.80 Tons | RESIDUAL WASTE PROCESSING FACILITY | 2014-541 |
2019 | RICE DRILLING B LLC | Produced Fluid | 82.37 Bbl | SURFACE IMPOUNDMENT | 95-7-37312-19 |
2019 | RICE DRILLING B LLC | Other Oil & Gas Wastes | 49.99 Bbl | REUSE (AT WELL PAD) | |
2019 | RICE DRILLING B LLC | Produced Fluid | 1,626.18 Bbl | REUSE (AT WELL PAD) | |
2019 | RICE DRILLING B LLC | Produced Fluid | 23.42 Bbl | RESIDUAL WASTE PROCESSING FACILITY | WMGR123SW010 |
2019 | RICE DRILLING B LLC | Produced Fluid | 47.58 Bbl | RESIDUAL WASTE PROCESSING FACILITY | WMGR123SW005 |
2019 | RICE DRILLING B LLC | Other Oil & Gas Wastes | 20.83 Bbl | REUSE AT A WELL PAD OUTSIDE PENNSYLVANIA | |
2019 | RICE DRILLING B LLC | Synthetic Liner Materials | 3.93 Tons | LANDFILL | 100419 |
2019 | RICE DRILLING B LLC | Produced Fluid | 22.16 Bbl | REUSE AT A WELL PAD OUTSIDE PENNSYLVANIA |
For data sources see[6]
Inspection ID | Inspection Category | Inspection Date | Inspection Type | Inspection Result | Inspection Comments |
---|---|---|---|---|---|
2476371 | Primary Facility | 2016-04-19 | Drilling/Alteration | No Violations Noted | Butch’s Rat Hole Service auger rig
Drilled a 36” wellbore and set 26” conductor casing at 40 ft. on 4/19/16. |
2482742 | Primary Facility | 2016-05-10 | Drilling/Alteration | No Violations Noted | Falcon Drilling Rig #29
Moved onto this well on 4/30/16 and resumed drilling at 52 ft. KB. The 20” casing was set at 281 ft. on 4/30/16 and cemented to surface with 17.5 bbls returned. The 13 3/8” casing was set at 528 ft. on 5/1/16 and grouted to surface above the basket. Coal was found from 480 ft. to 487 ft. A basket was set at 464 ft. The 9 5/8” casing was set at 1924 ft. on 5/2/16 and cemented to surface with 15 bbls returned. KOP was at 3100 ft. TD was at 6588 ft. MD on 5/6/16. |
2518080 | Primary Facility | 2016-09-07 | Drilling/Alteration | No Violations Noted | Patterson-UTI Drilling Rig #349
Moved onto this well on 8/27/16 and resumed drilling at 6600 ft. KOP was at 7365 ft. MD (6996.12 ft. TVD) from tangent. EOB on the curve was at 8458 ft. MD (7640.85 ft. TVD). TD was at 16,312 ft. MD (7733.78 ft. TVD) on 9/1/16. The 5 ½” casing was set at 16,304 ft. Casing was not cemented to surface. The estimated TOC is at 563 ft. |
For data sources see[7]