If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 37-125-27903 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":40.358611,"lon":-80.247639,"icon":""}]} |
Country: United States | |
State: Pennsylvania | |
County: Washington | |
Municipality: Cecil Township | |
Operator Name: UNKNOWN OPR | |
Well Pad ID: | |
Farm/Lease Name: | |
License Status: | |
Spud Date: | |
Permit Date: | |
Well Type: GAS | |
Unconventional Well: N | |
Configuration: Undetermined | |
Conservation: No | |
Latitude: 40.358611 | |
Longitude: -80.247639 |
Inspection ID | Inspection Category | Inspection Date | Inspection Type | Inspection Result | Inspection Comments |
---|---|---|---|---|---|
2598697 | Primary Facility | 2015-12-10 | Routine/Complete Inspection | No Viols - Permanently Shut Down | Visited site w/ RETTEW representative as part of the Southern Beltway Project. Well appears to have been plugged in some manner, w/ 10 inch conductor/surface casing filled w/ concrete and vented by 2 inch tubing. Vent is open to ~ 10 feet below surface and was not venting gas at the time of inspection. |
2598702 | Primary Facility | 2017-05-09 | Plugging(Includes Plugged/Mined Through) | In Compliance with Schedule | Met Yost representative at site. Fay had well pad partially built. |
2598703 | Primary Facility | 2017-05-22 | Plugging(Includes Plugged/Mined Through) | In Compliance with Policy | Yost rig is cleaning cavings out of hole @191 feet. |
2598706 | Primary Facility | 2017-05-23 | Plugging(Includes Plugged/Mined Through) | In Compliance with Policy | Yost is at 400 feet, cleaning cavings from the well. They have been unable to get returns to surface, so have made frequent wiper trips, with no drag. |
2602878 | Primary Facility | 2017-06-01 | Plugging(Includes Plugged/Mined Through) | In Compliance with Policy | Yost rig reaming/drilling back down hole, @ 1000 feet. Circulation limited to air, w/ no fluid returns. |
2602883 | Primary Facility | 2016-06-08 | Plugging(Includes Plugged/Mined Through) | In Compliance with Policy | Yost rig milling w/ 6" flat bottom mill @ 1072 feet, w/ good fluid circulation. Slow penetration, ~6" today. Attempting to clean back down to depth reached before of 1226 feet. |
2608005 | Primary Facility | 2017-06-15 | Plugging(Includes Plugged/Mined Through) | In Compliance with Policy | Yost spotted bottom plug, calculated TOC @500 feet. Well was shot before cementing from 1070' to 300'. Loggers scheduled for later today to tag TOC & perf the rest of casing. |
2608011 | Primary Facility | 2017-06-21 | Plugging(Includes Plugged/Mined Through) | In Compliance with Policy | Yost P&A'd well. Beltway excavation currently at site. |
For data sources see[4]