If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 37-125-28086 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":40.164769,"lon":-79.944325,"icon":""}]} |
Country: United States | |
State: Pennsylvania | |
County: Washington | |
Municipality: Carroll Township | |
Operator Name: EQT PROD CO | |
Well Pad ID: 145213 | |
Farm/Lease Name: R SMITH 593773 | |
License Status: | |
Spud Date: | |
Permit Date: 2016-11-04 | |
Well Type: GAS | |
Unconventional Well: Y | |
Configuration: Horizontal Well | |
Conservation: No | |
Latitude: 40.164769 | |
Longitude: -79.944325 |
Date | Event |
---|---|
2016-11-04 | New Permit Application |
2016-11-05 | Performed Spud Operation |
For data sources see[4]
Job Number | Job Start Date | Job End Date | True Vertical Depth (ft) | Total Water Volume (gal) | Total Non-Water Volume (gal) |
---|---|---|---|---|---|
1 | 2017-03-24 | 2017-05-25 | 7,326 | 14,096,000 | 0 |
Job Number | Trade Name | Supplier | Purpose | Ingredient Name | CAS Number | Additive Percentage by Mass | Job Percentage by Mass | Mass Used (lb) |
---|---|---|---|---|---|---|---|---|
1 | LD-2250 | Multi-Chem | Friction Reducer | Listed Below | ||||
MX MX 5-2349 | Multi-Chem | Friction Reducer Breaker | Listed Below | |||||
CI-150 | FTS International | Acid Corrosion Inhibitor | Listed Below | |||||
Other Chemical(s) | Listed Above | See Trade Name(s) List | Listed Below | |||||
MC MX 8-2544 | Multi-Chem | Live Culture - Nitrate Reducing Bacteria | Listed Below | |||||
Water | FTS International | Carrier/Base Fluid | Water | 7732-18-5 | 100 | 87.8291 | 117,631,000.0 | |
LD-2550 | Multi-Chem | Additive | Listed Below | |||||
APB-1 | FTS International | Gel Breaker | Listed Below | |||||
Sand (Proppant) | FTS International | Proppant | Listed Below | |||||
MC MX 5-3886 | Multi-Chem | Specialty Brine | Listed Below | |||||
CS-500 SI | FTS International | Scale Inhibitor | Listed Below | |||||
Calcium nitrate | 13477-34-4 | 100 | 0.107216 | 143597 | ||||
Sodium chloride | 7647-14-5 | 100 | 0.00980685 | 13134.5 | ||||
Ammonium persulfate | 7727-54-0 | 95 | 0.000421922 | 565.09 | ||||
Hydrotreated light petroleum distillate | 64742-47-8 | 30 | 0.00395275 | 5294 | ||||
Ethylene Glycol | 107-21-1 | 10 | 0.00240067 | 3215.27 | ||||
Petroleum distillate | 64742-47-8 | 55 | 0.00000368 | 4.934 | ||||
Sodium nitrate | 7631-99-4 | 5 | 0.000490342 | 656.726 | ||||
Ammonium persulfate | 7727-54-0 | 13 | 0.00002733 | 36.607 | ||||
Fatty nitrogen derived amides | Proprietary | 5 | 0.00319881 | 4284.24 | ||||
Fatty nitrogen derived amides | Proprietary | 5 | 0.00319881 | 4284.24 | ||||
Sodium chloride | 7647-14-5 | 5 | 0.00319881 | 4284.24 | ||||
Hydrotreated light petroleum distillate | 64742-47-8 | 30 | 0.0191929 | 25705.4 | ||||
Silica Substrate | 14808-60-7 | 100 | 11.6782 | 15,640,900.0 | ||||
Polyacrylate | Proprietary | 30 | 0.00395275 | 5294 | ||||
Ethoxylated alcohol | Proprietary | 5 | 0.000658792 | 882.334 | ||||
Sodium chloride | 7647-14-5 | 100 | 0.00980685 | 13134.5 | ||||
Sodium chloride | 7647-14-5 | 5 | 0.000658792 | 882.334 | ||||
Petroleum distillate | 64742-47-8 | 55 | 0.00000368 | 4.934 | ||||
Guar gum | 9000-30-0 | 50 | 0.00000335 | 4.485 | ||||
Quaternary ammonium compound | Proprietary | 10 | 0.00005058 | 67.745 | ||||
Hydrochloric Acid | 7647-01-0 | 15 | 0.0410015 | 54914.3 | ||||
Clay | 14808-60-7 | 2 | 0.00000013 | 0.179 | ||||
Isopropanol | 67-63-0 | 30 | 0.000151744 | 203.234 | ||||
Fatty nitrogen derived amides | Proprietary | 5 | 0.000658792 | 882.334 | ||||
Guar gum | 9000-30-0 | 50 | 0.00000335 | 4.485 | ||||
Organic amine resin salt | Proprietary | 30 | 0.000151744 | 203.234 | ||||
Ammonium persulfate | 7727-54-0 | 95 | 0.000421922 | 565.09 | ||||
Ethylene glycol | 107-21-1 | 13 | 0.00002733 | 36.607 | ||||
Sodium nitrate | 7631-99-4 | 5 | 0.000490342 | 656.726 | ||||
Polyacrylate | Proprietary | 30 | 0.00395275 | 5294 | ||||
Ethylene Glycol | 107-21-1 | 30 | 0.000151744 | 203.234 | ||||
Aromatic aldehyde | Proprietary | 10 | 0.00005058 | 67.745 | ||||
Calcium nitrate | 13477-34-4 | 100 | 0.107216 | 143597 | ||||
Sodium chloride | 7647-14-5 | 5 | 0.000658792 | 882.334 | ||||
Ethoxylated alcohol | Proprietary | 5 | 0.000658792 | 882.334 | ||||
Polyacrylate | Proprietary | 30 | 0.0191929 | 25705.4 | ||||
Surfactant | 68439-51-0 | 2 | 0.00000013 | 0.179 | ||||
Ethylene glycol | 107-21-1 | 13 | 0.00002733 | 36.607 | ||||
Sodium chloride | 7647-14-5 | 5 | 0.00319881 | 4284.24 | ||||
Clay | 14808-60-7 | 2 | 0.00000013 | 0.179 | ||||
Surfactant | 68439-51-0 | 2 | 0.00000013 | 0.179 | ||||
Dimethylformamide | 68-12-2 | 10 | 0.00005058 | 67.745 | ||||
Fatty nitrogen derived amides | Proprietary | 5 | 0.000658792 | 882.334 | ||||
Ammonium persulfate | 7727-54-0 | 13 | 0.00002733 | 36.607 | ||||
Polyacrylate | Proprietary | 30 | 0.0191929 | 25705.4 | ||||
Ethoxylated alcohol | Proprietary | 5 | 0.00319881 | 4284.24 | ||||
Hydrotreated light petroleum distillate | 64742-47-8 | 30 | 0.00395275 | 5294 | ||||
Hydrochloric Acid (15%) | FTS International | Acidizing | Listed Below | |||||
HVG-1 | FTS International | Water Gelling Agent | Listed Below |
For data sources see[5]
Period | Operator Name | Gas Quantity (mcf) | Gas Production Days | Oil Quantity (bbl) | Oil Production Days | Water Quantity (bbl) | Water Production Days |
---|---|---|---|---|---|---|---|
2016 | EQT PROD CO | 0.00 | 0 | 0.00 | 0 | 0.00 | 0 |
2017 | EQT PROD CO | 1,603,991.00 | 160 | 0.00 | 0 | 0.00 | 0 |
2018 | EQT PROD CO | 2,551,935.00 | 365 | 0.00 | 0 | 0.00 | 0 |
2019 | EQT PROD CO | 1,364,043.00 | 322 | 0.00 | 0 | 0.00 | 0 |
For data sources see[6]
Period | Operator | Waste Type | Quantity | Disposal Method | Waste Facility ID |
---|---|---|---|---|---|
2017 | EQT PROD CO | Drill Cuttings | 227.13 Tons | LANDFILL | 100172 |
2017 | EQT PROD CO | Synthetic Liner Materials | 0.77 Tons | LANDFILL | 100419 |
2017 | EQT PROD CO | Produced Fluid | 723.90 Bbl | RESIDUAL WASTE PROCESSING FACILITY | WMGR123SW005 |
2017 | EQT PROD CO | Other Oil & Gas Wastes | 1,065.00 Bbl | REUSE (AT WELL PAD) | |
2017 | EQT PROD CO | Waste Water Treatment Sludge | 43.24 Tons | RESIDUAL WASTE PROCESSING FACILITY | 2014-541 |
2017 | EQT PROD CO | Other Oil & Gas Wastes | 590.00 Bbl | RESIDUAL WASTE PROCESSING FACILITY | WMGR123SW005 |
2017 | EQT PROD CO | Drill Cuttings | 947.65 Tons | LANDFILL | 100663 |
2017 | EQT PROD CO | Produced Fluid | 184.88 Bbl | INJECTION DISPOSAL WELL | 34-031-27177 |
2017 | EQT PROD CO | Synthetic Liner Materials | 81.26 Tons | LANDFILL | 100663 |
2017 | EQT PROD CO | Produced Fluid | 32.96 Bbl | RESIDUAL WASTE PROCESSING FACILITY | |
2017 | EQT PROD CO | Produced Fluid | 2,253.09 Bbl | REUSE (AT WELL PAD) | |
2017 | EQT PROD CO | Drilling Fluid Waste | 650.00 Bbl | REUSE (AT WELL PAD) | |
2017 | EQT PROD CO | Drill Cuttings | 259.09 Tons | LANDFILL | 100592 |
2017 | EQT PROD CO | Produced Fluid | 85.03 Tons | RESIDUAL WASTE PROCESSING FACILITY | 2014-541 |
2018 | EQT PROD CO | Other Oil & Gas Wastes | 10.45 Bbl | RESIDUAL WASTE PROCESSING FACILITY | |
2018 | EQT PROD CO | Other Oil & Gas Wastes | 10.45 Bbl | REUSE AT A WELL PAD OUTSIDE PENNSYLVANIA | |
2018 | EQT PROD CO | Produced Fluid | 1,374.18 Bbl | RESIDUAL WASTE PROCESSING FACILITY | WMGR123SW005 |
2018 | EQT PROD CO | Produced Fluid | 725.46 Bbl | REUSE (AT WELL PAD) | |
2018 | EQT PROD CO | Other Oil & Gas Wastes | 91.36 Bbl | RESIDUAL WASTE PROCESSING FACILITY | WMGR123SW005 |
2018 | EQT PROD CO | Produced Fluid | 115.98 Bbl | REUSE AT A WELL PAD OUTSIDE PENNSYLVANIA | |
2018 | EQT PROD CO | Other Oil & Gas Wastes | 57.03 Bbl | REUSE (AT WELL PAD) | |
2018 | EQT PROD CO | Other Oil & Gas Wastes | 10.00 Bbl | RESIDUAL WASTE PROCESSING FACILITY | WMGR123NW009 |
2019 | EQT PROD CO | Produced Fluid | 45.15 Bbl | RESIDUAL WASTE PROCESSING FACILITY | WMGR123SW005 |
2019 | EQT PROD CO | Produced Fluid | 26.55 Bbl | REUSE AT A WELL PAD OUTSIDE PENNSYLVANIA | |
2019 | EQT PROD CO | Produced Fluid | 22.51 Bbl | INJECTION DISPOSAL WELL | 34-167-29543 |
2019 | EQT PROD CO | Produced Fluid | 1,039.63 Bbl | REUSE (AT WELL PAD) | |
2019 | EQT PROD CO | Produced Fluid | 2.46 Bbl | INJECTION DISPOSAL WELL | 34-167-28462 |
2019 | EQT PROD CO | Other Oil & Gas Wastes | 19.41 Bbl | RESIDUAL WASTE PROCESSING FACILITY | WMGR123SW019 |
2019 | EQT PROD CO | Produced Fluid | 69.00 Bbl | RESIDUAL WASTE PROCESSING FACILITY | WMGR123SW019 |
2019 | EQT PROD CO | Produced Fluid | 16.73 Bbl | RESIDUAL WASTE PROCESSING FACILITY | WMGR123SW010 |
2019 | EQT PROD CO | Other Oil & Gas Wastes | 207.50 Bbl | REUSE (AT WELL PAD) |
For data sources see[7]
Inspection ID | Inspection Category | Inspection Date | Inspection Type | Inspection Result | Inspection Comments |
---|---|---|---|---|---|
2536405 | Primary Facility | 2016-11-10 | Drilling/Alteration | No Violations Noted | Cellar Tech auger rig
Drilled a 30” wellbore and set 26” conductor casing at 50 ft. on 11/8/16. |
2536408 | Primary Facility | 2016-11-10 | Drilling/Alteration | No Violations Noted | Alpha Hunter Drilling Rig #8
Moved onto this well on 11/7/16 and resumed drilling at 63 ft. KB. The 18 5/8” casing was set at 287 ft. on 11/8/16 and cemented to surface with 34 bbls returned. The 13 3/8” casing was set a t442 ft. on 11/9/16 and cemented to surface with 55 bbls returned. Coal was found from 344 ft. to 352 ft. A basket was set at 312 ft. Currently at 492 ft. and TIH to resume drilling. |
2538836 | Primary Facility | 2016-11-22 | Drilling/Alteration | No Violations Noted | Alpha Hunter Drilling Rig #8
The 9 5/8” casing was set at 1677 ft. on 11/11/16 and cemented to surface with 33 bbls returned. A Casing Annulus Packer (CAP) set in the 9 5/8” casing string from 1258 ft. to 1270 ft. (The CAP is approximately 10 ft. long with pup joints above and below.) KOP was at 3451 ft. TD was at 6161 ft. MD on 11/15/16. |
2567365 | Primary Facility | 2017-03-02 | Drilling/Alteration | No Violations Noted | Patterson-UTI Drilling Rig #277
Moved onto this well on 2/27/17 and resumed drilling at 6166 ft. MD. Currently at 10,731 ft. and drilling ahead. |
2571388 | Primary Facility | 2017-03-10 | Drilling/Alteration | No Violations Noted | Patterson-UTI Drilling Rig #277
EOB was at 8802 ft. MD (7305 ft. TVD). TD was at 20,380 ft. MD (7280 ft. TVD) on 3/5/17. The 5 ½” casing was set at 20,362 ft. on 3/8/17. The estimated TOC is at 5070 ft. |
2614188 | Primary Facility | 2017-05-05 | Incident- Response to Accident or Event | In Compliance with Policy | On 5/5/17 an INCDT inspection of the R. Smith well site was conducted in response to CTS ID: 326715. The following was observed:
>> Site was undergoing fracking at time of inspection. >>The spill in question involved roughly 10 gallons of produced water being sprayed from from an overfilled accessory tank on the pad. Affected pad materials were collected and placed in a waste box on pad for disposal. No violation, site appears to be in compliance with policy. >>Streaking was again noted on the outside of multiple production tanks similar to streaking noted in previous inspections. |
2660192 | Primary Facility | 2017-11-09 | Routine/Complete Inspection | No Violations Noted | On 11/10/17 a routine complete inspection of the R. Smith well site was conducted in response to notification additional drilling on site. The following was observed:
>>A box tank was found near the impoundment with no containment. Remediation recommended, no violation. >>A new top soil stock pile was noted on site. It was stabilized with straw at the time of inspection. >>The soil stock pile was noted to not have any functional controls below it other than an adequate vegetated strip. Decomposed CFS should be removed, repaired, or replaced. No violation. >>Drilling was ongoing at the site at the time of inspection. |
2691627 | Primary Facility | 2018-02-02 | Routine/Complete Inspection | No Violations Noted | Well has been fracked and is producing. |
2705694 | Primary Facility | 2018-03-13 | Routine/Partial Inspection | No Violations Noted | On 3/14/18 a routine complete inspection of the R. Smith Well Site was conducted in response to a notification of proposed construction activity on the pad. The following was observed:
>>The site was in a high activity phase at the time of inspection drilling appeared to be completed and the site was in apparent transition to post drilling activities. No drilling rig was present on site at the time of inspection. >>Construction of a proposed AST had not begun at the time of inspection. >>Many water trucks were present on site in association with the attached impoundment. |
2738541 | Primary Facility | 2018-05-16 | Incident- Response to Accident or Event | No Violations Noted | On 5/16/18 an incident inspection of the R. Smith well site was conducted in response to a spill reported by the operator on 5/14/18. The following was observed:
>>The operator reported that roughly 35 gallons of mixed rain water and produced water was spilled to the pad when a section of containment was moved without being drained first. Fluids were spread over a large area of the pad along the area in front of the production units per discussion with Mike Cromley at the time of inspection. This does constitute a violation of 25 Pa. Code § 78.54 and 25 Pa. Code § 78.57(a) in that the operator failed to control regulated materials in a manner that prevents prevents pollution to the ground or Waters of the Commonwealth however, the violation is regarded as immediately corrected. >>Site inspection found no residual evidence of the spill. The operator reported that all visibly impacted gravel from the spill area had been removed (roughly two clamshell dumpsters). |
2747227 | Primary Facility | 2018-06-29 | Routine/Partial Inspection | No Violations Noted | On 6/29/18 a routine partial inspection of the R. Smith Well Site was conducted in response to concerns about runoff raised by a nearby resident. The following was observed:
>>An unstabilized soil pile near the corner of the pad with a newly improved drain. Controls below the pile were absent though the vegetation was sufficient. No violation, remediation recommended. >>Another only partially stabilized soil pile with no controls below the pile was located along the accessory pad access road. No controls beyond vegetation were present below the soil pile. No violation, monitoring recommended. >>An AST was present on the accessory pad. >>The pad was active at the time of inspection with drilling preparations ongoing. A sound wall was present around the pad perimeter. |
2761984 | Primary Facility | 2018-08-02 | Routine/Complete Inspection | No Violations Noted | On 8/2/18 a complaint response inspection was conducted of the R Smith well site in response to reported concerns of inappropriate drainage from the pad. WQSS John Carson accompanied. The following was observed:
>>A top soil pile on the access road to the accessory pad remained lacking vegetation and with spotty temporary stabilization. The vegetative strip below remains in good condition. Remediation recommended, no violation. >>Emptying partially filled containment is encouraged to aid in identifying any possible leaks. No violation. >>No evidence of excessive or unpermitted runoff from the pad was found. >>Box in containment appears to be collecting emergency blowdown. If so it should be properly marked. No violation. |
For data sources see[8]