If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 37-125-28101 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":40.130614,"lon":-80.123736,"icon":""}]} |
Country: United States | |
State: Pennsylvania | |
County: Washington | |
Municipality: North Bethlehem Township | |
Operator Name: RICE DRILLING B LLC | |
Well Pad ID: 153539 | |
Farm/Lease Name: THAI VOLCANO 13H | |
License Status: | |
Spud Date: | |
Permit Date: 2017-01-03 | |
Well Type: GAS | |
Unconventional Well: Y | |
Configuration: Horizontal Well | |
Conservation: No | |
Latitude: 40.130614 | |
Longitude: -80.123736 |
Date | Event |
---|---|
2017-01-03 | New Permit Application |
2017-05-08 | Performed Spud Operation |
For data sources see[4]
Job Number | Job Start Date | Job End Date | True Vertical Depth (ft) | Total Water Volume (gal) | Total Non-Water Volume (gal) |
---|---|---|---|---|---|
1 | 2018-02-23 | 2018-03-07 | 7,709 | 7,895,580 | 0 |
Job Number | Trade Name | Supplier | Purpose | Ingredient Name | CAS Number | Additive Percentage by Mass | Job Percentage by Mass | Mass Used (lb) |
---|---|---|---|---|---|---|---|---|
1 | Other Chemical(s) | Listed Above | See Trade Name(s) List | Listed Below | ||||
MX-5-3886 | Multi-Chem | Bacteria Treatment | Listed Below | |||||
LD-2950 | Multi-Chem | Friction Reducer | Listed Below | |||||
Hydrochloric Acid (15%) | Universal | Acidizing | Listed Below | |||||
Sand (Proppant) | Universal | Proppant | Listed Below | |||||
MX-5-2349 | Multi-Chem | Friction Reducer | Listed Below | |||||
Water | Universal | Carrier/Base Fluid | Water | 7732-18-5 | 100 | 84.9437 | 65,888,600.0 | |
Unihib-G | Universal | Corrosion Inhibitor | Listed Below | |||||
MX-8-4543 | Multi-Chem | Bacteria Treatment | Listed Below | |||||
Contains no hazardous substances in concentrations above cut-off values according to the competent authority |
Proprietary | 100 | 0.00250307 | 1941.57 | ||||
Contains no hazardous substances in concentrations above cut-off values according to the competent authority |
Proprietary | 100 | 0.00250307 | 1941.57 | ||||
Hydrotreated light petroleum distillate | 64742-47-8 | 30 | 0.00799786 | 6203.73 | ||||
Thiourea | 0000062-56-6 | 1 | 0.00000147 | 1.141 | ||||
Hydrotreated light petroleum distillate | 64742-47-8 | 30 | 0.0136199 | 10564.6 | ||||
Ammonium persulfate | 7727-54-0 | 13 | 0.00005315 | 41.228 | ||||
Alcohols, C10-16, ethoxylated | 0068002-97-1 | 50 | 0.00007354 | 57.042 | ||||
Methanol | 0000067-56-1 | 5 | 0.00000735 | 5.704 | ||||
Alcohols, C10-16, ethoxylated | 0068002-97-1 | 50 | 0.00007354 | 57.042 | ||||
Butyl diglycol | 0000112-34-5 | 75 | 0.000110309 | 85.563 | ||||
Thiourea | 0000062-56-6 | 1 | 0.00000147 | 1.141 | ||||
Calcium nitrate.4H2O | 13477-34-4 | 100 | 0.0374102 | 29018.1 | ||||
Ethylene glycol | 107-21-1 | 60 | 0.0143967 | 11167.1 | ||||
Ethylene glycol | 107-21-1 | 13 | 0.00005315 | 41.228 | ||||
Polyoxylated Alkly Phosphate Ester | Proprietary | 5 | 0.00133298 | 1033.95 | ||||
Formaldehyde | 0000050-00-0 | 1 | 0.00000147 | 1.141 | ||||
Alcohols, C12-C15, branched and linear, ethoxylated, propoxylated |
120313-48-6 | 5 | 0.00133298 | 1033.95 | ||||
Ethylene glycol | 107-21-1 | 5 | 0.00133298 | 1033.95 | ||||
Silica Substrate | 14808-60-7 | 100 | 14.7504 | 11,441,500.0 | ||||
Butyl diglycol | 0000112-34-5 | 75 | 0.000110309 | 85.563 | ||||
Formaldehyde | 0000050-00-0 | 1 | 0.00000147 | 1.141 | ||||
Hydrochloric Acid | 7647-01-0 | 15 | 0.0253966 | 19699.5 | ||||
Ethylene glycol | 107-21-1 | 60 | 0.0143967 | 11167.1 | ||||
Ethoxylated alcohol | Proprietary | 5 | 0.00226998 | 1760.77 | ||||
Ethylene glycol | 107-21-1 | 13 | 0.00005315 | 41.228 | ||||
Methanol | 0000067-56-1 | 5 | 0.00000735 | 5.704 | ||||
Ammonium persulfate | 7727-54-0 | 13 | 0.00005315 | 41.228 | ||||
Calcium nitrate.4H2O | 13477-34-4 | 100 | 0.0374102 | 29018.1 | ||||
Poly(oxy-1,2-ethanediyl), alpha-tridecyl-omega-hydroxy-branche d |
69011-36-5 | 5 | 0.00226998 | 1760.77 | ||||
MC-S2510T | Multi-Chem | Scale Inhibitor | Listed Below | |||||
LD-2725 | Multi-Chem | Friction Reducer | Listed Below |
For data sources see[5]
Period | Operator Name | Gas Quantity (mcf) | Gas Production Days | Oil Quantity (bbl) | Oil Production Days | Water Quantity (bbl) | Water Production Days |
---|---|---|---|---|---|---|---|
2017 | RICE DRILLING B LLC | 0.00 | 0 | 0.00 | 0 | 0.00 | 0 |
2018 | RICE DRILLING B LLC | 2,050,650.00 | 237 | 0.00 | 0 | 0.00 | 0 |
2019 | RICE DRILLING B LLC | 1,544,057.00 | 365 | 0.00 | 0 | 0.00 | 0 |
For data sources see[6]
Period | Operator | Waste Type | Quantity | Disposal Method | Waste Facility ID |
---|---|---|---|---|---|
2017 | RICE DRILLING B LLC | Servicing Fluid | 1.09 Tons | RESIDUAL WASTE TRANSFER FACILITY | 101532 |
2017 | RICE DRILLING B LLC | Drill Cuttings | 24.63 Tons | LANDFILL | 100592 |
2017 | RICE DRILLING B LLC | Other Oil & Gas Wastes | 190.00 Bbl | REUSE (AT WELL PAD) | |
2017 | RICE DRILLING B LLC | Other Oil & Gas Wastes | 355.17 Bbl | RESIDUAL WASTE PROCESSING FACILITY | WMGR123SW005 |
2017 | RICE DRILLING B LLC | Drill Cuttings | 107.53 Tons | LANDFILL | 06-08438 |
2017 | RICE DRILLING B LLC | Drilling Fluid Waste | 15.71 Bbl | REUSE (AT WELL PAD) | |
2017 | RICE DRILLING B LLC | Produced Fluid | 131.06 Bbl | RESIDUAL WASTE PROCESSING FACILITY | WMGR123SW005 |
2017 | RICE DRILLING B LLC | Drilling Fluid Waste | 3.56 Tons | RESIDUAL WASTE PROCESSING FACILITY | ODNR 2015-511 |
2017 | RICE DRILLING B LLC | Produced Fluid | 2.86 Bbl | CENTRALIZED TREATMENT PLANT FOR RECYCLE | ORDER 2016-415 |
2017 | RICE DRILLING B LLC | Produced Fluid | 16.42 Bbl | REUSE (AT WELL PAD) | |
2017 | RICE DRILLING B LLC | Synthetic Liner Materials | 1.48 Tons | LANDFILL | 100172 |
2017 | RICE DRILLING B LLC | Drill Cuttings | 265.85 Tons | LANDFILL | 100172 |
2017 | RICE DRILLING B LLC | Drill Cuttings | 493.97 Tons | LANDFILL | 100663 |
2017 | RICE DRILLING B LLC | Drilling Fluid Waste | 12.86 Bbl | INJECTION DISPOSAL WELL | 34-157-25511 |
2017 | RICE DRILLING B LLC | Other Oil & Gas Wastes | 0.33 Tons | LANDFILL | 06-08438 |
2017 | RICE DRILLING B LLC | Drill Cuttings | 17.49 Tons | LANDFILL | 100620 |
2017 | RICE DRILLING B LLC | Synthetic Liner Materials | 7.37 Tons | LANDFILL | 100663 |
2017 | RICE DRILLING B LLC | Drilling Fluid Waste | 549.33 Bbl | RESIDUAL WASTE PROCESSING FACILITY | WMGR123SW005 |
2018 | RICE DRILLING B LLC | Produced Fluid | 2,701.65 Bbl | REUSE (AT WELL PAD) | |
2018 | RICE DRILLING B LLC | Other Oil & Gas Wastes | 378.55 Bbl | REUSE (AT WELL PAD) | |
2018 | RICE DRILLING B LLC | Waste Water Treatment Sludge | 13.84 Tons | STORAGE PENDING DISPOSAL OR REUSE | MID0209062814 |
2018 | RICE DRILLING B LLC | Other Oil & Gas Wastes | 506.43 Bbl | RESIDUAL WASTE PROCESSING FACILITY | WMGR123SW005 |
2018 | RICE DRILLING B LLC | Synthetic Liner Materials | 16.56 Tons | LANDFILL | 100277 |
2018 | RICE DRILLING B LLC | Produced Fluid | 115.82 Tons | RESIDUAL WASTE PROCESSING FACILITY | 2014-541 |
2018 | RICE DRILLING B LLC | Drilling Fluid Waste | 12.80 Tons | RESIDUAL WASTE PROCESSING FACILITY | ORDER 2016-29 |
2018 | RICE DRILLING B LLC | Produced Fluid | 65.45 Bbl | RESIDUAL WASTE PROCESSING FACILITY | WMGR123SW005 |
2018 | RICE DRILLING B LLC | Produced Fluid | 0.15 Tons | RESIDUAL WASTE PROCESSING FACILITY | 301280 |
2019 | RICE DRILLING B LLC | Produced Fluid | 16.07 Bbl | SURFACE IMPOUNDMENT | 95-7-37312-19 |
2019 | RICE DRILLING B LLC | Other Oil & Gas Wastes | 1.43 Bbl | RESIDUAL WASTE PROCESSING FACILITY | WMGR123SW005 |
2019 | RICE DRILLING B LLC | Other Oil & Gas Wastes | 31.42 Bbl | REUSE (AT WELL PAD) | |
2019 | RICE DRILLING B LLC | Produced Fluid | 689.80 Bbl | RESIDUAL WASTE PROCESSING FACILITY | WMGR123SW005 |
2019 | RICE DRILLING B LLC | Produced Fluid | 1,951.77 Bbl | REUSE (AT WELL PAD) | |
2019 | RICE DRILLING B LLC | Produced Fluid | 6.49 Bbl | REUSE AT A WELL PAD OUTSIDE PENNSYLVANIA | |
2019 | RICE DRILLING B LLC | Produced Fluid | 49.34 Bbl | RESIDUAL WASTE PROCESSING FACILITY | WMGR123SW010 |
For data sources see[7]
Inspection ID | Inspection Category | Inspection Date | Inspection Type | Inspection Result | Inspection Comments |
---|---|---|---|---|---|
2551389 | Primary Facility | 2017-01-04 | Routine/Complete Inspection | No Violations Noted | Routine/complete inspection |
2587967 | Primary Facility | 2017-04-27 | Preoperation Inspection | No Violations Noted | On Thursday, April 27, 2017, I conducted a pre-operation inspection at the Thai Volcano Well Site located in North Bethlehem Township, Washington County. The inspection was conducted in response to an operator request in accordance with Act 13, Section 3258 (a.1)The Oil and Gas Act. Mr. James Davis, representing Rice Energy, was also present during the inspection.
The Act 9 sign was in place and clearly legible at the site entrance and all required documentation was available on-site. The access road, which was recently treated for dust suppression, and the well pad are in good condition. Various stages of vegetation were observed throughout the site which was stabilized with a combination of seed, mulch, erosion control blankets and vegetative growth. All perimeter BMPs have been installed and are functioning as designed. The wet pond on the southern end of the site has been competed and remains to be seeded. The seed for the wet ponds has been ordered and is expected to arrive within the week. The |
2592492 | Primary Facility | 2017-05-11 | Drilling/Alteration | No Violations Noted | Butch’s Rathole Service auger rig
Drilled a 36” wellbore and set 26” conductor casing at 50 ft. on 5/9/17. |
2599727 | Primary Facility | 2017-05-23 | Drilling/Alteration | No Violations Noted | Falcon Drilling Rig #20
Moved onto this well on 5/20/17 and resumed drilling at 62 ft. KB. The 20” casing was set at 332 ft. on 5/21/17 and cemented to surface with 31 bbls returned. The 13 3/8” casing was set at 759 ft. on 5/23/17. The operator’s drilling prognosis expected the Pittsburgh Coal seam at 650 ft. Operator contacted Department while drilling to the 13 3/8” casing point. The operator informed the Department that coal was not found at the expected depth. The operator continued to drill 30 ft. sections. A drilling break was encountered from 717 ft. to 728 ft. and the drill cuttings at that point consisted of gray shale and traces of coal. No other coal was found. The casing was set and cemented to surface with 14 bbls displaced to surface. The cement then fell 129 ft. and the casing was grouted to surface. Currently at 778 ft. and waiting on cement. |
2631418 | Primary Facility | 2017-08-29 | Drilling/Alteration | No Violations Noted | Patterson-UTI Drilling Rig #578
Moved onto this well on 8/15/17 and resumed drilling at 6308 ft. KB. KOP was at 7938 ft. EOB was at 8853 ft. MD (7642 ft. TVD). TD was at 13,794 ft. MD (7714 ft. TVD) on 8/17/17. The 5 ½” casing was set at 13,783 ft. Estimated TOC at 1200 ft. |
2748923 | Primary Facility | 2018-07-05 | Routine/Complete Inspection | No Violations Noted | This well has been completed and is producing. All well and site appear to be well maintained. There is some miscellaneous equipment on site. |
2759202 | Primary Facility | 2018-07-24 | Routine/Complete Inspection | No Violations Noted | Today I conducted a routine inspection at the Thai Volcano well pad and the following was observed.
Proper signs were displayed identifying the site. The site was stabilized with thick vegetation no erosion observed outside of the LOD. The wells were maintained no leaks or fluids around the well head. The production tanks were in good condition no leaks , rust or defects observed. Secondary containment for the site was intact and maintained. |
For data sources see[8]