If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 37-125-28427 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":40.008686,"lon":-80.393239,"icon":""}]} |
Country: United States | |
State: Pennsylvania | |
County: Washington | |
Municipality: East Finley Township | |
Operator Name: EQT PROD CO | |
Well Pad ID: | |
Farm/Lease Name: EALY 593349 | |
License Status: | |
Spud Date: | |
Permit Date: 2017-11-21 | |
Well Type: GAS | |
Unconventional Well: Y | |
Configuration: Horizontal Well | |
Conservation: No | |
Latitude: 40.008686 | |
Longitude: -80.393239 |
Date | Event |
---|---|
2017-11-21 | New Permit Application |
For data sources see[4]
Inspection ID | Inspection Category | Inspection Date | Inspection Type | Inspection Result | Inspection Comments |
---|---|---|---|---|---|
2651471 | Primary Facility | 2017-10-10 | Routine/Complete Inspection | No Violations Noted | On October 10, 2017, the Department performed an inspection of the EQT Production Co., Ealy well pad. Present at time of inspection was Walter Nelson and Bill Balog (EQT). The inspection was related to a request by the operator to meet on site to discuss site restoration.
The operator plans to remove the E&S BMPs (silt sock) along the well site access road to allow for the installation of a fence. The landowner has requested that a fence be built along the access road to accommodate grazing for his cattle. The landowner has also requested a temporary tractor access road near the freshwater impoundment to grant access to a west pasture field near the impoundment. The site is table with greater than 70% vegetative cover so removal of the silt sock would be permitted. The Department also reviewed the location of the temporary access road and approved the minor modification to ESCGP2 permit with a redline change on the E&S plan. 13 wells have been permitted to be drilled on the site. The operator has the dril |
For data sources see[5]