If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 37-125-28556 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":40.3467,"lon":-80.2008,"icon":""}]} |
Country: United States | |
State: Pennsylvania | |
County: Washington | |
Municipality: Cecil Township | |
Operator Name: UNKNOWN OPR | |
Well Pad ID: | |
Farm/Lease Name: | |
License Status: | |
Spud Date: | |
Permit Date: | |
Well Type: COMB. OIL&GAS | |
Unconventional Well: N | |
Configuration: Vertical Well | |
Conservation: No | |
Latitude: 40.3467 | |
Longitude: -80.2008 |
Inspection ID | Inspection Category | Inspection Date | Inspection Type | Inspection Result | Inspection Comments |
---|---|---|---|---|---|
2763602 | Primary Facility | 2018-08-14 | Plugging(Includes Plugged/Mined Through) | In Compliance with Schedule | Visited site before rig move later this week or next. Beltway excavation activity in general area prevented access to well, so observed from safe distance. Site needs additional work before rig can be brought in. |
2765603 | Primary Facility | 2018-08-20 | Plugging(Includes Plugged/Mined Through) | In Compliance with Schedule | Pad has been prepared and containment is in place. Rig is scheduled to mobilize midweek. |
2771005 | Primary Facility | 2018-09-05 | Plugging(Includes Plugged/Mined Through) | In Compliance with Schedule | Yost shut down, crew not on site. Boring and grouting by beltway crew in area of pad is preventing any plugging activities. |
2773302 | Primary Facility | 2018-09-11 | Plugging(Includes Plugged/Mined Through) | In Compliance with Schedule | Yost shut down, one man on site. This low lying site saw significant flooding from very heavy rains due to hurricane remnant. Mud pump was submerged by floodwaters, requiring repairs before work can continue. |
2773306 | Primary Facility | 2018-08-22 | Plugging(Includes Plugged/Mined Through) | In Compliance with Schedule | Pad has been prepared and containment is in place. Rig and equipment not mobilized yet. |
2773314 | Primary Facility | 2018-08-22 | Plugging(Includes Plugged/Mined Through) | In Compliance with Schedule | Rig and equipment mobilized, waiting on wellhead and flowline. Checked well for gas: ~4000PPM methane using Bascom Turner meter. |
2773317 | Primary Facility | 2018-08-28 | Plugging(Includes Plugged/Mined Through) | In Compliance with Schedule | Rig and equipment mobilized, waiting on wellhead and flowline. Checked well for gas: ~4000PPM methane using Bascom Turner meter.
NOTE: This inspection report replaces replaces IR 2773314 which has an incorrect date of 8/22/18. |
2773319 | Primary Facility | 2018-08-27 | Plugging(Includes Plugged/Mined Through) | In Compliance with Schedule | Yost has rig set up over well, rigging up equipment. |
2776531 | Primary Facility | 2018-09-18 | Plugging(Includes Plugged/Mined Through) | In Compliance with Schedule | Yost cleaned out hole to 345', hit clay plug. Lost circulation to mine @ 56'. TIH with bailer. |
2777102 | Primary Facility | 2018-09-19 | Plugging(Includes Plugged/Mined Through) | In Compliance with Schedule | Yost cleaned out hole to 356', TIH with bailer, made several bailer runs. Water level remains steady at mine @ 56'. |
2778728 | Primary Facility | 2018-09-24 | Plugging(Includes Plugged/Mined Through) | In Compliance with Schedule | Yost cleaned out hole to 477'. Plan to run 7" casing through mine @ 56' to gain circulation. |
2781828 | Primary Facility | 2018-10-01 | Plugging(Includes Plugged/Mined Through) | In Compliance with Schedule | Yost cleaning out hole 808'- 828', on mud with 3 7/8" tricone bit. Good circulation since 7" was successfully run and cemented. |
2782369 | Primary Facility | 2018-10-02 | Plugging(Includes Plugged/Mined Through) | In Compliance with Policy | Yost tripping back into hole to continue cleaning out well. Yesterday, they cleaned out to 1025' before shutting down. Circulation remains good. |
2786567 | Primary Facility | 2018-10-10 | Plugging(Includes Plugged/Mined Through) | In Compliance with Policy | Yost continues cleaning out well at 1896'. Yesterday, they drilled through a bridge at 1775', hit oil and drip gas. Circulation remains good. |
2787437 | Primary Facility | 2018-10-11 | Plugging(Includes Plugged/Mined Through) | In Compliance with Policy | Yost rig TOOH, ports plugged on bit. Current cleanout depth is 1957'. |
2789115 | Primary Facility | 2018-10-16 | Plugging(Includes Plugged/Mined Through) | In Compliance with Policy | Yost rig TOOH, bit plugged again. Current cleanout depth is 2146' and hole is obstructed. Although hole remains stable, the cleanout time on this hole has reached a point of concern. Many of the other beltway plugged wells began to deteriorate quickly at this point, so attainable bottom was called at 2146 feet. |
2791228 | Primary Facility | 2018-10-18 | Plugging(Includes Plugged/Mined Through) | In Compliance with Policy | Yost completed plugging well to surface. Currently rigging down to demobilize. |
For data sources see[4]