37-125-92433

Well Details

Well ID: 37-125-92433
Loading map...
Country: United States
State: Pennsylvania
County: Washington
Municipality: North Strabane Township
Operator Name: UNKNOWN OPR
Well Pad ID:
Farm/Lease Name: WM BURKETT
License Status:
Spud Date:
Permit Date:
Well Type: GAS
Unconventional Well: N
Configuration: Vertical Well
Conservation: No
Latitude: 40.211028
Longitude: -80.190139

For data sources see[1][2][3]

Well History

Date Event
1925-07-30 Drilling Completion
1926-01-01 OLD WELL

For data sources see[4]



Inspection Data

Inspections Performed

Inspection ID Inspection Category Inspection Date Inspection Type Inspection Result Inspection Comments
2471466 Primary Facility 2016-04-05 Routine/Complete Inspection No Adverse Event or Action Reported Well is intact 6 5/8" casing swaged to 2 1/4" tubing and topped w/ gauge and appears to still be plumbed into a gas line. Adjacent to wellhead is a regulator w/ its line disconnected. A nearby plugged standpipe leaks at its valve and at its plug and is probably connected to the well. A possible underground line valve between the wellhead and standpipe is in a casing riser about 2 feet high topped with a tee handle. The long, narrow, brushy wooded area beside the well is filled with old tubing of 2 different sizes from the well.
2509455 Primary Facility 2016-06-16 Routine/Partial Inspection No Adverse Event or Action Reported Checked site for any sitework to prepare for plugging - none. Well is not leaking as much gas as prior visit.
2511809 Primary Facility 2016-07-07 Routine/Partial Inspection No Adverse Event or Action Reported No site preparation by Hydrocarbon yet. Developer has begun preparing for operations by installing E&S measures. Someone has highlighted wellhead and other piping w/ white paint. Well is leaking slightly again.
2511813 Primary Facility 2016-07-11 Plugging(Includes Plugged/Mined Through) In Compliance with Schedule Hydrocarbon has built the site and mobilized all the equipment on to location. Rig is not set up as of morning inspection.
2511819 Primary Facility 2016-07-12 Plugging(Includes Plugged/Mined Through) In Compliance with Schedule Had discussions w/ Hydrocarbon on how to proceed w/ plugging. TIMCO logged hole and found TD (2532 feet) very close to well record (2560 feet).
2511820 Primary Facility 2016-07-18 Plugging(Includes Plugged/Mined Through) In Compliance with Schedule Hydrocarbon had spotted the last cement plug prior workday, preparing to top-off cement to surface.
2511821 Primary Facility 2016-07-25 Plugging(Includes Plugged/Mined Through) No Adverse Event or Action Reported Visited site after plugging to see if earthmoving by developer included wellsite - it did not.
2520261 Primary Facility 2016-09-14 Routine/Partial Inspection No Adverse Event or Action Reported Visited site to check on excavation work being done on property around plugged well (under pile of dirt) and in area of suspected 2nd well (no excavation yet).

For data sources see[5]