37-127-20013

Well Details

Well ID: 37-127-20013
Sorry, we have no imagery here.
Sorry, we have no imagery here.
Sorry, we have no imagery here.
Country: United States
State: Pennsylvania
County: Wayne
Municipality: Manchester Township
Operator Name: NEWFIELD APPALACHIA PA LLC
Well Pad ID:
Farm/Lease Name: DL TEEPLE 1 1
License Status: PLUGGED & ABANDONED
Spud Date: 2010-05-28
Permit Date: 2010-04-23
Well Type: TEST WELL
Unconventional Well: N
Configuration: Vertical Well
Conservation: Yes
Latitude: 41.827750
Longitude: -75.198147

For data sources see[1][2][3]

Well History

Date Event
2010-04-23 New Permit Application
2010-05-23 Performed Spud Operation
2010-07-14 Drilling Completion
2010-11-10 NEWLY DRILLED
2012-10-16 Drilling Completion
2012-12-27 FULLY PLUGGED

For data sources see[4]


Production Data

Period Operator Name Gas Quantity (mcf) Gas Production Days Oil Quantity (bbl) Oil Production Days Water Quantity (bbl) Water Production Days
2010 NEWFIELD APPALACHIA PA LLC 0.00 0 0.00 0 0 0
2011 NEWFIELD APPALACHIA PA LLC 0.00 0 0.00 0 0.00 0
2012 NEWFIELD APPALACHIA PA LLC 0.00 0 0.00 0 0.00 0

For data sources see[5]

Waste Data

Period Operator Waste Type Quantity Disposal Method Waste Facility ID
2010 NEWFIELD APPALACHIA PA LLC Drill Cuttings 25 Tons LANDFILL 101247
2010 NEWFIELD APPALACHIA PA LLC Drilling Fluid Waste 13,526.00 Bbl CENTRALIZED TREATMENT PLANT FOR RECYCLE PA0102784

For data sources see[6]

Inspection Data

Inspections Performed

Inspection ID Inspection Category Inspection Date Inspection Type Inspection Result Inspection Comments
1887903 Primary Facility 2010-05-27 Drilling/Alteration No Violations Noted Ziegenfuss drilling conductor. Setting 20" to rock and then move UDI rig 48 on well. Reserve pit showed some areas in base and sidewalls where there are pressure points from rocks below liner. DEP recommended pulling the liner back and placing sand to smooth out subbase of pit, and then re-line pit before drilling starts with downhole rig.
1890421 Primary Facility 2010-05-27 Drilling/Alteration No Violations Noted Lowell Angelette - Co man on site. Ziegenfuss on site drilling conductor- 20". Crew assembling UDI Rig 48. Pete Chacon of NFX on site. Inspected reserve pit. Observed some areas in base and sidewalls where there were pressure points from rocks below liner. I recommended pulling the liner back and smooting out base, and then re-lining pit prior to start of drilling to prevent any tears in liner. Operator indicated they would address the pit and correct the issue.
1890758 Primary Facility 2010-05-26 Routine/Complete Inspection Violation(s) Noted
1891343 Primary Facility 2010-06-11 Drilling/Alteration No Violations Noted UDI Rig 48 on site. Annular on BOP's tested up to 1000psi. Drilling depth 1759'. Lost 5 collars and bit downhole and are fishing out tools. See full details on inspection report.
1895948 Primary Facility 2010-06-30 Drilling/Alteration No Violations Noted UDI rig- 48 on site. In process of coring 8 1/2" hole. TIH to resume coring. BOP tested to API standards - 250 lo and 3500 hi. Drillers log on site and up to date. Reserve pit liner in good condition. Frbd= 4 feeet.
1896251 Primary Facility 2010-06-30 Follow-up Inspection No Violations Noted
1900333 Primary Facility 2010-07-22 Follow-up Inspection Violation(s) Noted No activity on site. Well is completed. Guards at entrance to site. Three rolloff containers on site. Reserve pit on site and still open. Observed a hole in liner. Appears to be a patch that has separated from the liner. Hole is approximately 12 - 18" above current fluid level. Freeboard less than 2'.
1946692 Primary Facility 2011-01-28 Routine/Complete Inspection No Violations Noted
2009356 Primary Facility 2011-10-06 Routine/Complete Inspection No Violations Noted DEP on site at 11:00 am. Operator has filed for Inactive Status. Routine inspection of well head. Site is secured with entrance gate and chain link fence around well head. Well is temporarily plugged. No activty on site at time of inspection. Inspected cellar, no visual evidence of gas leaking at well head. E&S controls appear to be in place and working . DEP off site at 11 am.
2095572 Primary Facility 2010-08-22 Plugging(Includes Plugged/Mined Through) No Violations Noted REceived call from Operator that after squeezing cement into 7" casing -observed bubbling at surface in 9x7" annulus at well head. DEP met with Company man. Observed steady bubbling in annulus. Used Altair 5 gas meter - detected 34% Methane. Spoke with Mgr. from Newfield Appalachia via conference call while on site. Discussed options to address bubbling. Plan is to expose top of 13 3/8" and monitor 9 5/8" x 7" and 9" x 13 3/8", and backside of 13 3/8" for the next two weeks while plugging operations proceed on Woodland Mgmt well and Crum Well. Upon completion of these well - Operator will return to Teeple and perform downhole work to stop gas movement.
2095577 Primary Facility 2012-08-22 Plugging(Includes Plugged/Mined Through) No Violations Noted DEP on site 10:15 am. At time of inspection, crew shoveling out cellar and exposing 13 3/8" and 20". Bubbling still present in 7 x 95/8" annulus. DEP collected isotopic gas sample for analysis. Reading with Altair 5 gas meter = 17% Methane. DEP offsite 11:15.
2099630 Primary Facility 2012-08-28 Plugging(Includes Plugged/Mined Through) No Violations Noted Follow up inspection of plugging operation. Well in process of being plugged and abandoned. WEll is currently venting gas. Operator is currently plugging another well and will return to this well to drill out cement and fix bubbling and properly plug and abandon this well as per PA State Regs. No one on site at time of inspection.
2099640 Primary Facility 2012-08-30 Plugging(Includes Plugged/Mined Through) No Violations Noted On site 14:00. No one at site during inspection. Containment still in place. Cellar full of rain water. Bubbling visible in cellar. Operator planning to return to site next week to drill out cement plugs and re-cement to eliminate gas bubbling.
2105640 Primary Facility 2012-09-20 Plugging(Includes Plugged/Mined Through) No Violations Noted Follow up on status of pluggin goperation. On 9/18 performed perforations #5 and #6 AT DEPTHS 2298' and 2224', respectively. Could not establish injection rate. On 9/19 started milling 7" casing. At time of this inspection have @ 5' milled out. Plan to mill out 15 - 20' of 7" casing. Using 8.5" mill - hole is 8.75" in diameter. At this point no change in bubbling. After milling - may swab hole and perform shut in on 7" to see inf any pressure buildup. Discussed jet washing formations. No violations observed.
2106875 Primary Facility 2012-09-27 Plugging(Includes Plugged/Mined Through) No Violations Noted Steve Watson and Kevin Costello on site to meet with Mr. Pat Parsons (Co. Man for Newfield). Since last inspection have cut window in 7" casing at 2150' - 2160'. Jetted to formation for two hours with water. Still seeing gas at surface. Determined source of gas is above this zone. Set cement plug across window from 1740' - 2190'. On 9/23 picked up mill and attempted to mill 1260-1262. Had mechanical issues with mill and tripped out of hole. On 9/25 tripped back in hole to 1230' and attempted to cut window. Had problems again with mill and had to trip out of hole. At time of this inspection - tripping back in hole with new mill to 1231' and will begin cutting new window. Operator will provde update on plugging operations to DEP.
2110103 Primary Facility 2012-10-04 Plugging(Includes Plugged/Mined Through) No Violations Noted Follow up on plugging activities. Pat Parsons - Co. Man on site. On 9/28 - cut window 1233' - 1248. On 9/29 jetted window. On 9/30 - set cement plug 1075' - 1265'. On 10/1 - tagged plug and cut window @ 930'. Tried to mill and had mechanical issues and had to TOH. On 10/2 cut window @ 932'. On 10/3 cut window 890' - 899'. On 10/4 milled another 2' to 901' and currently circulating hole clean. After cutting last window - Operator closed in rams and pressured up 7"casing to 1500 lbs. There was no change in bubbling observed. Following squeeze job, operator will leave 1000lbs on cement for @ 2hrs. While on site had conference call with Newfield. Next step is to cut another window just below surface casing shoe at a depth of @ 770'. Operator will provide updates to DEP.
2110105 Primary Facility 2012-10-10 Plugging(Includes Plugged/Mined Through) No Violations Noted On 10/9 - Operator cut window at 500 - 507' in 7" and will be cutting a shallower window at @ 450'. According to Company Man, gas bubbling has slowed significantly after the cut was made at 500'. Plan going forward is to cement across windows. Opeartor will keep DEP updated on progress.
2110188 Primary Facility 2012-10-12 Plugging(Includes Plugged/Mined Through) No Violations Noted Have completed jetting of two windows (450-455' and 500-507'). Both were sand jetted using 300 lbs for @35-40 mins each - moving jet up and down window. Currently still seeing bubbling on 9 5/8" x 7" casing at a rate of @ 1 bubble per second. Will be cementing windows in 7" and will hold 1000 lbs on cement. During milling it was indicated that chunks of cement and metal were seen in returns to surface. Plan going forward is to cement across windows cut in 7". Will leave 1000 lbs on cement overnight. Then go in hole and tag TOC, swab hole clean, and fill remaining portion of 7" to surface with pea gravel. Will weld cap with permit number on well. The cellar will be filled in to base of the 9 5/8" casing top with fravel. Cellar will remain open and will continue to monitor condition of bubbling for next several weeks. DEP will re-visit the site routinely to observe and inspect well.
2110257 Primary Facility 2012-10-15 Plugging(Includes Plugged/Mined Through) No Violations Noted Since last inspection have cut two additional windows in 7" casing at 450' and 500'. Gas bubbling at the surface has decreased substantially. Over the weekend, a cement plug was set acorss cuts from 270' to 565'. 7" was topped off with gravel and capped. At this time cellar has been backfilled to just below 9 5/8" casing. top. At the time of inspection I ovserved bubbling in 9 5/8" x 7" annulus. bubbling was sporatic - approximately 1 every 5 - 10 seconds. A welded cap is on 7" with permit #. Cellar will remain open for the next couple of weeks. Secondary containment is still in place. Rig is stacked on site along with other remaining equipment. DEP will continue to re-visit site to monitor well.
2120174 Primary Facility 2012-11-20 Plugging(Includes Plugged/Mined Through) No Violations Noted see inspection report
2156285 Primary Facility 2013-04-09 Routine/Complete Inspection Violation(s) Noted Inspected site on 4/9/13. Overall site looks good. Seed and mulch appear to be adequate. Material recovered from the well pad has been placed in a wetland. This material needs to be removed immediately. Wetland damage needs to be repaired. Also, please provide documentation of the E & S inspections conducted over the last month.
2273546 Primary Facility 2014-05-12 Site Restoration No Violations Noted Inspection conducted of the Newfield DL Teeple 1 1 Well Pad Site covered under the E&S well pad plan for the Newfield DL Teeple 1 1 Well (127-20013). Inspection conducted on 5/12/14. Inspection is to confirm Newfield’s assessment that the site meets the minimum requirements as defined in Chapter 102.22(C) for permanent stabilization which would thus fulfill the physical requirements necessary for the permits termination. The Department’s determination is that the site is in fact stabilized and meets the criteria necessary for the permit’s termination.

Violations Commited

Inspection ID Violation ID Violation Date Date Resolved Violation Code Violation Type Violation Comments
1890758 589310 05/26/2010 2010-05-26 102.4 - Failure to minimize accelerated erosion, implement E&S plan, maintain E&S controls. Failure to stabilize site until total site restoration under OGA Sec 206(c)(d) Environmental Health & Safety Filter sock set within 8' from the toe of slope, filter media absent in areas along sections of sock
1890758 589311 05/26/2010 2010-05-26 78.56LINER - Improperly lined pit Administrative Pit had several pressure points under the liner.
1900333 591732 07/22/2010 2010-07-22 78.56(1) - Pit and tanks not constructed with sufficient capacity to contain pollutional substances. Administrative
1900333 591733 07/22/2010 2010-07-22 78.56LINER - Improperly lined pit Administrative
2156285 665240 04/09/2013 2013-04-09 105.11 - Water obstruction or encroachment constructed, operated, maintained, modified, enlarged or abandoned without a 105 permit. Administrative

Penalties Applied

Violation ID Penalty ID Penalty Code Penalty Status Penalty Date Enforcement Date Penalty Amount Amount Collected
665240 296322 NOV - Notice of Violation

For data sources see[7]

References