If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 37-129-20513 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":40.469528,"lon":-79.437806,"icon":""}]} |
Country: United States | |
State: Pennsylvania | |
County: Westmoreland | |
Municipality: Loyalhanna Township | |
Operator Name: HOOVER TIMOTHY M | |
Well Pad ID: | |
Farm/Lease Name: L MYRTLE WADDLE 4550 | |
License Status: INACTIVE | |
Spud Date: | |
Permit Date: 1968-03-05 | |
Well Type: GAS | |
Unconventional Well: N | |
Configuration: Vertical Well | |
Conservation: No | |
Latitude: 40.469528 | |
Longitude: -79.437806 |
Date | Event |
---|---|
1968-01-09 | Performed Spud Operation |
1968-03-05 | New Permit Application |
1968-03-26 | Drilling Completion |
1968-06-27 | NEWLY DRILLED |
For data sources see[4]
Period | Operator Name | Gas Quantity (mcf) | Gas Production Days | Oil Quantity (bbl) | Oil Production Days | Water Quantity (bbl) | Water Production Days |
---|---|---|---|---|---|---|---|
1991 | KRIEBEL GAS INC | 2167.00 | 283 | 0.00 | 0 | 0.00 | 0 |
1996 | KRIEBEL GAS INC | 2692 | 366 | 0.00 | 0 | 0.00 | 0 |
1997 | KRIEBEL GAS INC | 2615 | 369 | 0.00 | 0 | 0.00 | 0 |
1998 | KRIEBEL GAS INC | 2477 | 365 | 0.00 | 0 | 0.00 | 0 |
1999 | KRIEBEL GAS INC | 279 | 31 | 0.00 | 0 | 0.00 | 0 |
2000 | 1064 | 145 | 0.00 | 0 | 0.00 | 0 | |
2001 | 2712 | 321 | 0.00 | 0 | 0.00 | 0 | |
2002 | 2969 | 365 | 0.00 | 0 | 0.00 | 0 | |
2003 | 2752 | 365 | 0.00 | 0 | 0.00 | 0 | |
2004 | 2427 | 322 | 0.00 | 0 | 0.00 | 0 | |
2005 | 2521 | 348 | 0.00 | 0 | 0.00 | 0 | |
2006 | 2439.00 | 346 | 0.00 | 0 | 0.00 | 0 | |
2007 | 2238.00 | 365 | 0.00 | 0 | 0.00 | 0 | |
2008 | 1773.00 | 294 | 0.00 | 0 | 0.00 | 0 | |
2009 | KRIEBEL MINERALS INC | 1213 | 244 | 0.00 | 0 | 0.00 | 0 |
2010 | KRIEBEL MINERALS INC | 1,756.00 | 365 | 0.00 | 0 | 0.00 | 0 |
2011 | KRIEBEL MINERALS INC | 1,518.00 | 334 | 0.00 | 0 | 0.00 | 0 |
2012 | KRIEBEL MINERALS INC | 1,354.00 | 333 | 0.00 | 0 | 0.00 | 0 |
2013 | KRIEBEL MINERALS INC | 1,003.00 | 292 | 0.00 | 0 | 0.00 | 0 |
2014 | HOOVER TIMOTHY M | 1,380.00 | 352 | 0.00 | 0 | 0.00 | 0 |
2015 | HOOVER TIMOTHY M | 1,304.00 | 348 | 0.00 | 0 | 0.00 | 0 |
2016 | HOOVER TIMOTHY M | 12.00 | 29 | 0.00 | 0 | 0.00 | 0 |
2018 | HOOVER TIMOTHY M | 0.00 | 0 | 0.00 | 0 | 0.00 | 0 |
For data sources see[5]
Inspection ID | Inspection Category | Inspection Date | Inspection Type | Inspection Result | Inspection Comments |
---|---|---|---|---|---|
2438854 | Primary Facility | 2016-01-07 | Plugging(Includes Plugged/Mined Through) | No Violations Noted | Met with Operator to inspect well and review temporary AM of Plugging and plan for Inactive well status. Approved conditional upon Operator's ability to achieve compliance with the scope of plan. |
2439596 | Primary Facility | 2016-01-08 | Plugging(Includes Plugged/Mined Through) | No Violations Noted | Operator running cement top tool into well at time of inspection. Inspected packer and scope of plan progress which was good. |
2439648 | Primary Facility | 2016-01-11 | Plugging(Includes Plugged/Mined Through) | No Violations Noted | Operator established cement top @ 2570'-ran 1" in well bore-pressure tested @1400psi for 5 min-test good-running 4" pipe in well bore ahead of cement at time of inspection. All ok at this point. |
2440684 | Primary Facility | 2016-01-14 | Plugging(Includes Plugged/Mined Through) | No Violations Noted | Operator ran and cemented 4" to surface over 2" production casing and installed a 4x2 wellhead with 2" shut in. |
2832849 | Primary Facility | 2019-01-29 | Routine/Complete Inspection | No Violations Noted | System running no issues at site |
For data sources see[6]