If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 37-129-20738 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":40.396639,"lon":-79.317444,"icon":""}]} |
Country: United States | |
State: Pennsylvania | |
County: Westmoreland | |
Municipality: Derry Township | |
Operator Name: ALLIANCE PETRO CO LLC | |
Well Pad ID: | |
Farm/Lease Name: E LIEBEL C219 | |
License Status: ACTIVE | |
Spud Date: | |
Permit Date: 1974-11-26 | |
Well Type: GAS | |
Unconventional Well: N | |
Configuration: Vertical Well | |
Conservation: No | |
Latitude: 40.396639 | |
Longitude: -79.317444 |
Date | Event |
---|---|
1974-11-26 | New Permit Application |
1975-01-29 | Performed Spud Operation |
1975-02-03 | Drilling Completion |
1975-04-30 | NEWLY DRILLED |
For data sources see[4]
Period | Operator Name | Gas Quantity (mcf) | Gas Production Days | Oil Quantity (bbl) | Oil Production Days | Water Quantity (bbl) | Water Production Days |
---|---|---|---|---|---|---|---|
1994 | 1510.00 | 365 | 0.00 | 0 | 0.00 | 0 | |
1996 | PENTEX ENERGY INC | 1458 | 365 | 0.00 | 0 | 0.00 | 0 |
1997 | PENTEX ENERGY INC | 926 | 365 | 0.00 | 0 | 0.00 | 0 |
1998 | PENTEX ENERGY INC | 949 | 365 | 0.00 | 0 | 0.00 | 0 |
1999 | PENTEX ENERGY INC | 1101 | 365 | 0.00 | 0 | 0.00 | 0 |
2000 | PENTEX ENERGY INC | 608 | 365 | 0.00 | 0 | 0.00 | 0 |
2001 | PENTEX ENERGY INC | 769 | 334 | 0.00 | 0 | 0.00 | 0 |
2002 | PENTEX ENERGY INC | 661 | 365 | 0.00 | 0 | 0.00 | 0 |
2003 | PENTEX ENERGY INC | 824 | 365 | 0.00 | 0 | 0.00 | 0 |
2004 | LINN OPR LLC | 61 | 30 | 0.00 | 0 | 0.00 | 0 |
2006 | LINN OPR INC | 832.00 | 365 | 0.00 | 0 | 0.00 | 0 |
2007 | LINN OPR INC | 562.00 | 176 | 0.00 | 0 | 0.00 | 0 |
2008 | XTO ENERGY INC | 514.00 | 365 | 0.00 | 0 | 0.00 | 0 |
2009 | XTO ENERGY INC | 138.00 | 365 | 0.00 | 0 | 0.00 | 0 |
2010 | XTO ENERGY INC | 337.00 | 365 | 0.00 | 0 | 0.00 | 0 |
2011 | XTO ENERGY INC | 1,142.00 | 365 | 0.00 | 0 | 0.00 | 0 |
2012 | XTO ENERGY INC | 627.00 | 205 | 0.00 | 0 | 0.00 | 0 |
2013 | XTO ENERGY INC | 495.00 | 361 | 0.00 | 0 | 0.00 | 0 |
2014 | XTO ENERGY INC | 298.00 | 364 | 0.00 | 0 | 0.00 | 0 |
2015 | XTO ENERGY INC | 424.00 | 365 | 0.00 | 0 | 0.00 | 0 |
2016 | XTO ENERGY INC | 840.00 | 366 | 0.00 | 0 | 0.00 | 0 |
2017 | ALLIANCE PETRO CO LLC | 437.00 | 334 | 0.00 | 0 | 0.00 | 0 |
2018 | ALLIANCE PETRO CO LLC | 754.00 | 365 | 0.00 | 0 | 0.00 | 0 |
2019 | ALLIANCE PETRO CO LLC | 421.00 | 335 | 0.00 | 0 | 0.00 | 0 |
For data sources see[5]
Period | Operator | Waste Type | Quantity | Disposal Method | Waste Facility ID |
---|---|---|---|---|---|
1998 | PENTEX ENERGY INC | Brine | 77.00 Bbl | Injection Disposal Well | UNK |
1998 | PENTEX ENERGY INC | Brine | 35.00 Bbl | Brine or Industrial Waste Treatment Plt | PA0095443 |
2006 | LINN OPR INC | Brine | 80.00 Bbl | Brine or Industrial Waste Treatment Plt | PA0095273 |
2010 | XTO ENERGY INC | Produced Fluid | 64.00 Bbl | CENTRALIZED TREATMENT PLANT FOR RECYCLE | PA0095273 |
2012 | XTO ENERGY INC | Produced Fluid | 1.00 Bbl | CENTRALIZED TREATMENT PLANT FOR RECYCLE | PA0095273 |
For data sources see[6]
Inspection ID | Inspection Category | Inspection Date | Inspection Type | Inspection Result | Inspection Comments |
---|---|---|---|---|---|
2463423 | Primary Facility | 2016-03-10 | Routine/Complete Inspection | No Violations Noted | At the time of inspection well appears equipped for production. Well tag present and affixed in a permanent manner. Brine tank located on site and appears to be structurally sound. No E&S issues in relation to site and/or access road. |
2520090 | Primary Facility | 2016-09-19 | Routine/Complete Inspection | No Violations Noted | Well tagged-in production. Well head casing-equipment-100 bbl steel tank looked ok. |
For data sources see[7]