If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
| Well ID: 37-129-20821 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":40.389639,"lon":-79.36575,"icon":""}]} |
| Country: United States | |
| State: Pennsylvania | |
| County: Westmoreland | |
| Municipality: Derry Township | |
| Operator Name: ALLIANCE PETRO CO LLC | |
| Well Pad ID: | |
| Farm/Lease Name: A E DAVIS C320 | |
| License Status: ACTIVE | |
| Spud Date: | |
| Permit Date: 1975-09-30 | |
| Well Type: GAS | |
| Unconventional Well: N | |
| Configuration: Vertical Well | |
| Conservation: No | |
| Latitude: 40.389639 | |
| Longitude: -79.365750 |
| Date | Event |
|---|---|
| 1975-09-30 | New Permit Application |
| 1975-10-04 | Performed Spud Operation |
| 1975-10-08 | Drilling Completion |
| 1976-01-21 | NEWLY DRILLED |
For data sources see[4]
| Period | Operator Name | Gas Quantity (mcf) | Gas Production Days | Oil Quantity (bbl) | Oil Production Days | Water Quantity (bbl) | Water Production Days |
|---|---|---|---|---|---|---|---|
| 1994 | 4183.00 | 365 | 0.00 | 0 | 0.00 | 0 | |
| 1996 | PENTEX ENERGY INC | 3705 | 365 | 0.00 | 0 | 0.00 | 0 |
| 1997 | PENTEX ENERGY INC | 2898 | 365 | 0.00 | 0 | 0.00 | 0 |
| 1998 | PENTEX ENERGY INC | 1392 | 365 | 0.00 | 0 | 0.00 | 0 |
| 1999 | PENTEX ENERGY INC | 1483 | 365 | 0.00 | 0 | 0.00 | 0 |
| 2000 | PENTEX ENERGY INC | 1439 | 365 | 0.00 | 0 | 0.00 | 0 |
| 2001 | PENTEX ENERGY INC | 1714 | 362 | 0.00 | 0 | 0.00 | 0 |
| 2002 | PENTEX ENERGY INC | 1532 | 365 | 0.00 | 0 | 0.00 | 0 |
| 2003 | PENTEX ENERGY INC | 1748 | 365 | 0.00 | 0 | 0.00 | 0 |
| 2004 | LINN OPR LLC | 97.61 | 30 | 0.00 | 0 | 0.00 | 0 |
| 2006 | LINN OPR INC | 1119.00 | 365 | 0.00 | 0 | 0.00 | 0 |
| 2007 | LINN OPR INC | 1208.00 | 365 | 0.00 | 0 | 0.00 | 0 |
| 2008 | XTO ENERGY INC | 725.00 | 365 | 0.00 | 0 | 0.00 | 0 |
| 2009 | XTO ENERGY INC | 1175.00 | 365 | 0.00 | 0 | 0.00 | 0 |
| 2010 | XTO ENERGY INC | 765.00 | 365 | 0.00 | 0 | 0.00 | 0 |
| 2011 | XTO ENERGY INC | 913.00 | 365 | 0.00 | 0 | 0.00 | 0 |
| 2012 | XTO ENERGY INC | 676.00 | 174 | 0.00 | 0 | 0.00 | 0 |
| 2013 | XTO ENERGY INC | 589.00 | 361 | 0.00 | 0 | 0.00 | 0 |
| 2014 | XTO ENERGY INC | 62.00 | 364 | 0.00 | 0 | 0.00 | 0 |
| 2015 | XTO ENERGY INC | 38.14 | 287 | 0.00 | 0 | 0.00 | 0 |
| 2016 | XTO ENERGY INC | 1,332.63 | 336 | 0.00 | 0 | 0.00 | 0 |
| 2017 | ALLIANCE PETRO CO LLC | 1,241.00 | 334 | 0.00 | 0 | 0.00 | 0 |
| 2018 | ALLIANCE PETRO CO LLC | 2,210.00 | 365 | 0.00 | 0 | 0.00 | 0 |
For data sources see[5]
| Period | Operator | Waste Type | Quantity | Disposal Method | Waste Facility ID |
|---|---|---|---|---|---|
| 1996 | PENTEX ENERGY INC | Brine | 80.00 Bbl | Injection Disposal Well | 063-20246 |
| 2000 | PENTEX ENERGY INC | Brine | 75.00 Bbl | Brine or Industrial Waste Treatment Plt | |
| 2003 | PENTEX ENERGY INC | Brine | 70.00 Bbl | Injection Disposal Well | PAS2D322BIND |
| 2010 | XTO ENERGY INC | Produced Fluid | 7.00 Bbl | CENTRALIZED TREATMENT PLANT FOR RECYCLE | PA0095273 |
| 2012 | XTO ENERGY INC | Produced Fluid | 26.00 Bbl | CENTRALIZED TREATMENT PLANT FOR RECYCLE | PA0095273 |
For data sources see[6]
| Inspection ID | Inspection Category | Inspection Date | Inspection Type | Inspection Result | Inspection Comments |
|---|---|---|---|---|---|
| 2449041 | Primary Facility | 2016-02-10 | Routine/Complete Inspection | No Violations Noted | At the time of inspection well appears equipped for production. Well tag present and affixed in a permanent manner. Brine tank located on site and appears structurally sound. Ground snow covered and appears stable, with no observable E&S issues in relation to site and/or access road. |
| 2503730 | Primary Facility | 2016-07-20 | Routine/Complete Inspection | No Violations Noted | Well tagged-in production. Annulus was plumbed-open. Well head casing-equipment-100 bbl steel tank looked ok. |
For data sources see[7]